Q1. What kind of water proofing application are used on terrace roof slab of the commercial, residential buildings
Various waterproofing applications are used on terrace roof slabs of commercial and residential buildings.
Liquid waterproofing membranes
Bituminous waterproofing membranes
Polyurethane waterproofing membranes
Cementitious waterproofing coatings
Sheet waterproofing membranes
Examples: Dr. Fixit Newcoat, Fosroc Proofex, SikaTop Seal 107
Q2. What is the of floor to floor height of the Commercial building s
The floor to floor height of commercial buildings varies depending on the building's purpose and design.
The floor to floor height of a typical office building is around 3.9 meters.
Warehouses and industrial buildings have higher floor to floor heights, usually around 4.5 to 6 meters.
Residential buildings have lower floor to floor heights, usually around 2.7 to 3 meters.
The floor to floor height can also be affected by the type of construction materials used and the building's ...read more
Q3. Where construction joints provides for the staircase
Construction joints are not typically provided for staircases.
Construction joints are typically used in concrete structures to allow for expansion and contraction due to temperature changes.
Staircases are usually designed as a single unit and do not require construction joints.
However, if the staircase is very long or has multiple flights, construction joints may be necessary to allow for movement.
In this case, the joints would be located at the landings between flights of st...read more
Q4. What are all the modern water proofing techniques?
Modern waterproofing techniques include liquid applied membranes, preformed membranes, and crystalline waterproofing.
Liquid applied membranes: applied as a liquid and cures to form a seamless, waterproof membrane. Examples include polyurethane and acrylic coatings.
Preformed membranes: sheets of waterproof material that are applied to the surface. Examples include EPDM and PVC membranes.
Crystalline waterproofing: a chemical treatment that reacts with water to form crystals tha...read more
Q5. How can you arrest deflection in PT slab
Deflection in PT slab can be arrested by increasing the thickness of slab, using high strength concrete, and providing additional reinforcement.
Increase the thickness of the slab to reduce deflection
Use high strength concrete to increase the load carrying capacity of the slab
Provide additional reinforcement such as steel bars or post-tensioning tendons to increase the stiffness of the slab
Ensure proper curing of the concrete to prevent cracking and reduce deflection
Use proper...read more
Q6. Explain project scheduling and costing
Project scheduling involves creating a timeline for project tasks, while costing involves estimating the expenses associated with each task.
Project scheduling involves breaking down the project into tasks, determining the sequence of tasks, and assigning timeframes to each task.
Costing involves estimating the resources required for each task, including labor, materials, and equipment costs.
Project scheduling and costing help in ensuring that the project is completed on time a...read more