I applied via Referral and was interviewed in Mar 2024. There were 2 interview rounds.
Project scheduling involves creating a timeline for project tasks, while costing involves estimating the expenses associated with each task.
Project scheduling involves breaking down the project into tasks, determining the sequence of tasks, and assigning timeframes to each task.
Costing involves estimating the resources required for each task, including labor, materials, and equipment costs.
Project scheduling and costin...
I applied via campus placement at National Institute of Construction Management and Research, Pune and was interviewed in Jan 2024. There were 2 interview rounds.
Be confident, knowledge is the key even if you speak better than the rest so keep reading.
Construction joints are not typically provided for staircases.
Construction joints are typically used in concrete structures to allow for expansion and contraction due to temperature changes.
Staircases are usually designed as a single unit and do not require construction joints.
However, if the staircase is very long or has multiple flights, construction joints may be necessary to allow for movement.
In this case, the joi...
Deflection in PT slab can be arrested by increasing the thickness of slab, using high strength concrete, and providing additional reinforcement.
Increase the thickness of the slab to reduce deflection
Use high strength concrete to increase the load carrying capacity of the slab
Provide additional reinforcement such as steel bars or post-tensioning tendons to increase the stiffness of the slab
Ensure proper curing of the co...
Modern waterproofing techniques include liquid applied membranes, preformed membranes, and crystalline waterproofing.
Liquid applied membranes: applied as a liquid and cures to form a seamless, waterproof membrane. Examples include polyurethane and acrylic coatings.
Preformed membranes: sheets of waterproof material that are applied to the surface. Examples include EPDM and PVC membranes.
Crystalline waterproofing: a chem...
Various waterproofing applications are used on terrace roof slabs of commercial and residential buildings.
Liquid waterproofing membranes
Bituminous waterproofing membranes
Polyurethane waterproofing membranes
Cementitious waterproofing coatings
Sheet waterproofing membranes
Examples: Dr. Fixit Newcoat, Fosroc Proofex, SikaTop Seal 107
The floor to floor height of commercial buildings varies depending on the building's purpose and design.
The floor to floor height of a typical office building is around 3.9 meters.
Warehouses and industrial buildings have higher floor to floor heights, usually around 4.5 to 6 meters.
Residential buildings have lower floor to floor heights, usually around 2.7 to 3 meters.
The floor to floor height can also be affected by t...
I applied via LinkedIn and was interviewed in Nov 2022. There were 3 interview rounds.
Cushman & Wakefield interview questions for designations
I have experience in both the field and corporate office settings.
I have worked on various projects in the field, coordinating tasks and ensuring smooth operations.
I have also spent time in the corporate office, managing project documentation, scheduling meetings, and communicating with stakeholders.
In the field, I have supervised teams, conducted site visits, and resolved any issues that arose.
In the corporate office,...
Seeking new challenges and growth opportunities
Desire for professional development
Limited growth potential in current role
Looking for a more challenging and fulfilling position
Seeking a company with a better cultural fit
Relocation or personal reasons
Get interview-ready with Top Cushman & Wakefield Interview Questions
I applied via Referral and was interviewed before Oct 2021. There were 2 interview rounds.
Top trending discussions
I applied via Approached by Company and was interviewed in Aug 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Aug 2023. There were 2 interview rounds.
based on 14 reviews
Rating in categories
Assistant Manager
285
salaries
| ₹3.6 L/yr - ₹12.1 L/yr |
Facility Executive
173
salaries
| ₹2.3 L/yr - ₹6.2 L/yr |
Project Manager
127
salaries
| ₹8 L/yr - ₹20 L/yr |
Facility Manager
120
salaries
| ₹4 L/yr - ₹16 L/yr |
Shift Engineer
115
salaries
| ₹2.6 L/yr - ₹5.5 L/yr |
JLL
CBRE
Knight Frank
Colliers India