L&T Heavy Civil Infrastructure Civil Site Engineer Interview Questions and Answers

Updated 26 Feb 2024

L&T Heavy Civil Infrastructure Civil Site Engineer Interview Experiences

3 interviews found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is construction.
  • Ans. 

    Construction is the process of building or assembling infrastructure, buildings, or other structures.

    • Construction involves planning, designing, and executing projects

    • It includes activities such as excavation, foundation work, framing, and finishing

    • Materials used in construction can vary from wood and concrete to steel and glass

    • Examples of construction projects include building houses, bridges, roads, and skyscrapers

  • Answered by AI
  • Q2. What is IRC plan . And date for plan
  • Ans. 

    IRC plan refers to Indian Road Congress plan which provides guidelines for road construction and design.

    • IRC plan is a set of guidelines and standards for road construction and design in India.

    • It covers various aspects such as road alignment, pavement design, drainage, and traffic signs.

    • The latest IRC plan is IRC:SP:73-2015 which provides updated standards for road infrastructure.

    • Engineers and contractors refer to IRC p...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I am a civil engineering in diploma.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
No response

I applied via Company Website and was interviewed before Feb 2023. There was 1 interview round.

Round 1 - HR 

(3 Questions)

  • Q1. Salary expectation n experience
  • Ans. My previous salary n expected ctc
  • Answered Anonymously
  • Q2. Joining time n notice period
  • Q3. Location n relocation

Interview Preparation Tips

Topics to prepare for L&T Heavy Civil Infrastructure Civil Site Engineer interview:
  • Civil Engineering
  • Work management
Interview preparation tips for other job seekers - Speak frankly and honestly

Civil Site Engineer Interview Questions Asked at Other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
Q2. If you have 10x10 feet room and you have 600x600 mm size tiles th ... read more
asked in TCE
Q3. If your concrete is M50 and 28 days cube test result is below 100 ... read more
Q4. 1.What is the thickness of plastering?, 2.What is name of plaster ... read more
Q5. What is the time period of open bag cement

Interview Questionnaire 

2 Questions

  • Q1. Only for site work questions
  • Q2. Taxyway bed prapetion

Interview Preparation Tips

Interview preparation tips for other job seekers - No advice

Interview questions from similar companies

I applied via Company Website and was interviewed before Apr 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(6 Questions)

  • Q1. Share details of your previous job.
  • Q2. Why should we hire you?
  • Q3. Why are you looking for a change?
  • Q4. Where do you see yourself in 5 years?
  • Q5. What are your strengths and weaknesses?
  • Q6. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Applying for civil site engineer

I applied via Walk-in and was interviewed in Sep 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Swsm project

Interview Preparation Tips

Interview preparation tips for other job seekers - Walk-in interview technical
Round 1 - Technical 
Round 2 - HR 

(8 Questions)

  • Q1. What are your salary expectations?
  • Q2. What is your family background?
  • Q3. Share details of your previous job.
  • Q4. Why should we hire you?
  • Q5. Where do you see yourself in 5 years?
  • Q6. Why are you looking for a change?
  • Q7. What are your strengths and weaknesses?
  • Q8. Tell me about yourself.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Metro project Bumbai
  • Q2. Metro project Bumbai j.kumar
  • Q3. J.kumar metro project
  • Ans. 

    J.kumar metro project is a major infrastructure project involving construction of metro rail system.

    • J.kumar metro project is a large-scale infrastructure project focused on building a metro rail system.

    • The project involves various stages such as planning, design, construction, and implementation.

    • It may include tasks like excavation, tunneling, track laying, station construction, etc.

    • The project requires coordination wi...

  • Answered by AI
  • Q4. Site Engineer , metro project
  • Q5. Very good company

Interview Preparation Tips

Topics to prepare for J. Kumar Infraprojects Civil Site Engineer interview:
  • Civil Engineering
  • Site Engineering
  • Site Supervision
Interview preparation tips for other job seekers - Site Engineer

I applied via Walk-in and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. What type of DI pipes k7 and k9 means
  • Ans. 

    K7 and K9 are types of ductile iron pipes with different pressure ratings.

    • K7 pipes have a pressure rating of 7 bar, while K9 pipes have a pressure rating of 9 bar.

    • The pressure rating determines the maximum pressure the pipe can withstand without bursting.

    • K9 pipes are thicker and stronger than K7 pipes, making them suitable for high-pressure applications.

    • DI pipes are commonly used in water supply, sewage, and irrigation...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Ans. Any questions confidently

Interview Questionnaire 

1 Question

  • Q1. What will u do if casing traped after Concreating
  • Ans. 

    If casing gets trapped after concreting, I would follow these steps to resolve the issue.

    • Assess the situation and determine the cause of the casing getting trapped

    • If the casing is stuck due to concrete hardening, try to break the concrete around it using appropriate tools

    • If breaking the concrete is not feasible, consider using a hydraulic jack to push the casing out

    • Consult with experienced professionals or engineers fo...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Shear ur experience on sight & remember all

I applied via Walk-in and was interviewed in Feb 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is a aluminium formwork? , Knowledge of mivan and it's part, questions related to drowning,and types of drowning i reffer, BBS related questions, alignment,level, Steel bar
  • Q2. What is mix design? Use of mix design at different construction project.
  • Ans. 

    Mix design is the process of determining the proportions of ingredients to be used in concrete or asphalt.

    • Mix design ensures the desired strength and durability of the construction material.

    • It takes into account factors such as the type of aggregate, cement, water, and admixtures.

    • Mix design is used in various construction projects such as buildings, roads, bridges, and dams.

    • For example, a mix design for a high-rise bui...

  • Answered by AI
  • Q3. Batching plant test of concrete
  • Ans. 

    Batching plant test of concrete is a process to ensure the quality of concrete before it is used in construction.

    • Batching plant test involves checking the strength, workability, and consistency of concrete.

    • Tests are conducted on samples of concrete taken from the batching plant.

    • Tests include slump test, compressive strength test, and water-cement ratio test.

    • Results of the tests are compared with the specifications to e...

  • Answered by AI
Round 3 - HR 

(3 Questions)

  • Q1. Accommodation related
  • Q2. Perivous company CTC
  • Q3. Previous company details

Interview Preparation Tips

Topics to prepare for TCE Civil Site Engineer interview:
  • Aluminium
  • Concrete
  • Formwork
  • Adavance construction knowledge
Interview preparation tips for other job seekers - Knowledge of Indian standard code is must
I have to Concrete mix design knowledge
Knowledge of mivan shuttering and parts
Quality of material

L&T Heavy Civil Infrastructure Interview FAQs

How many rounds are there in L&T Heavy Civil Infrastructure Civil Site Engineer interview?
L&T Heavy Civil Infrastructure interview process usually has 1-2 rounds. The most common rounds in the L&T Heavy Civil Infrastructure interview process are Resume Shortlist, Technical and HR.
What are the top questions asked in L&T Heavy Civil Infrastructure Civil Site Engineer interview?

Some of the top questions asked at the L&T Heavy Civil Infrastructure Civil Site Engineer interview -

  1. What is IRC plan . And date for p...read more
  2. What is constructi...read more
  3. Location n relocat...read more

Tell us how to improve this page.

L&T Heavy Civil Infrastructure Civil Site Engineer Interview Process

based on 2 interviews

Interview experience

5
  
Excellent
View more
L&T Heavy Civil Infrastructure Civil Site Engineer Salary
based on 19 salaries
₹2 L/yr - ₹6.3 L/yr
At par with the average Civil Site Engineer Salary in India
View more details

L&T Heavy Civil Infrastructure Civil Site Engineer Reviews and Ratings

based on 5 reviews

4.5/5

Rating in categories

3.7

Skill development

4.2

Work-life balance

4.2

Salary

3.5

Job security

3.7

Company culture

3.9

Promotions

3.5

Work satisfaction

Explore 5 Reviews and Ratings
Assistant Manager
46 salaries
unlock blur

₹5.8 L/yr - ₹12.5 L/yr

Senior Engineer
36 salaries
unlock blur

₹3.3 L/yr - ₹8.5 L/yr

QA QC Engineer
25 salaries
unlock blur

₹3 L/yr - ₹9.2 L/yr

Assistant Construction Manager
21 salaries
unlock blur

₹6 L/yr - ₹15 L/yr

Safety Supervisor
21 salaries
unlock blur

₹2 L/yr - ₹4.5 L/yr

Explore more salaries
Compare L&T Heavy Civil Infrastructure with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Kalpataru Projects International

4.1
Compare

Nagarjuna Construction Company

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview