Measurement sheet is prepared by taking off quantities from drawings and specifications.
Review drawings and specifications to identify items to be measured
Take accurate measurements using appropriate tools and techniques
Record measurements in a systematic manner on the measurement sheet
Include relevant details such as dimensions, quantities, and units
Double-check measurements for accuracy and completeness
Organize the m...
Our current project billing process involves tracking expenses, labor costs, and materials used to accurately bill clients.
We track expenses such as equipment rentals, subcontractor costs, and travel expenses.
Labor costs are calculated based on hours worked by each team member and their respective rates.
Materials used are documented and their costs are included in the billing.
We ensure all expenses are properly allocat...
Top trending discussions
posted on 22 Oct 2024
I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.
Responsible for managing costs and budgets for engineering projects, preparing estimates, analyzing contracts, and ensuring compliance with regulations.
Prepare cost estimates for engineering projects
Analyze contracts and negotiate with suppliers
Monitor project budgets and expenses
Ensure compliance with regulations and quality standards
Collaborate with project managers and engineers
I was interviewed in Dec 2024.
The grade of concrete refers to its strength and is determined by the ratio of cement to sand to aggregate.
The grade of concrete is typically denoted by a number followed by the letter 'M', such as M20, M30, etc.
The number in the grade represents the compressive strength of the concrete in megapascals (MPa) after 28 days of curing.
For example, M20 concrete has a compressive strength of 20 MPa, while M30 concrete has a ...
The unit used for estimating painting work is square feet.
Square feet is commonly used to estimate the amount of paint needed for a project.
Other units like square meters can also be used depending on the region.
Calculations are based on the surface area to be painted.
RL in survey stands for Reduced Level, which is the vertical distance between a point and a reference point.
RL is used in surveying to determine the elevation of a point relative to a known reference point.
It is commonly used in construction projects to ensure accurate leveling of structures and surfaces.
RL can be calculated using leveling instruments such as a dumpy level or a theodolite.
For example, if a benchmark ha...
Types of cement include Portland cement, rapid-hardening cement, and sulfate-resistant cement.
Portland cement is the most common type and is used in general construction.
Rapid-hardening cement sets quickly and is often used in repair work.
Sulfate-resistant cement is used in areas where soil or water has high sulfate content.
The size of columns in civil engineering is determined based on the load they will support and the height of the structure.
Columns are sized based on the load they will support, with larger loads requiring larger columns.
The height of the structure also plays a role in determining column size, with taller structures requiring larger columns for stability.
Factors such as material strength, column spacing, and building c...
I was interviewed before Feb 2024.
Mivan slab cycle is a construction technique using aluminum formwork for casting slabs in a repetitive cycle.
Mivan slab cycle involves setting up aluminum formwork panels for casting slabs.
The cycle includes fixing reinforcement, pouring concrete, curing, and then dismantling the formwork for reuse.
This method is efficient, cost-effective, and results in high-quality finishes.
Mivan slab cycle reduces construction time ...
Before concreting, ensure proper formwork, reinforcement placement, concrete mix design, and weather conditions.
Check formwork for proper alignment and stability
Ensure reinforcement bars are correctly placed as per design
Verify concrete mix design meets project specifications
Monitor weather conditions to prevent issues like rain or extreme temperatures affecting the concrete
My expected salary is based on my qualifications, experience, and the industry standards.
I am looking for a competitive salary that reflects my skills and experience in the civil engineering field.
I have researched the average salary range for Civil Site Engineers in this region and industry.
I am open to negotiation based on the overall compensation package offered by the company.
I am looking for a salary that aligns w...
I applied via Naukri.com and was interviewed in May 2024. There were 2 interview rounds.
Under and over reinforcement in beams and columns refers to the amount of reinforcement provided in relation to the required strength of the structure.
Under reinforcement occurs when the amount of reinforcement provided is less than what is required for the structure to carry the design loads.
Over reinforcement occurs when the amount of reinforcement provided is more than what is required for the structure, leading to ...
NDT tests of members are done to ensure structural integrity and safety.
NDT tests are non-destructive tests used to evaluate the properties of a material, component, or system without causing damage.
These tests help in detecting defects such as cracks, voids, and discontinuities that may compromise the structural integrity of the members.
By conducting NDT tests, engineers can ensure the safety and reliability of struct...
I applied via Job Portal and was interviewed in May 2024. There was 1 interview round.
OSHA regulations are the statutory documents for heavy equipment safety.
OSHA regulations outline safety requirements for heavy equipment operation
These regulations cover topics such as training, maintenance, and operation procedures
Examples of heavy equipment covered by OSHA regulations include cranes, forklifts, and excavators
posted on 24 Aug 2024
I applied via Company Website and was interviewed in Jan 2023. There were 2 interview rounds.
I have extensive experience in project engineering, managing complex projects and leading cross-functional teams.
Managed multiple projects simultaneously, ensuring on-time delivery and within budget
Led a team of engineers and technicians to successfully complete a major infrastructure project
Implemented process improvements to increase efficiency and reduce costs
Collaborated with stakeholders to define project scope, o...
My skill/KRA fit is strong in project management, technical expertise, and problem-solving.
Extensive experience in managing complex engineering projects
Strong technical knowledge in relevant engineering disciplines
Proven ability to solve technical challenges and troubleshoot issues
Effective communication and leadership skills
Ability to work collaboratively with cross-functional teams
Track record of delivering projects ...
based on 1 interview
Interview experience
based on 6 reviews
Rating in categories
Safety Officer
78
salaries
| ₹1.9 L/yr - ₹6 L/yr |
Senior Engineer
76
salaries
| ₹4.2 L/yr - ₹9 L/yr |
Assistant Engineer
48
salaries
| ₹3.5 L/yr - ₹6.5 L/yr |
Junior Engineer
41
salaries
| ₹2.4 L/yr - ₹4.3 L/yr |
Junior Engineer Civil
41
salaries
| ₹2 L/yr - ₹4.2 L/yr |
Sobha
Prestige Group
Godrej Properties
DLF