i
L&T Realty
Filter interviews by
I applied via Naukri.com and was interviewed before Nov 2021. There were 3 interview rounds.
There are various types of plumbing systems, including water supply, drainage, vent, and gas piping.
Water supply plumbing systems provide clean water to homes and buildings.
Drainage plumbing systems remove wastewater and sewage from homes and buildings.
Vent plumbing systems allow air to enter and exit the plumbing system to prevent pressure buildup.
Gas piping plumbing systems provide gas for heating and cooking purpose...
Plumbing system is a network of pipes, valves, and fixtures that carry water and waste to and from a building.
Plumbing systems are essential for providing clean water and removing waste from buildings.
They consist of pipes, valves, and fixtures such as sinks, toilets, and showers.
Water is supplied to the building through a main water line and distributed through smaller pipes.
Waste is removed through a drain system tha...
The sequence of plumbing works in a toilet starts with rough-in plumbing, followed by installation of drain and vent pipes, water supply lines, and finally fixtures.
Rough-in plumbing involves installing the drain and vent pipes in the walls and floors.
Next, water supply lines are installed, which connect to the main water supply and run to the toilet tank and sink.
Finally, fixtures such as the toilet bowl, tank, and si...
There are various types of pumps used in MEP systems, including centrifugal, positive displacement, and axial flow pumps.
Centrifugal pumps are commonly used in HVAC systems and move fluid by converting rotational kinetic energy to hydrodynamic energy.
Positive displacement pumps move fluid by trapping a fixed amount of fluid and forcing it into the discharge pipe.
Axial flow pumps are used for high flow and low head appl...
The sequence for installation of elevators involves several steps.
First, the elevator shaft is constructed.
Next, the elevator car and its components are installed.
Then, the elevator doors and hoistway doors are installed.
After that, the elevator control system is installed and tested.
Finally, the elevator is inspected and certified for use.
Valves are devices that control the flow of fluids or gases. There are several types of valves used in various industries.
Gate valves
Globe valves
Ball valves
Butterfly valves
Check valves
Diaphragm valves
Needle valves
Pinch valves
Pressure relief valves
Safety valves
The pressure requirement for CP depends on the specific application and system design.
CP stands for cathodic protection, which is used to prevent corrosion in metal structures.
The pressure requirement can vary depending on factors such as the type of metal being protected, the environment, and the current density.
For example, a pipeline in a coastal area may require a higher pressure than a storage tank in a dry climat...
I currently live in New York City.
I live in the heart of Manhattan.
I enjoy the vibrant city life and the diverse culture.
Living in New York City allows me to be close to various job opportunities and networking events.
I appreciate the convenience of having access to a wide range of amenities and services.
I have a total experience of 8 years in MEP management.
I have worked as a MEP Manager for 5 years in XYZ company.
Prior to that, I worked as a MEP Engineer for 3 years in ABC company.
During my tenure as a MEP Manager, I successfully completed several projects within the given timeline and budget.
I have also managed a team of 10 engineers and ensured their professional growth.
Overall, my experience has equipped me with t...
Seeking new challenges and growth opportunities
Looking for a role with more responsibilities and leadership opportunities
Desire to work in a different industry or sector
Seeking a better work-life balance
Company restructuring or downsizing
Relocation to a different city or country
Lack of career advancement or professional development in current organization
I applied via Walk-in and was interviewed in Dec 2024. There was 1 interview round.
posted on 15 Dec 2023
I applied via Walk-in and was interviewed in Nov 2023. There were 4 interview rounds.
I applied via Campus Placement and was interviewed in May 2024. There were 2 interview rounds.
Construction in civil
Total Float is the amount of time a schedule activity can be delayed without delaying the project completion date.
Total Float is calculated by subtracting the Early Start date of an activity from its Late Start date.
It indicates the flexibility in scheduling a particular activity.
Activities with zero Total Float are considered critical path activities.
Total Float helps project managers in managing project schedules eff
Rate analysis of shuttering involves calculating the cost of materials, labor, and equipment for formwork used in construction projects.
Rate analysis of shuttering includes determining the quantity of materials needed for formwork, such as plywood, steel props, and scaffolding.
Labor costs for assembling and dismantling the formwork are also considered in the rate analysis.
Equipment costs, such as rental of concrete mix...
I applied via Job Portal and was interviewed before Mar 2023. There were 3 interview rounds.
STP stands for Sewage Treatment Plant, which is used to treat wastewater before releasing it back into the environment.
There are different types of STPs such as activated sludge process, sequencing batch reactor, and membrane bioreactor.
The type of STP used depends on factors like the volume of wastewater to be treated, space availability, and treatment requirements.
For example, an activated sludge process is commonly ...
I applied via Approached by Company and was interviewed in Nov 2021. There were 2 interview rounds.
The minimum slope for drainage pipe should be 1/4 inch per foot.
The slope ensures proper flow of water and prevents clogging.
The slope may vary depending on the type of pipe and the material used.
The slope should be checked during installation and adjusted if necessary.
A slope of 1/8 inch per foot may be acceptable for larger pipes.
The slope should always be towards the main drain or sewer line.
posted on 6 Feb 2022
I applied via Company Website and was interviewed in Jan 2022. There was 1 interview round.
based on 1 review
Rating in categories
Assistant Manager
161
salaries
| ₹5.5 L/yr - ₹19 L/yr |
Senior Engineer
59
salaries
| ₹5.8 L/yr - ₹7.6 L/yr |
Senior Manager
24
salaries
| ₹16.6 L/yr - ₹33 L/yr |
Manager
24
salaries
| ₹11 L/yr - ₹21 L/yr |
Deputy General Manager
18
salaries
| ₹24.5 L/yr - ₹35 L/yr |
DLF
Godrej Properties
Sobha
Prestige Group