Flexible pavements and rigid pavements are two types of roads.
Flexible pavements have an embankment thickness of 3m and large size soil particles.
Rigid pavements are made of concrete or asphalt and have a rigid structure.
Flexible pavements are more suitable for areas with high traffic loads and varying soil conditions.
Rigid pavements are more durable and require less maintenance compared to flexible pavements.
Examples ...
Discussion on DLC mix using M15 grade concrete and 12:1 aggregate cement ratio.
Minimum cement content is 120 kg per cum if flyash is more than 20%.
5 samples of cube tested for 7 days with 10MPa compressive strength.
DLC mix is homogeneous and uniform in pre mix batching plant.
DLC is carried from one place to another place covered by tarpoline.
One sample after 7 days showed 7.5 Mpa compressive strength.
The question is unclear and lacks context.
The question needs to be rephrased for clarity.
More information is needed to provide a proper answer.
It is unclear what the purpose of the DLC surfaces is.
The sub base surface compaction percentages are not relevant to the question.
The question may be related to civil engineering or construction.
The question pertains to the expected stress and restrained movement on an expansion joint with dowel bar load transfer.
Total thickness of 300mm with M40 grade concrete and 31.5mm aggregate size.
Texture strength of cement concrete is 4.5 Mpa and compressive strength after 28 days curing is 40Mpa.
Expansion joint thickness is 25mm with dowel bar load transfer to one slab to another slab.
Dowel bar is 32mm dia, 500mm lengt...
The question is about the process of laying PQC mix on DLC surface using a pre-mix batching plant and electromagnetic paver sensor machine.
Process of laying PQC mix on DLC surface
Use of pre-mix batching plant and electromagnetic paver sensor machine
Importance of proper compaction and blending
Tolerance and effect on workability
The interviewer is asking about CBR valve and subgrade for road construction.
CBR valve is generally between 3 to 15% for road construction
Clay content should be less than 8%
Sand content should be between 15% to 35%
Gravel content should be greater than 25%
CBR division of state highway develops CBR
Subgrade and aggregate should meet the CBR valve requirements
Top trending discussions
I applied via Naukri.com and was interviewed before Oct 2020. There were 6 interview rounds.
posted on 1 Apr 2021
posted on 1 Apr 2021
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
posted on 11 Sep 2023
I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.
posted on 17 Oct 2024
Basic algorithms and DS
Team management, planning, execution
posted on 5 Dec 2024
I applied via Referral and was interviewed before Dec 2023. There was 1 interview round.
posted on 18 May 2021
Some of the top questions asked at the Sterling Indo Tech Consultants Senior Project Engineer interview -
Office Manager
22
salaries
| ₹1.5 L/yr - ₹4.8 L/yr |
Assistant Highway Engineer
21
salaries
| ₹3 L/yr - ₹5 L/yr |
Computer Operator
8
salaries
| ₹1.5 L/yr - ₹2 L/yr |
Survey Engineer
7
salaries
| ₹2.8 L/yr - ₹5 L/yr |
HR Executive
5
salaries
| ₹2.2 L/yr - ₹3.6 L/yr |
CTS Consulting & Technical Support
Saudi Binladin Group
Amara Raja Infra
Patel Infrastructure