Upload Button Icon Add office photos

Filter interviews by

Vilas Javdekar Developers Interview Questions, Process, and Tips

Updated 22 Oct 2024

Top Vilas Javdekar Developers Interview Questions and Answers

View all 19 questions

Vilas Javdekar Developers Interview Experiences

Popular Designations

27 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is 2 way wiring?
  • Ans. 

    2 way wiring is a type of electrical wiring that allows for a single light or appliance to be controlled from two different locations.

    • In 2 way wiring, two switches are used to control a single light or appliance.

    • The switches are connected in parallel to each other and to the light or appliance.

    • This type of wiring is commonly used in staircases, hallways, and rooms with multiple entry points.

    • 2 way wiring provides conven...

  • Answered by AI
  • Q2. Myvan project process of working?
  • Ans. 

    Myvan project process involves planning, designing, implementation, testing, and commissioning of electrical systems.

    • Planning phase involves determining project scope, budget, and timeline.

    • Design phase includes creating electrical drawings and specifications.

    • Implementation phase involves installing electrical components and systems.

    • Testing phase ensures that all electrical systems are functioning properly.

    • Commissioning...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice work culture of vj

Electrical Site Engineer Interview Questions asked at other Companies

Q1. What is the maximum range of voltage rating for belted cables are in used?
View answer (5)
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Basic questions
Round 2 - Technical 

(1 Question)

  • Q1. How desperate are you to join vj?
Round 3 - One-on-one 

(1 Question)

  • Q1. What bad things you've heard about us?

Interview Preparation Tips

Interview preparation tips for other job seekers - They're self obsessed also they disburse incentives on yearly and mid yearly basis so if you're good at sales choose wisely

Senior Sales Manager Interview Questions asked at other Companies

Q1. What is YTD targets and how can you achieve
View answer (4)
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Area of work in previous organisation?
  • Q2. How to check quality of raw material?
  • Ans. 

    Quality of raw material can be checked through visual inspection, testing, supplier audits, and documentation review.

    • Perform visual inspection for any defects, damages, or inconsistencies

    • Conduct testing such as chemical analysis, mechanical testing, or microbiological testing

    • Audit suppliers to ensure they meet quality standards and have proper processes in place

    • Review documentation including certificates of analysis, m...

  • Answered by AI

Quality Engineer Interview Questions asked at other Companies

Q1. What is MSA and addition of msa version, type of msa ,what different between variable data and attibute data .why difine flase and miss rate calculate by msa .
View answer (8)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is the PRV Section
  • Ans. 

    PRV Section stands for Pressure Reducing Valve Section, which is a component in plumbing systems to regulate water pressure.

    • PRV Section is a component in plumbing systems that helps regulate water pressure to prevent damage to pipes and fixtures.

    • It is typically located near the main water supply line entering a building.

    • PRV Sections are commonly used in residential, commercial, and industrial plumbing systems.

    • They work...

  • Answered by AI
  • Q2. Full form of MTA
  • Ans. 

    MTA stands for Microsoft Technology Associate.

    • MTA is a certification program offered by Microsoft for individuals seeking entry-level IT positions.

    • MTA exams cover a wide range of topics including networking, security, and database administration.

    • Earning an MTA certification can help individuals demonstrate their knowledge and skills in specific technology areas.

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Soppose your toilet internal pipe chock up how to clear
  • Ans. 

    To clear a clogged toilet internal pipe, use a plunger or a plumbing snake.

    • Use a plunger to try and dislodge the clog by creating suction and pressure.

    • If the plunger doesn't work, use a plumbing snake to physically break up the clog and pull it out.

    • Avoid using chemical drain cleaners as they can damage the pipes and be harmful to the environment.

  • Answered by AI
  • Q2. What is your streanth

Plumbing Supervisor Interview Questions asked at other Companies

Q1. How to maintain good work with low budget.
View answer (1)

Vilas Javdekar Developers interview questions for popular designations

 Civil Site Engineer

 (2)

 Junior Engineer Civil

 (2)

 Senior Civil Engineer

 (2)

 Site Engineer

 (2)

 Account Assistant

 (1)

 Assistant General Manager Facilities

 (1)

 Electrical Site Engineer

 (1)

 Engineering Manager

 (1)

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 26 Jul 2023

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

General mcq questions related to work and civil engineering

Round 3 - Technical 

(3 Questions)

  • Q1. Prepare everything related to field work of site. Will be a pro
  • Q2. What is curing period of concrete
  • Ans. 

    Curing period of concrete is the duration during which the concrete is kept moist to ensure proper hydration and strength development.

    • Curing period typically lasts for 7 to 28 days depending on the type of concrete mix and environmental conditions.

    • Proper curing helps in reducing cracks, increasing durability, and achieving desired strength.

    • Common curing methods include ponding, wet covering, and using curing compounds.

    • ...

  • Answered by AI
  • Q3. How is brick masonry done
  • Ans. 

    Brick masonry is the process of laying bricks in a specific pattern using mortar to create walls, buildings, or other structures.

    • Prepare the surface by cleaning and wetting it

    • Lay a bed of mortar on the surface

    • Place the bricks in the desired pattern, tapping them into place with a trowel

    • Use a spirit level to ensure the bricks are level and plumb

    • Fill the joints between the bricks with mortar and finish them off neatly

  • Answered by AI

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (2)

Get interview-ready with Top Vilas Javdekar Developers Interview Questions

Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Group Discussion 

Work dedication , knowledge about work

Interview Preparation Tips

Interview preparation tips for other job seekers - Practical knowledge

Account Assistant Interview Questions asked at other Companies

Q1. How many types of invoices to process
View answer (4)

Jobs at Vilas Javdekar Developers

View all
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
Not Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Only asking sallary slip and experience letter
  • Q2. Not asking any questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Plz keep experience letter and sallary slip

Junior Engineer Civil Interview Questions asked at other Companies

Q1. What is your name Where are you from Ratio of M 20 grade concrete. How to find the weight of steel bar used in reinforcement ? How to measurements the concrete volume? Standard size of brick. What is volume of cement bag 50 kg? How to calcu... read more
View answer (2)
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Previous salary
  • Ans. 

    I am currently earning $70,000 per year.

    • My previous salary was $70,000 per year.

    • I am open to discussing salary expectations for this new role.

    • I believe my skills and experience warrant a competitive salary.

  • Answered by AI
  • Q2. Notice period ………

Interview Preparation Tips

Interview preparation tips for other job seekers - Get salary as you going to work like contractor engineer in this company

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (4)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Group Discussion 

Perform all electrical activity at site quality & safety fast in electrical work any problem solving skills in electrical work proper management of materials and workmanship
Capable of working independently and in a team

Interview Preparation Tips

Topics to prepare for Vilas Javdekar Developers Senior Electrical Supervisor interview:
  • Conferences
  • Whatever be the question, answer
  • Keep your mind calm, don't think
Interview preparation tips for other job seekers - Electrician work teem work fast poin safety

Senior Electrical Supervisor Interview Questions asked at other Companies

Q1. What are safely precautions you used in while working on height
View answer (4)
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Aptitude Test 

All construction activities

Round 3 - Technical 

(1 Question)

  • Q1. Rcc finishing activities wp

Interview Preparation Tips

Interview preparation tips for other job seekers - All finishing activities

Senior Civil Supervisor Interview Questions asked at other Companies

Q1. How many type of waterproof treatment for wet areas?
View answer (2)

Vilas Javdekar Developers Interview FAQs

How many rounds are there in Vilas Javdekar Developers interview?
Vilas Javdekar Developers interview process usually has 2-3 rounds. The most common rounds in the Vilas Javdekar Developers interview process are Technical, Resume Shortlist and HR.
How to prepare for Vilas Javdekar Developers interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Vilas Javdekar Developers. The most common topics and skills that interviewers at Vilas Javdekar Developers expect are Communication Skills, Accounting, Marketing, Project Management and Quality Assurance.
What are the top questions asked in Vilas Javdekar Developers interview?

Some of the top questions asked at the Vilas Javdekar Developers interview -

  1. Shear wall crossectional area to built up area ratio and its c...read more
  2. 2. What do you think which marketing is most preferab...read more
  3. Soppose your toilet internal pipe chock up how to cl...read more
How long is the Vilas Javdekar Developers interview process?

The duration of Vilas Javdekar Developers interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Vilas Javdekar Developers Interview Process

based on 32 interviews

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 127 Interviews
Lodha Group Interview Questions
4.0
 • 125 Interviews
DLF Interview Questions
3.9
 • 74 Interviews
Prestige Group Interview Questions
4.3
 • 36 Interviews
Brigade Group Interview Questions
4.1
 • 32 Interviews
Oberoi Realty Interview Questions
4.1
 • 17 Interviews
View all

Vilas Javdekar Developers Reviews and Ratings

based on 203 reviews

3.6/5

Rating in categories

3.5

Skill development

3.2

Work-life balance

3.5

Salary

3.3

Job security

3.5

Company culture

3.1

Promotions

3.3

Work satisfaction

Explore 203 Reviews and Ratings
SENIOR ENGINEER

Pune

8-11 Yrs

₹ 5.05-12 LPA

EXECUTIVE

Pune

2-4 Yrs

₹ 3.6-3 LPA

ASSISTANT MANAGER

Pune

1-2 Yrs

₹ 3.19541-6.45 LPA

Explore more jobs
Senior Engineer
92 salaries
unlock blur

₹4.7 L/yr - ₹12 L/yr

Junior Engineer
68 salaries
unlock blur

₹2.2 L/yr - ₹5.1 L/yr

Senior Assistant Engineer
61 salaries
unlock blur

₹3.5 L/yr - ₹8.1 L/yr

Assistant Manager
26 salaries
unlock blur

₹3.2 L/yr - ₹7 L/yr

Junior Engineer Civil
24 salaries
unlock blur

₹2.2 L/yr - ₹4.8 L/yr

Explore more salaries
Compare Vilas Javdekar Developers with

Godrej Properties

3.7
Compare

Prestige Group

4.3
Compare

Sobha

3.9
Compare

DLF

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview