Cushman & Wakefield Senior Engineer Interview Questions and Answers

Updated 11 Apr 2023

Cushman & Wakefield Senior Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. LT Side Equipments
Round 3 - HR 

(1 Question)

  • Q1. Introduction & Salary

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is tiling process
  • Q2. As per work poliy and methods telling all the process
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. NBC standard and basic knowledge of plumbing standard.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. One meter how much inch
  • Ans. 

    One meter is equal to 39.37 inches.

    • One meter is equivalent to 100 centimeters.

    • One inch is equal to 2.54 centimeters.

    • To convert meters to inches, multiply by 39.37 (100 * 2.54).

  • Answered by AI
  • Q2. Steel density value and units
  • Ans. 

    Steel density is typically around 7.85 g/cm^3.

    • Steel density is commonly expressed in grams per cubic centimeter (g/cm^3).

    • The density of steel can vary depending on the specific alloy composition.

    • For example, the density of stainless steel is around 7.9 g/cm^3, while carbon steel is around 7.85 g/cm^3.

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. Explain your privious jobs about your response
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Oct 2023. There were 4 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Previous roles and responsibilities, reason for leaving the previous job
  • Q2. What are the activities, you have handled
Round 2 - Technical 

(3 Questions)

  • Q1. Discussing the overall experience technically
  • Q2. Various activities, about steel, manpower management, procurement
  • Q3. Cranes, concrete pumps, RMC, vendor management, followup with different consultant and dept, coordination and correspondence.
Round 3 - Technical 

(2 Questions)

  • Q1. This was also technical round, Challanges faced on last project
  • Q2. Project details of all executed projects
Round 4 - HR 

(1 Question)

  • Q1. Why do you want to change, expectations and the type of project you have done so far, & final negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared about you previous experience, the roles and responsibilities. And technically sound.
Be confident
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(6 Questions)

  • Q1. Use of shunt relay in acb.
  • Ans. 

    A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.

    • Shunt relay is connected in parallel with the main circuit of the ACB.

    • It detects overcurrents and activates to divert the excess current through a shunt path.

    • This helps in protecting the main circuit from damage due to overcurrents.

    • Shunt relays are commonly used in Air Circuit Breakers (ACBs...

  • Answered by AI
  • Q2. What is coc in hvac.
  • Ans. 

    CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.

    • CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.

    • It is often required in HVAC projects to ensure quality and compliance.

    • CoC may include details such as product specifications, testing results, and manufacturer information.

  • Answered by AI
  • Q3. What is Biological oxygen demand and Carbonic oxygen demand in STP Plant.
  • Ans. 

    Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.

    • Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.

    • Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.

    • BOD is a ...

  • Answered by AI
  • Q4. What is voltage monitoring relay.
  • Ans. 

    A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.

    • Monitors voltage levels in electrical systems

    • Triggers alarm or protective action if voltage exceeds or falls below set threshold

    • Used to protect equipment from damage due to voltage fluctuations

  • Answered by AI
  • Q5. Working principle of wtp plant.
  • Ans. 

    WTP plant works on the principle of physical and chemical processes to remove impurities from water.

    • Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.

    • Coagulation involves adding chemicals to water to make impurities clump together.

    • Flocculation helps in forming larger particles called floc for easier removal.

    • Sedimentation allows the floc to sett...

  • Answered by AI
  • Q6. What is your daily and monthly Reports.
  • Ans. 

    I provide daily and monthly reports on project progress, issues, and key metrics to track performance.

    • Daily reports include updates on tasks completed, challenges faced, and plans for the next day.

    • Monthly reports summarize overall progress, budget status, and any potential risks or delays.

    • Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - keep mind relax interview time. And focus your daily work activities .
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Estimation and budget related
Round 2 - Technical 

(1 Question)

  • Q1. Basic process follows while billing and budgeting
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiations
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Introduction, previous experience
Round 3 - Technical 

(1 Question)

  • Q1. Past experience and rates

Interview Preparation Tips

Interview preparation tips for other job seekers - Pressure will be more, since i worked in engineering team compare to others contracts department will be feeling the pressure more
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Dressing and personality

Round 2 - Technical 

(1 Question)

  • Q1. Site questions and finishing work

I applied via campus placement at Mumbai University and was interviewed in Jun 2021. There were 5 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Tell me about concrete technology?
  • Ans. 

    Concrete technology is the study of the properties and behavior of concrete, including its composition, production, and application.

    • Concrete is a composite material made up of cement, water, aggregates, and often other additives.

    • It is widely used in construction for its strength, durability, and versatility.

    • Concrete technology involves understanding the chemical reactions and physical properties of concrete.

    • It includes...

  • Answered by AI
  • Q2. Tell me about yourself?
  • Q3. So I was very scared I somehow gave an introduction in English and then they ask me another question
  • Q4. Your favourite subject
  • Ans. 

    My favorite subject is computer science.

    • I enjoy studying algorithms and data structures.

    • I find programming languages fascinating and love exploring their features.

    • I am passionate about software development and enjoy solving complex problems.

    • I am interested in artificial intelligence and machine learning.

    • I enjoy learning about computer networks and cybersecurity.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Then I said a lot I got very positive about what I answer then they ask my family background I said my parents occupation is farmers and I am come from financially poor family and then they got very emotional because my situation was like being emotional they are finally told me that you you are very smart don't give up such preserver as honesty and effort never give up and six days after the interview I got a call from their HR and they ask for family information and immediately my result come on on college email in my class attend interview Six student and me and one girl passed in the interview my parents and I were very happy I got the directly position of senior Executive Engineer in Godrej company

Cushman & Wakefield Interview FAQs

How many rounds are there in Cushman & Wakefield Senior Engineer interview?
Cushman & Wakefield interview process usually has 3 rounds. The most common rounds in the Cushman & Wakefield interview process are Resume Shortlist, Technical and HR.
How to prepare for Cushman & Wakefield Senior Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Cushman & Wakefield. The most common topics and skills that interviewers at Cushman & Wakefield expect are Agile Coaching, Architecture, CCTV Monitoring, Career Development and Change Management.

Tell us how to improve this page.

Cushman & Wakefield Senior Engineer Interview Process

based on 3 interviews

Interview experience

4.7
  
Excellent
View more
Cushman & Wakefield Senior Engineer Salary
based on 44 salaries
₹3.5 L/yr - ₹8 L/yr
35% less than the average Senior Engineer Salary in India
View more details

Cushman & Wakefield Senior Engineer Reviews and Ratings

based on 9 reviews

4.6/5

Rating in categories

4.6

Skill development

4.5

Work-life balance

4.3

Salary

4.7

Job security

4.7

Company culture

4.2

Promotions

4.6

Work satisfaction

Explore 9 Reviews and Ratings
Assistant Manager
286 salaries
unlock blur

₹3.6 L/yr - ₹14 L/yr

Facility Executive
176 salaries
unlock blur

₹2.7 L/yr - ₹6.2 L/yr

Project Manager
127 salaries
unlock blur

₹8 L/yr - ₹17.2 L/yr

Project Engineer
117 salaries
unlock blur

₹3.3 L/yr - ₹10.8 L/yr

Facility Manager
117 salaries
unlock blur

₹4.2 L/yr - ₹15 L/yr

Explore more salaries
Compare Cushman & Wakefield with

JLL

4.1
Compare

CBRE

4.2
Compare

Knight Frank

4.1
Compare

Colliers India

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview