i
Aparna Constructions and Estates
Filter interviews by
I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.
Waterproofing in a toilet room is essential to prevent water damage and maintain structural integrity.
Waterproofing materials such as membranes, sealants, and coatings are used to protect surfaces from water penetration.
Proper installation of waterproofing systems is crucial to ensure long-term effectiveness.
Regular maintenance and inspections are necessary to identify and address any issues with waterproofing.
Examples...
The weight of 1 meter length depends on the material being measured.
The weight of 1 meter length can vary depending on the material, such as steel, aluminum, wood, etc.
To calculate the weight, you need to know the density of the material.
For example, the weight of 1 meter length of steel would be different from 1 meter length of wood.
The number of bricks in 1m^3 depends on the size of the bricks being used.
The number of bricks in 1m^3 will vary based on the size of the bricks.
Calculate the volume of a single brick and then divide 1m^3 by that volume to get the number of bricks.
For example, if a brick is 0.2m x 0.1m x 0.05m, its volume would be 0.001m^3. Therefore, 1m^3 would contain 1000 bricks.
Top trending discussions
I applied via Walk-in and was interviewed in Apr 2024. There were 3 interview rounds.
Conduct the offline test
Density of common construction materials
Steel: 7850 kg/m^3
Cement: 1440 kg/m^3
Concrete: 2400 kg/m^3
Sand: 1600-1700 kg/m^3
Aggregates: 1500-1750 kg/m^3
Triangle concrete quantity can be found using the formula: 1/2 * base * height * thickness.
Calculate the area of the triangle using the formula: 1/2 * base * height.
Multiply the area by the thickness to get the concrete quantity.
For example, if the base of the triangle is 5 meters, height is 8 meters, and thickness is 0.2 meters, the concrete quantity would be: 1/2 * 5 * 8 * 0.2 = 4 cubic meters.
Circular column concrete quantity can be found using the formula: Volume = πr^2h
Calculate the area of the circular column using the formula A = πr^2
Measure the height of the column
Multiply the area by the height to get the volume of concrete needed
Consider any additional factors such as wastage or reinforcement bars
Slump test is a method to measure the consistency of concrete before it sets.
Slump test is used to determine the workability of fresh concrete.
It involves filling a cone-shaped mold with concrete, then lifting the mold to see how much the concrete slumps or settles.
The amount of slump indicates the consistency of the concrete - a higher slump means a more workable mix.
Slump test helps in ensuring that the concrete mix ...
Compressive strength of concrete is typically measured after 14 and 28 days to assess its strength development.
Compressive strength of concrete is usually measured in pounds per square inch (psi) or megapascals (MPa).
After 14 days, the average compressive strength of concrete is around 60-75% of its ultimate strength.
After 28 days, the concrete typically reaches about 90-95% of its ultimate strength.
The percentage of s...
Mix ratios of concrete refer to the proportions of cement, sand, and aggregate used in a concrete mix.
Mix ratios are typically expressed as a ratio of cement:sand:aggregate, such as 1:2:4.
The mix ratio will vary depending on the strength and durability requirements of the concrete.
Common mix ratios include 1:2:3 for low strength concrete and 1:1.5:3 for high strength concrete.
Water is also added to the mix to achieve t
posted on 16 Nov 2021
I applied via Naukri.com and was interviewed in Oct 2021. There were 3 interview rounds.
Building construction procedure involves several stages from planning to completion.
Planning and design
Site preparation and foundation
Structural framework
Installation of utilities and systems
Interior and exterior finishing
Inspection and testing
Handover and maintenance
Civil works include construction, maintenance, and repair of infrastructure such as roads, bridges, buildings, and water systems.
Road construction
Bridge construction
Building construction
Water system construction
Maintenance of roads, bridges, buildings, and water systems
Repair of roads, bridges, buildings, and water systems
Mivan slab cycle is a construction technique using aluminum formwork for casting slabs in a repetitive cycle.
Mivan slab cycle involves setting up aluminum formwork panels for casting slabs.
The cycle includes fixing reinforcement, pouring concrete, curing, and then dismantling the formwork for reuse.
This method is efficient, cost-effective, and results in high-quality finishes.
Mivan slab cycle reduces construction time ...
Before concreting, ensure proper formwork, reinforcement placement, concrete mix design, and weather conditions.
Check formwork for proper alignment and stability
Ensure reinforcement bars are correctly placed as per design
Verify concrete mix design meets project specifications
Monitor weather conditions to prevent issues like rain or extreme temperatures affecting the concrete
My expected salary is based on my qualifications, experience, and the industry standards.
I am looking for a competitive salary that reflects my skills and experience in the civil engineering field.
I have researched the average salary range for Civil Site Engineers in this region and industry.
I am open to negotiation based on the overall compensation package offered by the company.
I am looking for a salary that aligns w...
I applied via Naukri.com and was interviewed in May 2024. There were 2 interview rounds.
Under and over reinforcement in beams and columns refers to the amount of reinforcement provided in relation to the required strength of the structure.
Under reinforcement occurs when the amount of reinforcement provided is less than what is required for the structure to carry the design loads.
Over reinforcement occurs when the amount of reinforcement provided is more than what is required for the structure, leading to ...
NDT tests of members are done to ensure structural integrity and safety.
NDT tests are non-destructive tests used to evaluate the properties of a material, component, or system without causing damage.
These tests help in detecting defects such as cracks, voids, and discontinuities that may compromise the structural integrity of the members.
By conducting NDT tests, engineers can ensure the safety and reliability of struct...
posted on 23 Dec 2022
I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Feb 2021. There were 4 interview rounds.
Civil site related work objective test
I applied via Company Website and was interviewed in Sep 2023. There were 3 interview rounds.
Column lap length is the length of overlap between two reinforcing bars in a column.
Column lap length is important for ensuring proper structural integrity in a column.
It is typically specified in construction drawings or codes.
The lap length is determined based on the diameter of the reinforcing bars and the structural requirements.
For example, a column may require a lap length of 40 times the diameter of the bar.
2D and 4D refer to dimensions in geometry and physics.
2D refers to two-dimensional space, like a flat surface with length and width.
4D refers to four-dimensional space, which includes the three dimensions of space (length, width, height) and the dimension of time.
Examples of 2D objects include a square or a circle, while examples of 4D concepts include spacetime in physics.
Average problems, time, train, ven daiharms, simple intrest
based on 2 reviews
Rating in categories
Assistant Engineer
188
salaries
| ₹2 L/yr - ₹6.4 L/yr |
Junior Engineer
101
salaries
| ₹2 L/yr - ₹5 L/yr |
Senior Engineer
89
salaries
| ₹4.2 L/yr - ₹9 L/yr |
Engineer
85
salaries
| ₹3.8 L/yr - ₹7.5 L/yr |
Assistant Engineer - Civil
83
salaries
| ₹2.5 L/yr - ₹5.3 L/yr |
Prestige Group
Sobha
Godrej Properties
DLF