A Project Coordinator was asked
Q. What is the characteristic compressive strength of concrete?
Ans. 

The characteristic compressive strength of concrete is the strength of concrete at 28 days of curing.

  • It is the strength of concrete after 28 days of curing

  • It is the strength at which the concrete can bear the maximum load without failure

  • It is determined by testing a sample of concrete in a compression testing machine

  • The characteristic compressive strength is used to design concrete structures

  • For example, if the ch...

View all Project Coordinator interview questions
A Project Coordinator was asked
Q. What is the maximum allowed height for concrete pouring as per IS 456:2000?
Ans. 

The exact height of falling of concrete is not specified in IS 456: 2000.

  • IS 456: 2000 does not provide a specific height for the falling of concrete.

  • The standard focuses on the design and construction requirements for reinforced concrete structures.

  • It covers aspects such as materials, mix proportions, workmanship, and quality control.

  • The height of falling concrete may be specified in project-specific specification...

View all Project Coordinator interview questions
A Project Coordinator was asked
Q. How can we conduct the sieve analysis of sand and aggregate?
Ans. 

Sieve analysis of sand & aggregate is conducted to determine the particle size distribution.

  • Collect a representative sample of sand or aggregate.

  • Weigh the sample and record the weight.

  • Prepare a series of sieves with different mesh sizes.

  • Stack the sieves in ascending order of mesh size, with the finest sieve at the bottom.

  • Place the sample on the top sieve and cover it with a lid.

  • Shake the sieves manually or using a...

View all Project Coordinator interview questions
A Project Coordinator was asked
Q. How can we conduct a concrete cube test?
Ans. 

Concrete cube test is conducted to measure the compressive strength of concrete.

  • Prepare the concrete cubes by using a standard mix design.

  • Fill the cube moulds with freshly mixed concrete in layers.

  • Compact the concrete using a vibrating table or a vibrating poker.

  • Smooth the surface of the cubes using a trowel.

  • Label each cube with relevant information like date, mix design, etc.

  • Cure the cubes in a curing tank or moi...

View all Project Coordinator interview questions
A Project Coordinator was asked
Q. What is the slump value of mass concreting?
Ans. 

The slump value of mass concreting refers to the measure of consistency or workability of the concrete mixture.

  • Slump value is determined by conducting a slump test on freshly mixed concrete.

  • It indicates the flow and compactability of the concrete.

  • The slump value is measured in millimeters and can range from 0 to 200 mm.

  • Higher slump values indicate a more fluid and workable concrete mixture.

  • Lower slump values indic...

View all Project Coordinator interview questions
A Block Manager was asked 11mo ago
Q. Preparation of BOQ and BBS
Ans. 

Preparation of BOQ and BBS involves detailed quantity take-offs and scheduling of materials and labor.

  • BOQ (Bill of Quantities) is a detailed list of items, quantities, and rates required for a construction project.

  • BBS (Bar Bending Schedule) is a detailed reinforcement calculation for concrete structures.

  • Preparation of BOQ involves quantity take-offs from drawings and specifications.

  • BBS includes detailed calculatio...

View all Block Manager interview questions

Desire Energy Solution Interview Experiences

16 interviews found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. General Administration questions
  • Q2. Same as admin responsibility
  • Q3. Asking for roles and responsibilities
  • Q4. How do you handle critical situation
  • Ans. 

    I remain calm, assess the situation, prioritize tasks, communicate effectively, and take decisive action.

    • Remain calm and composed

    • Assess the situation thoroughly

    • Prioritize tasks based on urgency

    • Communicate effectively with team members and stakeholders

    • Take decisive action to resolve the issue

  • Answered by AI
  • Q5. How do you handle grievance
  • Ans. 

    I handle grievances by listening to the concerns of the individual, investigating the issue thoroughly, and working towards a fair resolution.

    • Listen actively to the grievance and show empathy towards the individual's concerns

    • Investigate the issue by gathering all relevant information and speaking to all parties involved

    • Work towards a fair resolution by discussing possible solutions with the individual and implementing ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - My interview was taken by MD sir, he asked roles and responsibilities and if there is ever a fight, how do you cope and how do you work in critical situation.
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. How you handle the project based on safety because you will be our newly department which is recently created by the management?
  • Ans. 

    I prioritize safety in all aspects of project management by implementing safety protocols, conducting regular safety inspections, and providing safety training to all team members.

    • Implement safety protocols and procedures to ensure a safe work environment

    • Conduct regular safety inspections to identify and address potential hazards

    • Provide safety training to all team members to increase awareness and promote safe practice...

  • Answered by AI
  • Q2. What kind of safety procedures you know about? How do you deal at our all PAN India project site from head office?
  • Ans. 

    I am familiar with various safety procedures such as hazard identification, risk assessment, emergency response planning, and safety training.

    • Conducting regular safety audits and inspections

    • Implementing safety protocols and guidelines

    • Providing safety training to employees

    • Developing emergency response plans

    • Ensuring compliance with safety regulations

    • Promoting a safety culture among all employees

  • Answered by AI
  • Q3. What is your qualification main and technical and what about your experience in this field? How do you manage accident if happens at sites?
  • Ans. 

    I have a degree in Operations Management and extensive experience in managing operations. I have implemented safety protocols to prevent accidents and have a plan in place to handle accidents if they occur.

    • Degree in Operations Management

    • Extensive experience in managing operations

    • Implemented safety protocols to prevent accidents

    • Have a plan in place to handle accidents if they occur

  • Answered by AI
  • Q4. What is your expectations?
  • Ans. 

    My expectations include clear communication, strong leadership, efficient operations, and continuous improvement.

    • Clear communication with team members and stakeholders

    • Strong leadership to motivate and guide the team

    • Efficient operations to meet goals and deadlines

    • Continuous improvement in processes and performance

    • Example: Expectation for regular team meetings to discuss progress and challenges

  • Answered by AI
  • Q5. No any questions

Interview Preparation Tips

Topics to prepare for Desire Energy Solution Operations Manager interview:
  • Safety Management
Interview preparation tips for other job seekers - Do not join the company in Health and Safety. Here is no working culture for this field. Other than health and safety, Management only focus on the PPE, and you will not make any budget for project site. Few directors doesn't deserve their position because of their jolly nature and often you can see they are how entertaining with their juniors even bad jokes i.e. discussion about liquor and harsh things.
you can join other departments. Here is hire and fire policy. Human resources team do not care the employees other than celebrating of unidentified occasions, conduct waste training through online/ offline mode.
Salary is very minimal because of new startup company, you can see a project manager level salary is only 60k. They cannot provide you handsome salary, even salary is not at time now. They pull the salary time from 2nd to 7th of day of every month.
There is no reputation other than rajasthani person in this company. Hire and fire culture only with other states person.

Block Manager Interview Questions & Answers

user image N K Gupta

posted on 23 Jul 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jun 2024. There were 2 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. Land Surveying and Levelling
  • Q2. Preparation of BOQ and BBS
  • Ans. 

    Preparation of BOQ and BBS involves detailed quantity take-offs and scheduling of materials and labor.

    • BOQ (Bill of Quantities) is a detailed list of items, quantities, and rates required for a construction project.

    • BBS (Bar Bending Schedule) is a detailed reinforcement calculation for concrete structures.

    • Preparation of BOQ involves quantity take-offs from drawings and specifications.

    • BBS includes detailed calculations of...

  • Answered by AI
  • Q3. Cost Control related questions
Round 2 - HR 

(1 Question)

  • Q1. Salary Negotiation

Interview Preparation Tips

Topics to prepare for Desire Energy Solution Block Manager interview:
  • RCC
  • Quantity Estimation
Interview preparation tips for other job seekers - Need to prepare the required/demanding skills for company work.

Interview Questions & Answers

user image Akshhat Aaryan

posted on 26 Aug 2024

Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Harrasment 

(2 Questions)

  • Q1. What was your previous work
  • Ans. 

    I have worked as a Health and Safety Manager for the past 5 years in a manufacturing company.

    • Managed health and safety programs to ensure compliance with regulations

    • Conducted regular safety inspections and audits

    • Developed and implemented safety training programs for employees

    • Investigated accidents and incidents to determine root causes and prevent future occurrences

  • Answered by AI
  • Q2. Why you leave your past organisation?
  • Ans. 

    Seeking new challenges and opportunities for growth.

    • Opportunity for career advancement

    • Desire for new challenges

    • Seeking a more supportive work environment

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Use AI

Interview Questions & Answers

user image Nitesh Kumar Gupta

posted on 22 Aug 2023

Interview experience
3
Average
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jul 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. About Qualification and Work ex.
Round 3 - Technical 

(3 Questions)

  • Q1. Question from BM and CT.
  • Q2. Concrete production
  • Q3. IS 456 related questions
Round 4 - Final Round 

(1 Question)

  • Q1. Project related questions.

Interview Preparation Tips

Interview preparation tips for other job seekers - Questions are relate to your work ex.

Deputy Project Manager Interview Questions & Answers

user image Nitesh Kumar Gupta

posted on 15 Jun 2025

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Jun 2024, where I was asked the following questions.

  • Q1. What is the typical construction period for an overhead tank?
  • Ans. 

    The construction period for an overhead tank typically ranges from 3 to 6 months, depending on various factors.

    • Site preparation and foundation work usually take 2-4 weeks.

    • The tank structure can take 1-3 months to complete, depending on size.

    • Installation of piping and fittings may require an additional 2-4 weeks.

    • Weather conditions can impact the timeline significantly, causing delays.

    • For example, a small tank may be com...

  • Answered by AI
  • Q2. What are the details of mix design for water-retaining structures and what precautions should be taken during construction?
  • Ans. 

    Mix design for water-retaining structures ensures durability and impermeability, requiring specific materials and construction practices.

    • Use of low permeability concrete to prevent water leakage, typically with a water-cement ratio of 0.4 or lower.

    • Incorporation of additives like silica fume or fly ash to enhance strength and reduce porosity.

    • Proper curing methods to maintain moisture and temperature, ensuring optimal hy...

  • Answered by AI
  • Q3. What are the different types of pipes used in water supply projects?
  • Ans. 

    Various pipes are used in water supply projects, each with unique properties and applications for efficient water distribution.

    • PVC (Polyvinyl Chloride) pipes: Lightweight, corrosion-resistant, commonly used for residential water supply.

    • HDPE (High-Density Polyethylene) pipes: Flexible, durable, suitable for underground installations and high-pressure applications.

    • Ductile Iron pipes: Strong and resilient, often used for ...

  • Answered by AI
  • Q4. What are the best practices for labor control and deployment?
  • Ans. 

    Effective labor control and deployment optimize resources, enhance productivity, and ensure project success through strategic planning.

    • 1. Detailed Planning: Create a comprehensive labor plan that outlines roles, responsibilities, and timelines. For example, using Gantt charts to visualize tasks.

    • 2. Resource Allocation: Assign the right number of workers to tasks based on skill sets and project needs. For instance, deplo...

  • Answered by AI
  • Q5. What is the reason of honeycomb and what is the procedure for its repair?
  • Ans. 

    Honeycomb refers to voids in concrete, often due to improper placement or curing, requiring specific repair methods.

    • Honeycomb occurs when air pockets are trapped in concrete during pouring.

    • Common causes include inadequate vibration, poor mix design, or premature curing.

    • Repair involves cleaning the area, applying a bonding agent, and filling with a suitable repair mortar.

    • For example, using epoxy-based repair compounds c...

  • Answered by AI
  • Q6. What is the construction cost of a typical overhead tank?
  • Ans. 

    The construction cost of a typical overhead tank varies based on size, materials, and location.

    • Cost typically ranges from $50 to $200 per cubic meter.

    • A 100,000-liter tank may cost between $50,000 to $200,000.

    • Factors influencing cost include site preparation, materials (concrete vs. steel), and labor.

    • Additional costs may arise from permits, inspections, and utility connections.

  • Answered by AI
  • Q7. What challenges did you face during the commissioning of the project?
  • Ans. 

    Faced multiple challenges during project commissioning, including resource allocation, stakeholder communication, and technical issues.

    • Resource Allocation: We struggled with limited manpower, which delayed critical tasks. For example, we had to prioritize tasks based on urgency.

    • Stakeholder Communication: Misalignment with stakeholders led to conflicting expectations. Regular meetings helped clarify goals and timelines.

    • ...

  • Answered by AI
  • Q8. How does the water-cement ratio affect the strength of concrete?
  • Ans. 

    The water-cement ratio is crucial for determining concrete's strength and durability, influencing its overall performance.

    • Lower water-cement ratio (e.g., 0.4) leads to higher strength and durability.

    • Higher water-cement ratio (e.g., 0.6) results in weaker concrete, increasing porosity.

    • Optimal ratio for most structural concrete is around 0.5.

    • Excess water can cause segregation and reduce bond strength between aggregates.

    • C...

  • Answered by AI
  • Q9. What are the safety regulations and precautions that should be followed at a construction site?
  • Ans. 

    Safety regulations at construction sites ensure worker protection and compliance with legal standards to prevent accidents and injuries.

    • Use personal protective equipment (PPE) such as helmets, gloves, and safety goggles to protect workers from hazards.

    • Implement fall protection measures, like guardrails and safety nets, especially when working at heights.

    • Conduct regular safety training sessions to educate workers about ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - After gaining experience, interviewers typically focus on questions related to your past work details, so it is important to prepare accordingly.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jun 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. About current employer and current ctc
Round 3 - Technical 

(2 Questions)

  • Q1. Tell me your one appreciated task
  • Q2. Dewatering excalation

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good discussion on technical points

Interview Questions & Answers

user image Anonymous

posted on 22 Jun 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. What is the size of raft?
  • Q2. Which grade concrete use in ohsr?
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Feb 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Tell me something about yourself
Round 3 - One-on-one 

(2 Questions)

  • Q1. Sr. Accountant asked me to work till 11-12 p.m. night
  • Ans. Work Life Balance is crucial factor
  • Answered Anonymously
  • Q2. Interviewer Mr. Deepak told to not talk about Work Life Balance and that he will throw me out if I ever go home on time.

Interview Preparation Tips

Interview preparation tips for other job seekers - I don't advice you to join the Company due to the inappropriate behaviour of the current senior accountant.
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Feb 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. Can you handle technical work
  • Ans. 

    Yes, I have experience handling technical work in previous projects.

    • I have a strong background in technical project management.

    • I have successfully managed technical teams and projects in the past.

    • I am comfortable working with technical tools and software.

    • I have a track record of delivering technical projects on time and within budget.

  • Answered by AI
  • Q2. Yes i am handle technical work

Interview Preparation Tips

Interview preparation tips for other job seekers - Effective communication and the development of optimal skills.

Top trending discussions

View All
Interview Tips & Stories
6d (edited)
a team lead
Why are women still asked such personal questions in interview?
I recently went for an interview… and honestly, m still trying to process what just happened. Instead of being asked about my skills, experience, or how I could add value to the company… the questions took a totally unexpected turn. The interviewer started asking things like When are you getting married? Are you engaged? And m sure, if I had said I was married, the next question would’ve been How long have you been married? What does my personal life have to do with the job m applying for? This is where I felt the gender discrimination hit hard. These types of questions are so casually thrown at women during interviews but are they ever asked to men? No one asks male candidates if they’re planning a wedding or how old their kids are. So why is it okay to ask women? Can we please stop normalising this kind of behaviour in interviews? Our careers shouldn’t be judged by our relationship status. Period.
Got a question about Desire Energy Solution?
Ask anonymously on communities.

Desire Energy Solution Interview FAQs

How many rounds are there in Desire Energy Solution interview?
Desire Energy Solution interview process usually has 2-3 rounds. The most common rounds in the Desire Energy Solution interview process are HR, Technical and Resume Shortlist.
How to prepare for Desire Energy Solution interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Desire Energy Solution. The most common topics and skills that interviewers at Desire Energy Solution expect are Project Management, Site Engineering, Civil Engineering, Commissioning and Maintenance.
What are the top questions asked in Desire Energy Solution interview?

Some of the top questions asked at the Desire Energy Solution interview -

  1. What is the characteristic compressive strength of concre...read more
  2. How can we conduct the sieve analysis of sand & Agreega...read more
  3. What is the exact height of falling of concrete as per is IS 456: 2...read more
What are the most common questions asked in Desire Energy Solution HR round?

The most common HR questions asked in Desire Energy Solution interview are -

  1. Where do you see yourself in 5 yea...read more
  2. Why are you looking for a chan...read more
  3. What are your strengths and weakness...read more
How long is the Desire Energy Solution interview process?

The duration of Desire Energy Solution interview process can vary, but typically it takes about 2-4 weeks to complete.

Tell us how to improve this page.

Overall Interview Experience Rating

4/5

based on 13 interview experiences

Difficulty level

Easy 63%
Moderate 25%
Hard 13%

Duration

Less than 2 weeks 63%
2-4 weeks 38%
View more

Interview Questions from Similar Companies

Leap Finance Interview Questions
3.6
 • 60 Interviews
OSB India Interview Questions
3.6
 • 32 Interviews
Go-Jek Interview Questions
3.7
 • 31 Interviews
BOBCARD Ltd. Interview Questions
4.3
 • 26 Interviews
View all

Desire Energy Solution Reviews and Ratings

based on 130 reviews

3.9/5

Rating in categories

3.5

Skill development

3.8

Work-life balance

3.5

Salary

3.6

Job security

3.6

Company culture

3.3

Promotions

3.6

Work satisfaction

Explore 130 Reviews and Ratings
Assistant Manager
68 salaries
unlock blur

₹2.8 L/yr - ₹6 L/yr

Senior Executive
33 salaries
unlock blur

₹2 L/yr - ₹5 L/yr

Deputy Manager
29 salaries
unlock blur

₹4.5 L/yr - ₹9 L/yr

Executive Engineer
17 salaries
unlock blur

₹1.7 L/yr - ₹3.4 L/yr

Executive
14 salaries
unlock blur

₹2 L/yr - ₹3 L/yr

Explore more salaries
Compare Desire Energy Solution with

State Street Syntel

3.7
Compare

Indusind Marketing & Financial Services

3.8
Compare

Home First Finance Company India

3.6
Compare

Pamac Finserve

3.3
Compare
write
Share an Interview