Under and over reinforcement in beams and columns refers to the amount of reinforcement provided in relation to the required strength of the structure.
Under reinforcement occurs when the amount of reinforcement provided is less than what is required for the structure to carry the design loads.
Over reinforcement occurs when the amount of reinforcement provided is more than what is required for the structure, leading to ...
NDT tests of members are done to ensure structural integrity and safety.
NDT tests are non-destructive tests used to evaluate the properties of a material, component, or system without causing damage.
These tests help in detecting defects such as cracks, voids, and discontinuities that may compromise the structural integrity of the members.
By conducting NDT tests, engineers can ensure the safety and reliability of struct...
I applied via Walk-in and was interviewed before Feb 2022. There were 2 interview rounds.
One way slab is supported on two opposite sides while two way slab is supported on all four sides.
One way slab is designed to carry the load in one direction only
Two way slab is designed to carry the load in both directions
One way slab is economical for small spans and light loads
Two way slab is suitable for larger spans and heavy loads
One way slab requires less reinforcement compared to two way slab
If the ratio of length and width of slab is 2 or more, then it's a two-way slab.
A two-way slab is supported by beams on all four sides.
The ratio of length and width determines the direction of the main reinforcement.
A one-way slab is supported by beams on two opposite sides only.
I applied via Campus Placement and was interviewed in Sep 2022. There were 3 interview rounds.
I am a Site Engineer with expertise in cement density, brick size, and concrete grade.
I have extensive knowledge of different types of cement and their densities.
I am familiar with various brick sizes and their applications in construction.
I have experience working with different concrete grades for different structural requirements.
I can provide recommendations on the appropriate cement density, brick size, and concre
I am a dedicated and experienced Site Engineer with a strong background in construction and project management.
Bachelor's degree in Civil Engineering
5 years of experience in managing construction projects
Proficient in using construction software and tools
Strong problem-solving and decision-making skills
Excellent communication and leadership abilities
Completed successful projects such as building a commercial complex an
My family background is diverse and has influenced my values and work ethic.
My parents are both engineers, which inspired me to pursue a career in engineering.
I come from a close-knit family that values education and hard work.
My grandparents were farmers, teaching me the importance of perseverance and adaptability.
I have a sibling who is a doctor, which has given me insights into the medical field.
My family has always...
I applied via Referral and was interviewed in Jan 2023. There were 2 interview rounds.
I have worked on various civil engineering projects including construction of highways, bridges, and buildings.
Managed the construction of a 10 km highway project, ensuring timely completion and adherence to safety standards
Designed and supervised the construction of a 5-story commercial building, ensuring structural integrity and compliance with local regulations
Led a team of engineers in the construction of a pedestr...
Various tests are done on aggregates, including sieve analysis, specific gravity, and absorption.
Sieve analysis determines the particle size distribution of the aggregate.
Specific gravity test measures the density of the aggregate compared to water.
Absorption test determines the amount of water absorbed by the aggregate.
Other tests include soundness test, crushing value test, and impact value test.
The results of these ...
I applied via Approached by Company and was interviewed before Mar 2021. There was 1 interview round.
I applied via Walk-in and was interviewed in May 2024. There were 3 interview rounds.
The number of concrete blocks required for 100sft depends on the size of the blocks and the thickness of the wall being built.
The number of concrete blocks needed can be calculated by dividing the total area (100sft) by the area of one block.
The size of the concrete block and the thickness of the wall will determine the number of blocks needed.
For example, if each concrete block is 1ft x 1ft and the wall is 4 inches th
Concrete density is the mass per unit volume of concrete.
Concrete density is typically measured in kilograms per cubic meter (kg/m^3).
The density of normal concrete is around 2400 kg/m^3.
Higher density concrete, such as heavyweight concrete, can have densities up to 4000 kg/m^3.
Lightweight concrete, on the other hand, can have densities as low as 1600 kg/m^3.
The thickness for outer and inner walls plastering typically ranges from 12mm to 20mm.
The thickness of plastering for outer walls is usually around 15mm to 20mm.
The thickness of plastering for inner walls is typically around 12mm to 15mm.
The thickness may vary based on the type of wall surface and the desired finish.
It is important to ensure proper curing and finishing for a durable and aesthetically pleasing result.
Various types of formwork have been used in my recently worked companies, including timber formwork, steel formwork, and aluminum formwork.
Timber formwork is commonly used for small to medium-sized projects due to its cost-effectiveness and flexibility.
Steel formwork is preferred for large and complex structures due to its durability and reusability.
Aluminum formwork is lightweight and easy to handle, making it suitabl
The mix proportion of plastering mortar typically consists of 1 part cement to 3-4 parts sand.
The mix proportion of plastering mortar is usually 1:3 or 1:4 (cement:sand)
The mix can also include lime to improve workability and durability
Water is added to achieve the desired consistency for application
Example: A common mix proportion for plastering mortar is 1 part cement, 3 parts sand, and water as needed
The materials required in 1m3 of plastering mortar include cement, sand, and water.
Cement is typically used in the ratio of 1:4 for plastering mortar.
Sand is used in the ratio of 3-4 times the amount of cement used.
Water is added as needed to achieve the desired consistency.
For example, for 1m3 of plastering mortar, you may need 0.25m3 of cement, 1m3 of sand, and water as needed.
Test was based on numerical, reasoning and verbal,Geometry,Profit & loss, Algebra, Simplication, trigonometry,Load calculation,etc
Yes, I am willing to work for 1-3 years at Sobha Ltd to contribute to the growth of the company and gain knowledge in the technical world of Civil engineering.
I am committed to continuous learning and professional development in the field of Civil engineering.
I understand the importance of gaining practical experience and knowledge to contribute effectively to the growth of the company.
I am excited about the opportunit...
based on 1 interview
Interview experience
Senior Engineer
92
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
68
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Assistant Engineer
61
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
26
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer Civil
24
salaries
| ₹0 L/yr - ₹0 L/yr |
Godrej Properties
Prestige Group
Sobha
DLF