I applied via Walk-in and was interviewed in Jun 2022. There were 2 interview rounds.
To find out bbs, rebar weight and scrap %, one can use formulas and measurements.
Calculate the total length of rebar required for the project
Determine the spacing and diameter of the rebar
Use the weight formula to find out the weight of the rebar
To find out scrap %, measure the length of unused rebar and divide by total length
Keep track of all measurements and calculations for accurate results
To find stirrup bend degree, use trigonometry and geometry. To calculate length of cutting and bending, use formulas and measurements.
Use trigonometry to find the angle of the bend.
Use geometry to determine the length of the stirrup.
To calculate the length of cutting and bending, use formulas such as L = 2(C + 2D) + 10% extra length.
Measurements such as diameter and spacing are also important in determining the length ...
Top trending discussions
If casing gets trapped after concreting, I would follow these steps to resolve the issue.
Assess the situation and determine the cause of the casing getting trapped
If the casing is stuck due to concrete hardening, try to break the concrete around it using appropriate tools
If breaking the concrete is not feasible, consider using a hydraulic jack to push the casing out
Consult with experienced professionals or engineers fo...
I applied via Company Website and was interviewed in Aug 2020. There was 1 interview round.
I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.
posted on 19 Feb 2021
I applied via Walk-in and was interviewed in Sep 2020. There was 1 interview round.
posted on 4 Apr 2021
I applied via Walk-in and was interviewed in Mar 2021. There was 1 interview round.
K7 and K9 are types of ductile iron pipes with different pressure ratings.
K7 pipes have a pressure rating of 7 bar, while K9 pipes have a pressure rating of 9 bar.
The pressure rating determines the maximum pressure the pipe can withstand without bursting.
K9 pipes are thicker and stronger than K7 pipes, making them suitable for high-pressure applications.
DI pipes are commonly used in water supply, sewage, and irrigation...
posted on 28 Aug 2022
I applied via Walk-in and was interviewed in Feb 2022. There were 2 interview rounds.
Reasoning maths and general awareness
posted on 30 Jun 2022
I applied via Referral and was interviewed in May 2022. There were 4 interview rounds.
Question related to civil engineering
Civil site engineers are responsible for overseeing construction projects and ensuring they meet safety and quality standards.
Supervising construction projects
Ensuring compliance with safety and quality standards
Collaborating with architects and contractors
Managing budgets and timelines
Performing site inspections and surveys
Preparing reports and documentation
Assignment of any RCC work which done on site.
posted on 20 May 2023
I applied via Walk-in and was interviewed before May 2022. There were 3 interview rounds.
posted on 4 Apr 2023
I applied via Walk-in and was interviewed in Mar 2023. There was 1 interview round.
Some of the top questions asked at the L&T Heavy Civil Infrastructure Civil Supervisor interview -
based on 1 review
Rating in categories
Assistant Manager
46
salaries
| ₹5.8 L/yr - ₹12.5 L/yr |
Senior Engineer
36
salaries
| ₹3.3 L/yr - ₹8.5 L/yr |
QA QC Engineer
22
salaries
| ₹3 L/yr - ₹9.2 L/yr |
Assistant Construction Manager
21
salaries
| ₹6 L/yr - ₹15 L/yr |
Safety Supervisor
21
salaries
| ₹2 L/yr - ₹4.5 L/yr |
Tata Projects
Shapoorji Pallonji Group
Kalpataru Projects International
Nagarjuna Construction Company