Control measures to reduce RCC concrete framed structure
Proper design and detailing of reinforcement to ensure structural integrity
Regular inspection and maintenance to identify and address any issues early
Use of high-quality materials to prevent deterioration over time
Implementing proper waterproofing measures to protect against water damage
Ensuring proper curing of concrete to achieve desired strength and durability
To study structural drawing and apply on work site, one must understand the symbols, dimensions, and materials used in the drawings.
Study the key symbols and abbreviations used in structural drawings.
Understand the dimensions and scale of the drawings to accurately interpret measurements.
Familiarize yourself with the materials specified in the drawings and their properties.
Practice interpreting structural drawings by w...
Waterproof sequence is the order in which different waterproofing materials are applied to a surface to ensure maximum protection.
Waterproof sequence typically involves applying a primer, followed by a waterproof membrane, and then a protective coating.
Examples of waterproofing materials used in sequence include primer, liquid membrane, sheet membrane, and sealants.
The type of waterproof sequence may vary depending on ...
Reading structural drawings involves understanding symbols, dimensions, and materials used in the design.
Understand the scale of the drawing to ensure accurate measurements.
Identify symbols and abbreviations used in the drawing key.
Review the structural elements such as beams, columns, and foundations.
Compare the structural drawing with working drawings to ensure consistency in design and construction.
Pay attention to ...
I applied via Walk-in and was interviewed in Aug 2024. There were 2 interview rounds.
General knowledge question
I applied via Company Website and was interviewed before Jan 2023. There was 1 interview round.
Chiller efficiency is a measure of how well a chiller unit is able to cool a space while using the least amount of energy.
Chiller efficiency is typically measured by the Coefficient of Performance (COP), which is the ratio of cooling output to energy input.
Regular maintenance and cleaning of chiller components can improve efficiency.
Upgrading to a more energy-efficient chiller model can also increase efficiency.
Proper ...
Water cooled systems are generally more efficient than air cooled systems due to higher heat transfer capabilities.
Water has higher heat transfer capabilities compared to air
Water cooled systems can maintain more consistent temperatures
Water cooled systems are typically used in high performance applications such as data centers and industrial machinery
Duct velocity can be improved by increasing the fan speed or reducing the duct size.
Increase the fan speed to increase the air velocity in the duct.
Reduce the duct size to increase the air velocity.
Use dampers or adjustable louvers to control and optimize the airflow.
Ensure proper sealing of duct joints to minimize air leakage.
Consider using smooth and straight ducts to reduce friction and improve airflow.
Regularly cle...
The chiller system uses various types of gases for cooling purposes.
Common types of gases used in chiller systems include R-134a, R-410A, and ammonia.
R-134a is a hydrofluorocarbon (HFC) refrigerant commonly used in air conditioning systems.
R-410A is a blend of hydrofluorocarbons used as a replacement for older refrigerants.
Ammonia (NH3) is often used in industrial chiller systems due to its high cooling capacity.
Other ...
The VRF system capacity is determined based on the area's cooling and heating load requirements.
Calculate the total cooling load and heating load for the area
Consider factors such as insulation, windows, occupancy, and equipment
Select VRF system capacity based on the calculated load requirements
Consult with HVAC professionals for accurate sizing
I completed various projects during my Bachelor's degree, including a design project for a new bridge and a research project on renewable energy.
Designed a new bridge using CAD software
Researched and implemented renewable energy sources on campus
Collaborated with classmates on a group project to improve campus sustainability
I completed my 6 months internship at ABC Engineering Firm, where I gained hands-on experience in project management and design.
Internship at ABC Engineering Firm
Focused on project management and design
Hands-on experience gained
I applied via Naukri.com and was interviewed in Jan 2022. There were 2 interview rounds.
based on 3 interviews
Interview experience
based on 20 reviews
Rating in categories
Assistant Manager
315
salaries
| ₹0 L/yr - ₹0 L/yr |
Facility Executive
175
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Manager
128
salaries
| ₹0 L/yr - ₹0 L/yr |
Shift Engineer
122
salaries
| ₹0 L/yr - ₹0 L/yr |
Facility Manager
120
salaries
| ₹0 L/yr - ₹0 L/yr |
JLL
CBRE
Knight Frank
Colliers India