i
Larsen & Toubro Limited
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
RCC ful form is Reinforced Cement Concrete.
RCC stands for Reinforced Cement Concrete.
It is a composite material made of cement, sand, aggregates, and reinforcement bars.
The reinforcement bars, usually made of steel, are embedded within the concrete to enhance its strength and durability.
RCC is commonly used in the construction of buildings, bridges, dams, and other structures.
It provides better tensile strength to with...
M20 is a grade of concrete commonly used in construction projects.
M20 refers to the mix ratio of cement, sand, and aggregate in concrete.
It is a medium-strength concrete grade with a compressive strength of 20 megapascals (MPa).
M20 concrete is suitable for various applications like foundations, slabs, beams, columns, etc.
The mix ratio for M20 concrete is typically 1:1.5:3, which means 1 part cement, 1.5 parts sand, and...
PCC stands for Plain Cement Concrete, which is a type of concrete mixture used in construction.
PCC is made by mixing cement, sand, and coarse aggregates with water.
It is used as a base for flooring, foundations, and other structural elements.
PCC provides a smooth and level surface for further construction work.
The proportions of cement, sand, and aggregates vary depending on the specific requirements of the project.
For...
I applied via Company Website and was interviewed in Apr 2024. There were 2 interview rounds.
All work done completed Target
I applied via Job Fair and was interviewed in Sep 2023. There were 3 interview rounds.
What people are saying about Larsen & Toubro Limited
I applied via Referral and was interviewed in Oct 2021. There were 2 interview rounds.
Test my work on site
Larsen & Toubro Limited interview questions for designations
I applied via Approached by Company and was interviewed in Nov 2021. There were 2 interview rounds.
The interview questions cover topics such as derivation, mix, binding wire, water cement ratio, and recent experience.
D²/162 is derived from the formula for calculating the weight of a steel bar
Nominal mix refers to the mix of cement, sand, and aggregate in a fixed ratio
Design mix is a mix of cement, sand, and aggregate that is designed to meet specific requirements
The cost per tonne of binding wire varies depending on...
posted on 13 Feb 2022
posted on 17 Mar 2022
I applied via AmbitionBox and was interviewed in Feb 2022. There were 2 interview rounds.
I applied via Approached by Company
Lap length and development length for hoop, grade of concrete, and HDPE pipe are specified in code.
Lap length for hoop reinforcement is specified in IS 456:2000 and varies based on the diameter of the bar and the grade of concrete.
Development length is the length of the bar required to transfer the stress from the bar to the surrounding concrete and is also specified in IS 456:2000.
The grade of concrete determines the ...
I applied via Company Website and was interviewed in Jul 2021. There was 1 interview round.
I have 5 years of experience as a Project Engineer Civil. My skills include project management, structural design, and construction supervision.
5 years of experience as a Project Engineer Civil
Proficient in project management, structural design, and construction supervision
Managed multiple civil engineering projects from conception to completion
Developed and implemented project plans, budgets, and schedules
Collaborated...
I have worked on various civil engineering projects, specializing in project management and design.
Managed a team of engineers and contractors to successfully complete a bridge construction project within the given timeline and budget.
Designed and supervised the construction of a wastewater treatment plant, ensuring compliance with environmental regulations.
Implemented innovative solutions to optimize the design and co...
based on 120 reviews
Rating in categories
Assistant Manager
3.8k
salaries
| ₹6.4 L/yr - ₹20 L/yr |
Senior Engineer
3.4k
salaries
| ₹4.5 L/yr - ₹15.1 L/yr |
Engineer
1.2k
salaries
| ₹1.6 L/yr - ₹9.1 L/yr |
Assistant Construction Manager
1.2k
salaries
| ₹5 L/yr - ₹18.5 L/yr |
Manager
1.1k
salaries
| ₹9.6 L/yr - ₹30 L/yr |
Tata Group
Reliance Industries
Adani Group
Mahindra & Mahindra