Rohan Builders Senior Engineer QS Interview Questions and Answers

Updated 20 Nov 2024

Rohan Builders Senior Engineer QS Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. How to prepare measurement sheet?
  • Ans. 

    Measurement sheet is prepared by taking off quantities from drawings and specifications.

    • Review drawings and specifications to identify items to be measured

    • Take accurate measurements using appropriate tools and techniques

    • Record measurements in a systematic manner on the measurement sheet

    • Include relevant details such as dimensions, quantities, and units

    • Double-check measurements for accuracy and completeness

    • Organize the m...

  • Answered by AI
  • Q2. Current project billing process
  • Ans. 

    Our current project billing process involves tracking expenses, labor costs, and materials used to accurately bill clients.

    • We track expenses such as equipment rentals, subcontractor costs, and travel expenses.

    • Labor costs are calculated based on hours worked by each team member and their respective rates.

    • Materials used are documented and their costs are included in the billing.

    • We ensure all expenses are properly allocat...

  • Answered by AI

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Past work experience and some technical work related questions
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(6 Questions)

  • Q1. Use of shunt relay in acb.
  • Ans. 

    A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.

    • Shunt relay is connected in parallel with the main circuit of the ACB.

    • It detects overcurrents and activates to divert the excess current through a shunt path.

    • This helps in protecting the main circuit from damage due to overcurrents.

    • Shunt relays are commonly used in Air Circuit Breakers (ACBs...

  • Answered by AI
  • Q2. What is coc in hvac.
  • Ans. 

    CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.

    • CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.

    • It is often required in HVAC projects to ensure quality and compliance.

    • CoC may include details such as product specifications, testing results, and manufacturer information.

  • Answered by AI
  • Q3. What is Biological oxygen demand and Carbonic oxygen demand in STP Plant.
  • Ans. 

    Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.

    • Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.

    • Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.

    • BOD is a ...

  • Answered by AI
  • Q4. What is voltage monitoring relay.
  • Ans. 

    A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.

    • Monitors voltage levels in electrical systems

    • Triggers alarm or protective action if voltage exceeds or falls below set threshold

    • Used to protect equipment from damage due to voltage fluctuations

  • Answered by AI
  • Q5. Working principle of wtp plant.
  • Ans. 

    WTP plant works on the principle of physical and chemical processes to remove impurities from water.

    • Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.

    • Coagulation involves adding chemicals to water to make impurities clump together.

    • Flocculation helps in forming larger particles called floc for easier removal.

    • Sedimentation allows the floc to sett...

  • Answered by AI
  • Q6. What is your daily and monthly Reports.
  • Ans. 

    I provide daily and monthly reports on project progress, issues, and key metrics to track performance.

    • Daily reports include updates on tasks completed, challenges faced, and plans for the next day.

    • Monthly reports summarize overall progress, budget status, and any potential risks or delays.

    • Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - keep mind relax interview time. And focus your daily work activities .
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Estimation and budget related
Round 2 - Technical 

(1 Question)

  • Q1. Basic process follows while billing and budgeting
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiations
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. LT Side Equipments
Round 3 - HR 

(1 Question)

  • Q1. Introduction & Salary
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Introduction, previous experience
Round 3 - Technical 

(1 Question)

  • Q1. Past experience and rates

Interview Preparation Tips

Interview preparation tips for other job seekers - Pressure will be more, since i worked in engineering team compare to others contracts department will be feeling the pressure more
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. All related your experience
Round 3 - HR 

(1 Question)

  • Q1. Hr type question
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Dressing and personality

Round 2 - Technical 

(1 Question)

  • Q1. Site questions and finishing work

Senior Engineer Interview Questions & Answers

DLF user image MRITUNJAY KUMAR

posted on 15 Mar 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Structure work going on at site
  • Ans. 

    The structure work at the site involves the construction of a new building using steel beams and concrete columns.

    • Steel beams are being used for the framework of the building

    • Concrete columns are being installed to support the structure

    • The construction process includes pouring concrete, welding steel beams, and erecting walls

  • Answered by AI
  • Q2. Survey related questions
  • Q3. Planning related
  • Q4. About Relocation nearby site
  • Q5. Manage site works
  • Ans. 

    Managing site works involves overseeing construction activities, coordinating with contractors, ensuring safety regulations are followed, and meeting project deadlines.

    • Coordinate with contractors and subcontractors to ensure work is completed on time and within budget

    • Monitor progress of construction activities and address any issues that may arise

    • Ensure compliance with safety regulations and quality standards

    • Communicat...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be ready with your portfolio,and manage

I applied via Campus Placement and was interviewed in Jun 2021. There were 5 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Tell me about concrete technology?
  • Ans. 

    Concrete technology is the study of the properties and behavior of concrete, including its composition, production, and application.

    • Concrete is a composite material made up of cement, water, aggregates, and often other additives.

    • It is widely used in construction for its strength, durability, and versatility.

    • Concrete technology involves understanding the chemical reactions and physical properties of concrete.

    • It includes...

  • Answered by AI
  • Q2. Tell me about yourself?
  • Q3. So I was very scared I somehow gave an introduction in English and then they ask me another question
  • Q4. Your favourite subject
  • Ans. 

    My favorite subject is computer science.

    • I enjoy studying algorithms and data structures.

    • I find programming languages fascinating and love exploring their features.

    • I am passionate about software development and enjoy solving complex problems.

    • I am interested in artificial intelligence and machine learning.

    • I enjoy learning about computer networks and cybersecurity.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Then I said a lot I got very positive about what I answer then they ask my family background I said my parents occupation is farmers and I am come from financially poor family and then they got very emotional because my situation was like being emotional they are finally told me that you you are very smart don't give up such preserver as honesty and effort never give up and six days after the interview I got a call from their HR and they ask for family information and immediately my result come on on college email in my class attend interview Six student and me and one girl passed in the interview my parents and I were very happy I got the directly position of senior Executive Engineer in Godrej company

Rohan Builders Interview FAQs

How many rounds are there in Rohan Builders Senior Engineer QS interview?
Rohan Builders interview process usually has 1 rounds. The most common rounds in the Rohan Builders interview process are One-on-one Round.
How to prepare for Rohan Builders Senior Engineer QS interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Rohan Builders. The most common topics and skills that interviewers at Rohan Builders expect are Billing, Bbs, Excel, MSP and QS.
What are the top questions asked in Rohan Builders Senior Engineer QS interview?

Some of the top questions asked at the Rohan Builders Senior Engineer QS interview -

  1. How to prepare measurement she...read more
  2. Current project billing proc...read more

Tell us how to improve this page.

Rohan Builders Senior Engineer QS Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Join Rohan Builders Great Living Engineered

Interview Questions from Similar Companies

Sobha Interview Questions
3.8
 • 135 Interviews
Lodha Group Interview Questions
4.0
 • 129 Interviews
DLF Interview Questions
3.9
 • 76 Interviews
Colliers India Interview Questions
3.9
 • 68 Interviews
Casagrand Interview Questions
3.8
 • 58 Interviews
View all
Rohan Builders Senior Engineer QS Salary
based on 5 salaries
₹5.3 L/yr - ₹7 L/yr
12% less than the average Senior Engineer QS Salary in India
View more details

Rohan Builders Senior Engineer QS Reviews and Ratings

based on 6 reviews

4.7/5

Rating in categories

4.7

Skill development

4.7

Work-life balance

4.5

Salary

4.7

Job security

4.9

Company culture

4.5

Promotions

4.7

Work satisfaction

Explore 6 Reviews and Ratings
Senior Engineer
87 salaries
unlock blur

₹4.1 L/yr - ₹9 L/yr

Safety Officer
82 salaries
unlock blur

₹1.9 L/yr - ₹6 L/yr

Assistant Engineer
48 salaries
unlock blur

₹3.5 L/yr - ₹6.5 L/yr

Junior Engineer
43 salaries
unlock blur

₹2.4 L/yr - ₹4.3 L/yr

Junior Engineer Civil
41 salaries
unlock blur

₹2 L/yr - ₹4.2 L/yr

Explore more salaries
Compare Rohan Builders with

Sobha

3.8
Compare

Lodha Group

4.0
Compare

Cushman & Wakefield

4.1
Compare

Godrej Properties

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview