I applied via Walk-in and was interviewed in Jun 2022. There were 2 interview rounds.
To find out bbs, rebar weight and scrap %, one can use formulas and measurements.
Calculate the total length of rebar required for the project
Determine the spacing and diameter of the rebar
Use the weight formula to find out the weight of the rebar
To find out scrap %, measure the length of unused rebar and divide by total length
Keep track of all measurements and calculations for accurate results
To find stirrup bend degree, use trigonometry and geometry. To calculate length of cutting and bending, use formulas and measurements.
Use trigonometry to find the angle of the bend.
Use geometry to determine the length of the stirrup.
To calculate the length of cutting and bending, use formulas such as L = 2(C + 2D) + 10% extra length.
Measurements such as diameter and spacing are also important in determining the length ...
Top trending discussions
posted on 14 Nov 2017
I was interviewed before Nov 2016.
Leveling is the process of determining the height or elevation of a point or surface relative to a reference point.
Leveling is commonly used in civil engineering and construction to ensure accurate measurements and proper alignment.
It involves the use of leveling instruments such as a level, theodolite, or laser level.
The process typically includes setting up benchmarks or reference points, taking readings at different...
The diameter of six mm refers to the size or measurement of a circular object that is six millimeters in width.
The diameter is the distance across the center of a circle, passing through the circumference.
A six mm diameter can be visualized as a circle with a width of six millimeters.
It is a common measurement used in various industries, including engineering and manufacturing.
For example, a six mm diameter steel rod w...
LEP stands for Load Equivalent Factor for Pavement design.
LEP is used in pavement design to determine the load-carrying capacity of the pavement.
The formula for LEP depends on the specific design method being used.
For example, in the AASHTO design method, LEP is calculated using the formula: LEP = (ESAL/1000) * (1 + 0.003 * (T - 3))
Here, ESAL is the Equivalent Single Axle Load and T is the pavement design period in yea...
posted on 6 Sep 2023
I applied via Company Website and was interviewed in Aug 2023. There were 3 interview rounds.
Related to auto level and total station one more thing buliding material
posted on 28 Nov 2023
I applied via Company Website and was interviewed before Nov 2022. There were 2 interview rounds.
The lap length of a bar in a beam is the length of overlap between two reinforcing bars.
Lap length is important for ensuring the transfer of load between bars.
It helps in maintaining the continuity of reinforcement.
The lap length depends on factors like bar diameter, concrete strength, and design requirements.
It is typically specified in building codes or structural design drawings.
For example, in a beam, the lap lengt...
The ratio of M15 grade of concrete is 1:2:4.
The ratio of M15 grade of concrete refers to the proportion of cement, sand, and aggregate used in the mix.
For M15 grade concrete, the ratio is 1 part cement : 2 parts sand : 4 parts aggregate.
This means that for every 1 unit of cement, 2 units of sand, and 4 units of aggregate are used.
The ratio is usually represented as 1:2:4.
posted on 16 Dec 2022
I applied via Walk-in and was interviewed in Nov 2022. There were 2 interview rounds.
WCR stands for Working Capital Ratio.
Working Capital Ratio is a financial metric used to measure a company's liquidity and ability to pay off its short-term debts.
It is calculated by dividing a company's current assets by its current liabilities.
A WCR of 1 or higher indicates that a company has enough current assets to cover its current liabilities.
A WCR below 1 may indicate that a company may have difficulty paying of...
The minimum thickness of grade slab depends on the load it will bear and the soil conditions.
The thickness of the grade slab should be determined by a structural engineer.
It should be thick enough to support the weight of the structure and any additional loads.
The soil conditions should also be taken into consideration when determining the thickness.
For example, if the soil is soft or unstable, a thicker slab may be re...
Planning is the process of creating a roadmap to achieve a specific goal or objective.
It involves identifying the goal or objective
Determining the steps needed to achieve it
Allocating resources and setting timelines
Monitoring progress and making adjustments as necessary
Examples include project planning, financial planning, and strategic planning
posted on 1 Nov 2022
I applied via Approached by Company and was interviewed in Oct 2022. There were 3 interview rounds.
Surgery in field what ever you ask not issue
posted on 18 Jan 2022
I applied via Company Website and was interviewed in Aug 2020. There was 1 interview round.
I applied via Recruitment Consulltant
BBS Billing Quality is crucial for accurate project cost estimation and tracking.
BBS (Bar Bending Schedule) should be accurate and detailed to ensure correct quantity take-offs.
Quality control measures should be in place to verify the accuracy of BBS.
Regular audits and checks should be conducted to ensure billing quality.
Inaccurate BBS can lead to cost overruns and delays in project completion.
Site engineering plays a crucial role in construction by overseeing the planning, design, and execution of projects.
Site engineers are responsible for surveying the construction site and preparing detailed plans and layouts.
They collaborate with architects and contractors to ensure that the project meets all specifications and regulations.
Site engineers supervise the construction process, monitor progress, and resolve ...
Site execution involves the implementation of construction plans and managing the construction process on-site.
Site execution includes activities such as earthwork, foundation construction, structural work, and finishing work.
It involves coordinating with various stakeholders, including architects, contractors, and suppliers.
Ensuring compliance with building codes, safety regulations, and quality standards is crucial d...
Some of the top questions asked at the L&T Heavy Civil Infrastructure Civil Supervisor interview -
based on 1 review
Rating in categories
Assistant Manager
46
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
36
salaries
| ₹0 L/yr - ₹0 L/yr |
QA QC Engineer
23
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Construction Manager
21
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Supervisor
21
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company
GAMMON INDIA