CBRE
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Referral and was interviewed before Aug 2023. There were 2 interview rounds.
Some tools and softwares in the field of project coordination include Microsoft Project, Asana, Trello, and Jira.
Microsoft Project
Asana
Trello
Jira
I am currently earning a competitive salary based on my experience and qualifications.
My current salary is in line with industry standards.
I am open to discussing salary expectations for this new role.
I believe my compensation should reflect my skills and contributions.
I am looking for a fair and competitive salary package.
I am confident in my value and am seeking a salary that reflects that.
I applied via Approached by Company and was interviewed in May 2023. There were 2 interview rounds.
Project billing process involves invoicing clients for services rendered and tracking payments.
Create detailed invoices outlining services provided and costs
Send invoices to clients in a timely manner to ensure prompt payment
Track payments received and follow up on any overdue invoices
Maintain accurate records of billing and payments for financial reporting purposes
I applied via Approached by Company and was interviewed in Aug 2022. There were 2 interview rounds.
CBRE interview questions for designations
I applied via Referral and was interviewed before May 2022. There were 2 interview rounds.
Yes, I am able to do SLD.
SLD stands for Single Line Diagram, which is a graphical representation of an electrical system.
I have experience in creating and interpreting SLDs.
I am familiar with the symbols and conventions used in SLDs.
I can use software tools such as AutoCAD and Visio to create SLDs.
I understand the importance of accuracy and clarity in SLDs for effective communication and troubleshooting.
Yes, I am able to do earthing and cable scheduling.
I have experience in designing and implementing earthing systems for various projects.
I am proficient in creating cable schedules using software such as AutoCAD and Microsoft Excel.
I am familiar with industry standards and regulations related to earthing and cable scheduling.
For example, in my previous role as a Project Coordinator for a construction company, I was res...
I applied via Campus Placement and was interviewed before Nov 2020. There were 5 interview rounds.
posted on 9 Oct 2022
I applied via Referral and was interviewed before Oct 2021. There were 2 interview rounds.
posted on 17 Nov 2022
I have experience in both the field and corporate office settings.
I have worked on various projects in the field, coordinating tasks and ensuring smooth operations.
I have also spent time in the corporate office, managing project documentation, scheduling meetings, and communicating with stakeholders.
In the field, I have supervised teams, conducted site visits, and resolved any issues that arose.
In the corporate office,...
Seeking new challenges and growth opportunities
Desire for professional development
Limited growth potential in current role
Looking for a more challenging and fulfilling position
Seeking a company with a better cultural fit
Relocation or personal reasons
posted on 8 Nov 2022
Construction joints are not typically provided for staircases.
Construction joints are typically used in concrete structures to allow for expansion and contraction due to temperature changes.
Staircases are usually designed as a single unit and do not require construction joints.
However, if the staircase is very long or has multiple flights, construction joints may be necessary to allow for movement.
In this case, the joi...
Deflection in PT slab can be arrested by increasing the thickness of slab, using high strength concrete, and providing additional reinforcement.
Increase the thickness of the slab to reduce deflection
Use high strength concrete to increase the load carrying capacity of the slab
Provide additional reinforcement such as steel bars or post-tensioning tendons to increase the stiffness of the slab
Ensure proper curing of the co...
Modern waterproofing techniques include liquid applied membranes, preformed membranes, and crystalline waterproofing.
Liquid applied membranes: applied as a liquid and cures to form a seamless, waterproof membrane. Examples include polyurethane and acrylic coatings.
Preformed membranes: sheets of waterproof material that are applied to the surface. Examples include EPDM and PVC membranes.
Crystalline waterproofing: a chem...
Various waterproofing applications are used on terrace roof slabs of commercial and residential buildings.
Liquid waterproofing membranes
Bituminous waterproofing membranes
Polyurethane waterproofing membranes
Cementitious waterproofing coatings
Sheet waterproofing membranes
Examples: Dr. Fixit Newcoat, Fosroc Proofex, SikaTop Seal 107
The floor to floor height of commercial buildings varies depending on the building's purpose and design.
The floor to floor height of a typical office building is around 3.9 meters.
Warehouses and industrial buildings have higher floor to floor heights, usually around 4.5 to 6 meters.
Residential buildings have lower floor to floor heights, usually around 2.7 to 3 meters.
The floor to floor height can also be affected by t...
posted on 15 May 2023
I applied via LinkedIn and was interviewed in Nov 2022. There were 3 interview rounds.
based on 4 interviews
2 Interview rounds
based on 58 reviews
Rating in categories
Assistant Manager
1.6k
salaries
| ₹3.5 L/yr - ₹11 L/yr |
Facility Executive
638
salaries
| ₹2 L/yr - ₹6 L/yr |
Facility Manager
514
salaries
| ₹3.7 L/yr - ₹14.4 L/yr |
Assistant Facility Manager
507
salaries
| ₹3 L/yr - ₹11 L/yr |
Deputy Manager
487
salaries
| ₹4.5 L/yr - ₹15 L/yr |
JLL
NoBroker
Cushman & Wakefield
Colliers India