I applied via Naukri.com and was interviewed before Oct 2022. There was 1 interview round.
After RCC, finishing activities can be started by following a systematic approach to ensure quality and efficiency.
Inspect the RCC work to ensure it meets quality standards
Prepare the surface for finishing by cleaning and leveling
Start with plastering, painting, flooring, and other finishing works in a sequential manner
Coordinate with other trades to ensure smooth progress of finishing activities
Regularly inspect and m...
The sequence of finishing activities typically involves painting, flooring, installation of fixtures, and final cleaning.
Painting walls and ceilings
Installing flooring such as tiles or hardwood
Fixtures installation like lights, faucets, and cabinets
Final cleaning of the area
Waterproof treatment involves applying materials to prevent water penetration into structures.
Surface preparation including cleaning and repairing any cracks or holes
Application of waterproofing materials such as membranes, coatings, or sealants
Ensuring proper curing and drying time for the materials to effectively seal the surface
Regular maintenance and inspection to ensure long-lasting waterproofing
Examples: using bi...
There are primarily two types of waterproof treatments for wet areas: surface waterproofing and integral waterproofing.
Surface waterproofing involves applying a waterproof coating or membrane on the surface of the wet area to prevent water penetration.
Integral waterproofing involves adding waterproofing agents directly into the concrete mix to make the structure itself waterproof.
Examples of surface waterproofing inclu...
Mix proportion refers to the ratio of different materials used in a concrete mix to achieve desired properties.
Mix proportion is typically expressed as the ratio of cement, sand, and aggregate in a concrete mix.
For example, a common mix proportion for concrete is 1:2:4, which means 1 part cement, 2 parts sand, and 4 parts aggregate.
The mix proportion can vary depending on the desired strength, workability, and durabili
Top trending discussions
I applied via Referral
I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.
A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.
Shunt relay is connected in parallel with the main circuit of the ACB.
It detects overcurrents and activates to divert the excess current through a shunt path.
This helps in protecting the main circuit from damage due to overcurrents.
Shunt relays are commonly used in Air Circuit Breakers (ACBs...
CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.
CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.
It is often required in HVAC projects to ensure quality and compliance.
CoC may include details such as product specifications, testing results, and manufacturer information.
Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.
Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.
Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.
BOD is a ...
A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.
Monitors voltage levels in electrical systems
Triggers alarm or protective action if voltage exceeds or falls below set threshold
Used to protect equipment from damage due to voltage fluctuations
WTP plant works on the principle of physical and chemical processes to remove impurities from water.
Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.
Coagulation involves adding chemicals to water to make impurities clump together.
Flocculation helps in forming larger particles called floc for easier removal.
Sedimentation allows the floc to sett...
I provide daily and monthly reports on project progress, issues, and key metrics to track performance.
Daily reports include updates on tasks completed, challenges faced, and plans for the next day.
Monthly reports summarize overall progress, budget status, and any potential risks or delays.
Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...
posted on 2 Dec 2024
I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.
posted on 18 Mar 2025
I appeared for an interview in Feb 2025, where I was asked the following questions.
I appeared for an interview before Mar 2024, where I was asked the following questions.
based on 3 interviews
Interview experience
based on 7 reviews
Rating in categories
Associate Manager
388
salaries
| ₹5.4 L/yr - ₹13 L/yr |
Deputy Manager
328
salaries
| ₹7.2 L/yr - ₹18 L/yr |
Manager
221
salaries
| ₹9 L/yr - ₹24 L/yr |
Sales Executive
219
salaries
| ₹2 L/yr - ₹11 L/yr |
Senior Executive
206
salaries
| ₹3.9 L/yr - ₹9.5 L/yr |
JLL
CBRE
NoBroker
Cushman & Wakefield