Aparna Constructions and Estates Senior Engineer QS Interview Questions and Answers

Updated 22 Oct 2024

Aparna Constructions and Estates Senior Engineer QS Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Present Job roles and responsibilities
  • Ans. 

    Responsible for managing costs and budgets for engineering projects, preparing estimates, analyzing contracts, and ensuring compliance with regulations.

    • Prepare cost estimates for engineering projects

    • Analyze contracts and negotiate with suppliers

    • Monitor project budgets and expenses

    • Ensure compliance with regulations and quality standards

    • Collaborate with project managers and engineers

  • Answered by AI
  • Q2. Quantity take off

Interview Preparation Tips

Interview preparation tips for other job seekers - Stick to your subject and job profile

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. How to prepare measurement sheet?
  • Ans. 

    Measurement sheet is prepared by taking off quantities from drawings and specifications.

    • Review drawings and specifications to identify items to be measured

    • Take accurate measurements using appropriate tools and techniques

    • Record measurements in a systematic manner on the measurement sheet

    • Include relevant details such as dimensions, quantities, and units

    • Double-check measurements for accuracy and completeness

    • Organize the m...

  • Answered by AI
  • Q2. Current project billing process
  • Ans. 

    Our current project billing process involves tracking expenses, labor costs, and materials used to accurately bill clients.

    • We track expenses such as equipment rentals, subcontractor costs, and travel expenses.

    • Labor costs are calculated based on hours worked by each team member and their respective rates.

    • Materials used are documented and their costs are included in the billing.

    • We ensure all expenses are properly allocat...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

General knowledge question

Round 2 - Technical 

(5 Questions)

  • Q1. Previous company experience related questions
  • Q2. Technical questions
  • Q3. Structure related questions
  • Q4. Water proofing related question
  • Q5. Finishing related question

Interview Preparation Tips

Interview preparation tips for other job seekers - Development your technical knowledge
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Explain mivan slab cycle
  • Ans. 

    Mivan slab cycle is a construction technique using aluminum formwork for casting slabs in a repetitive cycle.

    • Mivan slab cycle involves setting up aluminum formwork panels for casting slabs.

    • The cycle includes fixing reinforcement, pouring concrete, curing, and then dismantling the formwork for reuse.

    • This method is efficient, cost-effective, and results in high-quality finishes.

    • Mivan slab cycle reduces construction time ...

  • Answered by AI
  • Q2. What will you ensure before concreting
  • Ans. 

    Before concreting, ensure proper formwork, reinforcement placement, concrete mix design, and weather conditions.

    • Check formwork for proper alignment and stability

    • Ensure reinforcement bars are correctly placed as per design

    • Verify concrete mix design meets project specifications

    • Monitor weather conditions to prevent issues like rain or extreme temperatures affecting the concrete

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Expected salary if selected
  • Ans. 

    My expected salary is based on my qualifications, experience, and the industry standards.

    • I am looking for a competitive salary that reflects my skills and experience in the civil engineering field.

    • I have researched the average salary range for Civil Site Engineers in this region and industry.

    • I am open to negotiation based on the overall compensation package offered by the company.

    • I am looking for a salary that aligns w...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Under and over reinf of beam and column
  • Ans. 

    Under and over reinforcement in beams and columns refers to the amount of reinforcement provided in relation to the required strength of the structure.

    • Under reinforcement occurs when the amount of reinforcement provided is less than what is required for the structure to carry the design loads.

    • Over reinforcement occurs when the amount of reinforcement provided is more than what is required for the structure, leading to ...

  • Answered by AI
  • Q2. Ndt tests of members of why it’s been done
  • Ans. 

    NDT tests of members are done to ensure structural integrity and safety.

    • NDT tests are non-destructive tests used to evaluate the properties of a material, component, or system without causing damage.

    • These tests help in detecting defects such as cracks, voids, and discontinuities that may compromise the structural integrity of the members.

    • By conducting NDT tests, engineers can ensure the safety and reliability of struct...

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Salary negotiations
  • Q2. Previous employment

Interview Preparation Tips

Interview preparation tips for other job seekers - Good interview
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Job Portal and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. BOCW acts and rules
  • Q2. Statutory document for heavy equipment
  • Ans. 

    OSHA regulations are the statutory documents for heavy equipment safety.

    • OSHA regulations outline safety requirements for heavy equipment operation

    • These regulations cover topics such as training, maintenance, and operation procedures

    • Examples of heavy equipment covered by OSHA regulations include cranes, forklifts, and excavators

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Get interview experience
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Abt work Experience?
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. About your self
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Not Selected

I applied via Naukri.com and was interviewed in Jan 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. Aluminium (mivan) structure sequence of activities?
  • Ans. 

    The sequence of activities for aluminium (mivan) structure construction involves several steps.

    • Preparing the site and marking the layout

    • Constructing the foundation and footings

    • Erecting the aluminium formwork panels

    • Fixing reinforcement bars and embedment items

    • Pouring concrete into the formwork

    • Curing the concrete

    • Stripping the formwork

    • Finishing and cleaning the structure

  • Answered by AI
  • Q2. Finishing worksequence of activities?
  • Ans. 

    The finishing work sequence of activities involves the final steps in a construction project to complete the project and prepare it for use.

    • Inspecting and correcting any defects or deficiencies

    • Installing finishes such as flooring, paint, and fixtures

    • Completing final electrical and plumbing work

    • Cleaning and tidying up the site

    • Obtaining necessary permits and certifications

    • Conducting final inspections

    • Handing over the comp

  • Answered by AI
  • Q3. Water proofing ponding test hours?
  • Ans. 

    Waterproofing ponding test hours determine the duration for which a waterproofing system can withstand water ponding.

    • Waterproofing ponding test hours measure the ability of a waterproofing system to resist water penetration under prolonged ponding conditions.

    • The test involves subjecting the waterproofing system to a specified water depth for a certain duration.

    • The duration of the test can vary depending on the project ...

  • Answered by AI
  • Q4. How much accepted 8mm to 10mm steel rod rolling margine value ?
  • Ans. 

    The accepted rolling margin value for 8mm to 10mm steel rods varies depending on the specific project requirements and industry standards.

    • The accepted rolling margin value can range from 2% to 5%.

    • It is important to consult project specifications and industry guidelines for the specific rolling margin value.

    • For example, if the rolling margin value is set at 3%, a 10mm steel rod could have a diameter between 9.7mm and 10...

  • Answered by AI
  • Q5. Unit Weight of Steel?
  • Ans. 

    The unit weight of steel refers to the weight of a given volume of steel material.

    • The unit weight of steel is typically measured in pounds per cubic foot or kilograms per cubic meter.

    • The specific unit weight of steel can vary depending on the type and grade of steel being used.

    • For example, the unit weight of structural steel is around 490 pounds per cubic foot or 7850 kilograms per cubic meter.

    • The unit weight of reinfo...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - 1) Achieve your goals, give your best.
2) Don't do over thinking.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jan 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Tell me about your past experiences
  • Ans. 

    I have extensive experience in project engineering, managing complex projects and leading cross-functional teams.

    • Managed multiple projects simultaneously, ensuring on-time delivery and within budget

    • Led a team of engineers and technicians to successfully complete a major infrastructure project

    • Implemented process improvements to increase efficiency and reduce costs

    • Collaborated with stakeholders to define project scope, o...

  • Answered by AI
  • Q2. What is your skill/KRA fit
  • Ans. 

    My skill/KRA fit is strong in project management, technical expertise, and problem-solving.

    • Extensive experience in managing complex engineering projects

    • Strong technical knowledge in relevant engineering disciplines

    • Proven ability to solve technical challenges and troubleshoot issues

    • Effective communication and leadership skills

    • Ability to work collaboratively with cross-functional teams

    • Track record of delivering projects ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be cool and calm! Ask lots of questions about role and management

Aparna Constructions and Estates Interview FAQs

How many rounds are there in Aparna Constructions and Estates Senior Engineer QS interview?
Aparna Constructions and Estates interview process usually has 1 rounds. The most common rounds in the Aparna Constructions and Estates interview process are Technical.

Tell us how to improve this page.

People are getting interviews through

based on 1 Aparna Constructions and Estates interview
Referral
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 122 Interviews
Lodha Group Interview Questions
4.0
 • 122 Interviews
DLF Interview Questions
4.0
 • 71 Interviews
Colliers India Interview Questions
3.9
 • 59 Interviews
Casagrand Interview Questions
3.9
 • 52 Interviews
Kalpataru Group Interview Questions
4.0
 • 49 Interviews
Rohan Builders Interview Questions
4.1
 • 40 Interviews
View all
Aparna Constructions and Estates Senior Engineer QS Salary
based on 11 salaries
₹5 L/yr - ₹8.2 L/yr
6% more than the average Senior Engineer QS Salary in India
View more details

Aparna Constructions and Estates Senior Engineer QS Reviews and Ratings

based on 2 reviews

4.8/5

Rating in categories

4.0

Skill development

3.0

Work-Life balance

3.0

Salary & Benefits

5.0

Job Security

4.0

Company culture

5.0

Promotions/Appraisal

4.0

Work Satisfaction

Explore 2 Reviews and Ratings
Assistant Engineer
197 salaries
unlock blur

₹2 L/yr - ₹6.4 L/yr

Junior Engineer
102 salaries
unlock blur

₹2 L/yr - ₹5 L/yr

Senior Engineer
86 salaries
unlock blur

₹4.2 L/yr - ₹9 L/yr

Engineer
83 salaries
unlock blur

₹3.8 L/yr - ₹7.5 L/yr

Assistant Engineer - Civil
83 salaries
unlock blur

₹2.5 L/yr - ₹5.3 L/yr

Explore more salaries
Compare Aparna Constructions and Estates with

Prestige Group

4.3
Compare

Sobha

3.9
Compare

Godrej Properties

3.7
Compare

DLF

4.0
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview