Upload Button Icon Add office photos

Filter interviews by

Clear (1)

L&T Heavy Civil Infrastructure Junior Engineer Interview Questions and Answers

Updated 2 May 2023

L&T Heavy Civil Infrastructure Junior Engineer Interview Experiences

1 interview found

Junior Engineer Interview Questions & Answers

user image Rohit Rawat

posted on 2 May 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I applied via Company Website and was interviewed before May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all Resume tips
Round 2 - Technical 

(3 Questions)

  • Q1. Building materials,
  • Q2. Surveying and Estimate costing
  • Q3. Side knowledge of Buildings and interior work

Interview Preparation Tips

Topics to prepare for L&T Heavy Civil Infrastructure Junior Engineer interview:
  • Building Material
Interview preparation tips for other job seekers - As a junior engineer

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Civil engineering
  • Q2. Civil engineering responsibility timely site work .
Round 3 - Technical 

(2 Questions)

  • Q1. Civil engineering
  • Q2. Site relative question
Round 4 - Technical 

(2 Questions)

  • Q1. Site Execution qution
  • Q2. Highway Road Project qution

Interview Preparation Tips

Interview preparation tips for other job seekers - Bridges ,Highway Road Project and Railway Project flyovers

I applied via Referral and was interviewed in Jan 2021. There was 1 interview round.

Interview Questionnaire 

9 Questions

  • Q1. When I services
  • Q2. Are you pass higher secondary exam?
  • Q3. What is your birthday
  • Q4. When are you pass civil engineering diploma
  • Q5. When are you pass higher secondary
  • Q6. When are you pass HSLC
  • Ans. 

    I passed HSLC in 2015.

    • I passed HSLC in 2015.

    • I completed my HSLC in 2015.

    • I cleared the HSLC examination in 2015.

  • Answered by AI
  • Q7. Are you experiencing
  • Q8. Please Adress?
  • Ans. Vill: Bagariguri , PO: Jajori , DIST.: Nagaon, pin: 782142
  • Answered by Sanjib Bordoloi
  • Q9. Your father name?

Interview Preparation Tips

Interview preparation tips for other job seekers - Yes, share my job, I have passed civil engineering diploma in 1996 year
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(2 Questions)

  • Q1. Why are u joining in your company
  • Q2. In this job no timings didn't week off's .. are u ready for the job

Interview Preparation Tips

Interview preparation tips for other job seekers - Look in to work don't interested any other falling of works like politics
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Election of LT HT
  • Q2. Power system parts of Erection
  • Ans. 

    Power system parts of Erection include transformers, switchgear, cables, and busbars.

    • Transformers are used to step up or step down voltage levels in the power system.

    • Switchgear is used to control, protect, and isolate electrical equipment.

    • Cables are used to transmit electrical power from one point to another.

    • Busbars are used to distribute electrical power within a substation or switchyard.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Salary discussion
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Regarding work Experience
  • Q2. Electrical Distribution network execution
Round 3 - HR 

(1 Question)

  • Q1. Current & expected CTC.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2024. There were 2 interview rounds.

Round 1 - Assignment 

Project Details Work Assignment

Round 2 - Technical 

(1 Question)

  • Q1. Conductor Capacity Rating
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all Resume tips
Round 2 - Technical 

(5 Questions)

  • Q1. Questions raising on earth work and structures
  • Q2. How many dumpers needed for 15 km how many excavators required
  • Ans. 

    The number of dumpers and excavators needed for a 15 km project depends on various factors such as the type of material being transported and the size of the excavation area.

    • The number of dumpers needed for a 15 km project will depend on the volume and weight of material to be transported, as well as the capacity of each dumper.

    • The number of excavators required will depend on the size of the excavation area, the type o...

  • Answered by AI
  • Q3. What is called a lead
  • Ans. 

    A lead is a potential customer or client who has shown interest in a product or service.

    • A lead is typically generated through marketing efforts such as advertising or networking.

    • Leads can be obtained through various channels such as social media, email campaigns, or trade shows.

    • Once a lead is identified, they are usually passed on to the sales team for further follow-up and conversion.

    • Qualifying leads involves determin...

  • Answered by AI
  • Q4. How much quantity will done 200 machine in hour
  • Ans. 

    The quantity done by 200 machines in an hour depends on the efficiency and capacity of each machine.

    • The quantity done will depend on the output capacity of each machine

    • Factors such as machine speed, efficiency, and type of work being done will also impact the quantity produced

    • For example, if each machine can produce 10 units per hour, then 200 machines will produce 2000 units in an hour

  • Answered by AI
  • Q5. Questioned agin lining works
Round 3 - HR 

(1 Question)

  • Q1. Asking about changing of company and next about my native place

Interview Preparation Tips

Interview preparation tips for other job seekers - Study wll and other wise you can fail
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Electrical questions
Round 2 - HR 

(1 Question)

  • Q1. Salary discussion
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - One-on-one 

(3 Questions)

  • Q1. M20 Grade concrete ratio
  • Ans. 

    M20 Grade concrete ratio is 1:1.5:3 (cement:sand:aggregate)

    • M20 Grade concrete has a ratio of 1:1.5:3 for cement:sand:aggregate

    • This means for every 1 part of cement, 1.5 parts of sand and 3 parts of aggregate are used

    • The total proportion is 1:1.5:3 which is commonly used in construction projects

  • Answered by AI
  • Q2. How to check plaster
  • Ans. 

    Plaster can be checked by examining its color, texture, hardness, and adhesion to the surface.

    • Check the color of the plaster for any discoloration or uneven patches.

    • Feel the texture of the plaster to ensure it is smooth and free of bumps or cracks.

    • Test the hardness of the plaster by gently tapping it with a tool or fingernail.

    • Check the adhesion of the plaster by trying to peel it off the surface.

  • Answered by AI
  • Q3. How to calculate bbs of ring.
  • Ans. 

    To calculate the bar bending schedule (BBS) of a ring, you need to determine the diameter of the ring, the number of bars required, and the length of each bar.

    • Calculate the circumference of the ring using the formula 2 * π * r, where r is the radius of the ring.

    • Determine the spacing between the bars based on the design requirements and the diameter of the bars.

    • Calculate the total length of bars required by multiplying ...

  • Answered by AI
Contribute & help others!
anonymous
You can choose to be anonymous

L&T Heavy Civil Infrastructure Interview FAQs

How many rounds are there in L&T Heavy Civil Infrastructure Junior Engineer interview?
L&T Heavy Civil Infrastructure interview process usually has 2 rounds. The most common rounds in the L&T Heavy Civil Infrastructure interview process are Resume Shortlist and Technical.
What are the top questions asked in L&T Heavy Civil Infrastructure Junior Engineer interview?

Some of the top questions asked at the L&T Heavy Civil Infrastructure Junior Engineer interview -

  1. Side knowledge of Buildings and interior w...read more
  2. Surveying and Estimate cost...read more
  3. Building materia...read more

Recently Viewed

INTERVIEWS

UPL

No Interviews

INTERVIEWS

Ksolves India Limited

No Interviews

INTERVIEWS

UPL

No Interviews

INTERVIEWS

UPL

No Interviews

INTERVIEWS

UPL

No Interviews

INTERVIEWS

Ksolves India Limited

No Interviews

INTERVIEWS

Ksolves India Limited

20 top interview questions

INTERVIEWS

MulticoreWare

5.6k top interview questions

INTERVIEWS

L&T Heavy Civil Infrastructure

10 top interview questions

INTERVIEWS

UPL

No Interviews

Tell us how to improve this page.

L&T Heavy Civil Infrastructure Junior Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more
L&T Heavy Civil Infrastructure Junior Engineer Salary
based on 7 salaries
₹2.3 L/yr - ₹5.5 L/yr
At par with the average Junior Engineer Salary in India
View more details
Assistant Manager
46 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
36 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

QA QC Engineer
23 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Construction Manager
21 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Safety Supervisor
21 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare L&T Heavy Civil Infrastructure with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview