The characteristic compressive strength of concrete is the strength of concrete at 28 days of curing.
It is the strength of concrete after 28 days of curing
It is the strength at which the concrete can bear the maximum load without failure
It is determined by testing a sample of concrete in a compression testing machine
The characteristic compressive strength is used to design concrete structures
For example, if the charact...
Sieve analysis of sand & aggregate is conducted to determine the particle size distribution.
Collect a representative sample of sand or aggregate.
Weigh the sample and record the weight.
Prepare a series of sieves with different mesh sizes.
Stack the sieves in ascending order of mesh size, with the finest sieve at the bottom.
Place the sample on the top sieve and cover it with a lid.
Shake the sieves manually or using a mech...
The exact height of falling of concrete is not specified in IS 456: 2000.
IS 456: 2000 does not provide a specific height for the falling of concrete.
The standard focuses on the design and construction requirements for reinforced concrete structures.
It covers aspects such as materials, mix proportions, workmanship, and quality control.
The height of falling concrete may be specified in project-specific specifications or ...
The slump value of mass concreting refers to the measure of consistency or workability of the concrete mixture.
Slump value is determined by conducting a slump test on freshly mixed concrete.
It indicates the flow and compactability of the concrete.
The slump value is measured in millimeters and can range from 0 to 200 mm.
Higher slump values indicate a more fluid and workable concrete mixture.
Lower slump values indicate a...
Concrete cube test is conducted to measure the compressive strength of concrete.
Prepare the concrete cubes by using a standard mix design.
Fill the cube moulds with freshly mixed concrete in layers.
Compact the concrete using a vibrating table or a vibrating poker.
Smooth the surface of the cubes using a trowel.
Label each cube with relevant information like date, mix design, etc.
Cure the cubes in a curing tank or moist en...
High rise building construction from sub structure to super structure completing with all stage of construction with different activity mention in project.
Top trending discussions
posted on 18 Apr 2024
I applied via Referral and was interviewed before Apr 2023. There was 1 interview round.
I applied via Campus Placement and was interviewed before Nov 2020. There were 5 interview rounds.
HVDC stands for High Voltage Direct Current. It is a system used for transmitting high voltage electricity over long distances.
HVDC systems are used to transmit electricity over long distances with minimal losses.
They are more efficient than traditional AC systems for long-distance transmission.
HVDC systems use converters to convert AC power to DC power and vice versa.
Examples of HVDC systems include the Itaipu HVDC sy...
A rectifier is an electronic device that converts AC to DC.
Rectifiers are commonly used in power supplies to convert AC voltage to DC voltage.
They can be made using diodes or other semiconductor devices.
Rectifiers are essential for many electronic devices to function properly.
Examples of rectifiers include bridge rectifiers, half-wave rectifiers, and full-wave rectifiers.
I applied via Approached by Company and was interviewed before Jul 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Jun 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Nov 2021. There were 4 interview rounds.
I applied via Referral and was interviewed before Apr 2021. There were 3 interview rounds.
Per MW cost with rational refers to the cost of generating one megawatt of electricity with a logical and reasonable approach.
Per MW cost with rational is calculated by taking into account all the expenses incurred in generating one megawatt of electricity.
This includes the cost of fuel, maintenance, labor, and other operational expenses.
The cost can vary depending on the type of power plant, fuel source, and location.
...
I was interviewed in Sep 2020.
Technical round -Experience about all companies, strategy, how to complete the project
Some of the top questions asked at the Desire Energy Solution Project Coordinator interview -
Assistant Manager
59
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Executive
30
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
26
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
14
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Project Manager
11
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Power
Adani Green Energy
Suzlon Group
Azure Power