Add office photos
Cushman & Wakefield logo
Employer?
Claim Account for FREE

Cushman & Wakefield

4.2
based on 1.2k Reviews
Video summary
Filter interviews by
Project Coordinator
Experienced
Clear (1)

Cushman & Wakefield Project Coordinator Interview Questions and Answers

Updated 26 Apr 2024

Q1. What kind of water proofing application are used on terrace roof slab of the commercial, residential buildings

Ans.

Various waterproofing applications are used on terrace roof slabs of commercial and residential buildings.

  • Liquid waterproofing membranes

  • Bituminous waterproofing membranes

  • Polyurethane waterproofing membranes

  • Cementitious waterproofing coatings

  • Sheet waterproofing membranes

  • Examples: Dr. Fixit Newcoat, Fosroc Proofex, SikaTop Seal 107

View 5 more answers
right arrow

Q2. What is the of floor to floor height of the Commercial building s

Ans.

The floor to floor height of commercial buildings varies depending on the building's purpose and design.

  • The floor to floor height of a typical office building is around 3.9 meters.

  • Warehouses and industrial buildings have higher floor to floor heights, usually around 4.5 to 6 meters.

  • Residential buildings have lower floor to floor heights, usually around 2.7 to 3 meters.

  • The floor to floor height can also be affected by the type of construction materials used and the building's ...read more

View 3 more answers
right arrow

Q3. Where construction joints provides for the staircase

Ans.

Construction joints are not typically provided for staircases.

  • Construction joints are typically used in concrete structures to allow for expansion and contraction due to temperature changes.

  • Staircases are usually designed as a single unit and do not require construction joints.

  • However, if the staircase is very long or has multiple flights, construction joints may be necessary to allow for movement.

  • In this case, the joints would be located at the landings between flights of st...read more

View 2 more answers
right arrow

Q4. What are all the modern water proofing techniques?

Ans.

Modern waterproofing techniques include liquid applied membranes, preformed membranes, and crystalline waterproofing.

  • Liquid applied membranes: applied as a liquid and cures to form a seamless, waterproof membrane. Examples include polyurethane and acrylic coatings.

  • Preformed membranes: sheets of waterproof material that are applied to the surface. Examples include EPDM and PVC membranes.

  • Crystalline waterproofing: a chemical treatment that reacts with water to form crystals tha...read more

View 2 more answers
right arrow
Discover Cushman & Wakefield interview dos and don'ts from real experiences

Q5. How can you arrest deflection in PT slab

Ans.

Deflection in PT slab can be arrested by increasing the thickness of slab, using high strength concrete, and providing additional reinforcement.

  • Increase the thickness of the slab to reduce deflection

  • Use high strength concrete to increase the load carrying capacity of the slab

  • Provide additional reinforcement such as steel bars or post-tensioning tendons to increase the stiffness of the slab

  • Ensure proper curing of the concrete to prevent cracking and reduce deflection

  • Use proper...read more

Add your answer
right arrow

Q6. Explain project scheduling and costing

Ans.

Project scheduling involves creating a timeline for project tasks, while costing involves estimating the expenses associated with each task.

  • Project scheduling involves breaking down the project into tasks, determining the sequence of tasks, and assigning timeframes to each task.

  • Costing involves estimating the resources required for each task, including labor, materials, and equipment costs.

  • Project scheduling and costing help in ensuring that the project is completed on time a...read more

Add your answer
right arrow
Contribute & help others!
Write a review
Write a review
Share interview
Share interview
Contribute salary
Contribute salary
Add office photos
Add office photos

Interview Process at Cushman & Wakefield Project Coordinator

based on 7 interviews
1 Interview rounds
Resume Shortlist Round
View more
interview tips and stories logo
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories
Recently Viewed
COMPANY BENEFITS
Dilip Buildcon
304 benefits
COMPANY BENEFITS
Dilip Buildcon
304 benefits
COMPANY BENEFITS
IRB Infrastructure
60 benefits
COMPANY BENEFITS
KNR Constructions
20 benefits
JOBS
Browse jobs
Discover jobs you love
COMPANY BENEFITS
Hari Shankar Singhania Elastomer And Tyre Research Institute
No Benefits
REVIEWS
Hari Shankar Singhania Elastomer And Tyre Research Institute
No Reviews
INTERVIEWS
DAR Engineering
No Interviews
INTERVIEWS
Cornerstone OnDemand
No Interviews
INTERVIEWS
Mindfire Solutions
No Interviews
Share an Interview
Stay ahead in your career. Get AmbitionBox app
play-icon
play-icon
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
75 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter