i
L&T
Realty
Filter interviews by
Fitting out a flat involves planning, sourcing materials, and coordinating trades to meet customer specifications.
Initial consultation with the customer to understand their needs and preferences.
Creating a detailed design plan that includes layout, materials, and finishes.
Sourcing materials such as flooring, cabinetry, and fixtures based on the design plan.
Coordinating with various tradespeople, including electric...
Tiling work involves preparation, layout, installation, grouting, and finishing for a durable and aesthetic surface.
1. Surface Preparation: Ensure the substrate is clean, dry, and level. For example, use a leveling compound for uneven floors.
2. Layout Planning: Mark guidelines on the surface to ensure tiles are laid out evenly. Use a chalk line for straight lines.
3. Tile Cutting: Use a tile cutter or wet saw to cu...
We implement various engineering controls to enhance safety and prevent incidents at our site.
Safety interlocks on machinery to prevent accidental operation.
Emergency shut-off systems for quick response during hazardous situations.
Ventilation systems to control exposure to harmful fumes or dust.
Regular maintenance and inspections of equipment to ensure proper functioning.
Use of barriers and guards to protect worke...
EHS challenges include compliance, training, and incident reporting, impacting safety and operational efficiency.
Compliance with regulations: Keeping up with changing EHS regulations can be challenging, leading to potential fines.
Training gaps: Ensuring all employees are adequately trained on EHS protocols is crucial; for example, new hires may lack necessary safety training.
Incident reporting: Streamlining the in...
I have executed various finishes including matte, glossy, textured, and metallic finishes.
Matte finish: smooth and non-reflective
Glossy finish: shiny and reflective
Textured finish: rough or patterned surface
Metallic finish: shiny and metallic appearance
Plumbing system is a network of pipes, valves, and fixtures that carry water and waste to and from a building.
Plumbing systems are essential for providing clean water and removing waste from buildings.
They consist of pipes, valves, and fixtures such as sinks, toilets, and showers.
Water is supplied to the building through a main water line and distributed through smaller pipes.
Waste is removed through a drain syste...
There are various types of plumbing systems, including water supply, drainage, vent, and gas piping.
Water supply plumbing systems provide clean water to homes and buildings.
Drainage plumbing systems remove wastewater and sewage from homes and buildings.
Vent plumbing systems allow air to enter and exit the plumbing system to prevent pressure buildup.
Gas piping plumbing systems provide gas for heating and cooking pu...
I have a total experience of 8 years in MEP management.
I have worked as a MEP Manager for 5 years in XYZ company.
Prior to that, I worked as a MEP Engineer for 3 years in ABC company.
During my tenure as a MEP Manager, I successfully completed several projects within the given timeline and budget.
I have also managed a team of 10 engineers and ensured their professional growth.
Overall, my experience has equipped me w...
The pressure requirement for CP depends on the specific application and system design.
CP stands for cathodic protection, which is used to prevent corrosion in metal structures.
The pressure requirement can vary depending on factors such as the type of metal being protected, the environment, and the current density.
For example, a pipeline in a coastal area may require a higher pressure than a storage tank in a dry c...
The sequence for installation of elevators involves several steps.
First, the elevator shaft is constructed.
Next, the elevator car and its components are installed.
Then, the elevator doors and hoistway doors are installed.
After that, the elevator control system is installed and tested.
Finally, the elevator is inspected and certified for use.
I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.
Aluform Day wise process involves the daily operations and tasks carried out at Aluform.
Aluform Day wise process includes scheduling production, quality control checks, inventory management, and staff supervision.
Each day starts with a production meeting to discuss goals and priorities.
Quality control checks are conducted throughout the day to ensure products meet standards.
Inventory management involves tracking raw ma...
I appeared for an interview before Jun 2024, where I was asked the following questions.
Tiling work involves preparation, layout, installation, grouting, and finishing for a durable and aesthetic surface.
1. Surface Preparation: Ensure the substrate is clean, dry, and level. For example, use a leveling compound for uneven floors.
2. Layout Planning: Mark guidelines on the surface to ensure tiles are laid out evenly. Use a chalk line for straight lines.
3. Tile Cutting: Use a tile cutter or wet saw to cut til...
Marble is a metamorphic rock with various types, each differing in color, pattern, and origin, used in construction and art.
Carrara Marble: White or blue-grey, from Italy, famous for sculptures and buildings.
Calacatta Marble: Rare, luxurious white marble with bold veining, also from Italy.
Emperador Marble: Dark brown with lighter veins, originating from Spain, used in flooring.
Crema Marfil: Light beige marble from Spai...
Fitting out a flat involves planning, sourcing materials, and coordinating trades to meet customer specifications.
Initial consultation with the customer to understand their needs and preferences.
Creating a detailed design plan that includes layout, materials, and finishes.
Sourcing materials such as flooring, cabinetry, and fixtures based on the design plan.
Coordinating with various tradespeople, including electricians,...
I appeared for an interview before Jan 2024.
Seeking new challenges and growth opportunities in a larger organization.
Desire for career advancement
Interest in taking on more responsibilities
Looking for a more dynamic work environment
Seeking better compensation and benefits
Current challenges in EHS management
Compliance with constantly changing regulations
Ensuring employee safety in high-risk environments
Managing environmental impact and sustainability initiatives
Implementing effective training programs for EHS practices
Balancing cost-effective solutions with EHS requirements
I appeared for an interview before Jun 2024, where I was asked the following questions.
EHS challenges include compliance, training, and incident reporting, impacting safety and operational efficiency.
Compliance with regulations: Keeping up with changing EHS regulations can be challenging, leading to potential fines.
Training gaps: Ensuring all employees are adequately trained on EHS protocols is crucial; for example, new hires may lack necessary safety training.
Incident reporting: Streamlining the inciden...
We implement various engineering controls to enhance safety and prevent incidents at our site.
Safety interlocks on machinery to prevent accidental operation.
Emergency shut-off systems for quick response during hazardous situations.
Ventilation systems to control exposure to harmful fumes or dust.
Regular maintenance and inspections of equipment to ensure proper functioning.
Use of barriers and guards to protect workers fr...
I applied via Referral and was interviewed in Oct 2022. There were 3 interview rounds.
Contracts can be classified into various types based on their nature and purpose.
Contracts can be classified based on their enforceability - valid, void, voidable, and unenforceable.
They can also be classified based on their formation - express, implied, and quasi-contract.
Contracts can be classified based on their performance - executed and executory contracts.
Other types of contracts include unilateral, bilateral, al...
FIDIC is an international standard for construction contracts. There are different types of FIDIC contracts for different purposes.
FIDIC stands for International Federation of Consulting Engineers
FIDIC contracts are widely used in the construction industry worldwide
Different types of FIDIC contracts include Red Book, Yellow Book, Silver Book, and Green Book
Red Book is used for construction projects where the employer i...
Basic Rate is the minimum hourly wage paid to an employee for their work.
Basic Rate is the minimum hourly wage paid to an employee for their work.
It is determined by considering factors such as the employee's job role, experience, and industry standards.
Other items to be considered for Basic Rate include the cost of living, minimum wage laws, and collective bargaining agreements.
For example, a restaurant may have a Bas...
I seek new challenges and opportunities for growth that align with my career goals and aspirations.
Desire for professional growth: I want to take on more responsibilities and lead larger projects.
Alignment with career goals: The new role aligns better with my long-term career aspirations in management.
Seeking a dynamic environment: I'm looking for a workplace that fosters innovation and collaboration.
Desire for new cha...
Expectations are the desired outcomes or results that an individual or organization anticipates from a particular situation or task.
Expectations can be set by an individual, team, or organization.
They can be related to performance, behavior, or outcomes.
Clear communication of expectations is important for success.
Examples of expectations in a work setting include meeting deadlines, achieving sales targets, and providin...
I applied via Naukri.com and was interviewed before Sep 2023. There was 1 interview round.
I have executed various finishes including matte, glossy, textured, and metallic finishes.
Matte finish: smooth and non-reflective
Glossy finish: shiny and reflective
Textured finish: rough or patterned surface
Metallic finish: shiny and metallic appearance
Handle contractor work delays by communicating effectively, setting clear expectations, and implementing consequences for repeated delays.
Communicate with the contractor to understand the reasons for the delay
Set clear deadlines and expectations from the beginning of the project
Implement consequences for repeated delays, such as financial penalties or termination of the contract
Work with the contractor to create a plan...
I will manage a Design Build Project by creating a detailed project plan, coordinating with stakeholders, monitoring progress, and ensuring quality control.
Develop a comprehensive project plan outlining timelines, milestones, and deliverables
Collaborate with architects, engineers, contractors, and other stakeholders to ensure alignment on project goals and requirements
Regularly monitor progress and address any issues o...
I applied via Naukri.com and was interviewed before Aug 2022. There were 3 interview rounds.
None of the above, Please process
Top trending discussions
based on 11 interview experiences
Difficulty level
Duration
based on 239 reviews
Rating in categories
Assistant Manager
166
salaries
| ₹5 L/yr - ₹20 L/yr |
Senior Engineer
62
salaries
| ₹5.8 L/yr - ₹7.6 L/yr |
Manager
30
salaries
| ₹11 L/yr - ₹22 L/yr |
Senior Manager
26
salaries
| ₹16.6 L/yr - ₹33 L/yr |
Deputy General Manager
20
salaries
| ₹24.5 L/yr - ₹39 L/yr |
Omaxe
Mahindra Lifespace Developers
Runwal Group
Realty Assistant