I applied via LinkedIn and was interviewed in Oct 2024. There were 3 interview rounds.

Round 1 - Assignment 

Operation and maintenance plan election all equipment repairing and maintenance

Round 2 - One-on-one 

(3 Questions)

  • Q1. Machinery department
  • Q2. Technical machinery department
  • Q3. Plant and machinery department
Round 3 - HR 

(1 Question)

  • Q1. Plant machinery department

I applied via Company Website and was interviewed before Jan 2020. There were 5 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. What difference between 2D &3 D
  • Ans. 

    2D is flat, 3D has depth and volume

    • 2D is two-dimensional, with only length and width

    • 3D is three-dimensional, with length, width, and depth

    • 2D is commonly used for drawings, while 3D is used for modeling and animation

    • Examples of 2D include photographs and paintings, while examples of 3D include sculptures and video games

  • Answered by AI
  • Q2. 2d Shown 2 direction dimensins & 3d shown 3 direction dimensions
  • Ans. 

    2d and 3d dimensions differ in the number of directions shown.

    • 2d dimensions show two directions, typically x and y.

    • 3d dimensions show three directions, typically x, y, and z.

    • 2d drawings are often used for floor plans and elevations, while 3d models are used for visualizing complex structures.

    • 2d dimensions are often used in engineering and architecture, while 3d dimensions are used in fields such as video game design an

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - No majority fond in interview

Mechanical Foreman Interview Questions Asked at Other Companies

Q1. Will you be able to manage confined space activities?? What are t ... read more
asked in S&P Global
Q2. Which purpose is the turbine&generator coupling and which pur ... read more
Q3. Explain the procedure of dismantling a control valve which is at ... read more
asked in S&P Global
Q4. Which purpose flow path redial axial check in rotor to casing
asked in BGC Limited
Q5. Can you imagine to fire emergency, what you will think first

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(7 Questions)

  • Q1. Quality and material control
  • Q2. Work Productivity
  • Q3. Rre_productivity
  • Q4. Post product activity
  • Q5. Good knowledge and good behaviour
  • Q6. Pre_productivity
  • Q7. Post productivity

Interview Preparation Tips

Interview preparation tips for other job seekers - PSP PROJECT LMT
Civil Foreman
Responsible for All works at Building Construction.
Barbending, Shuttering carpentery, Masonry and finishing works.
Responsible for work done with good productivity.
Labournet services India Pvt Ltd
Senior Civil Trainer
Working as a Civil construction Trainer.
Certified in Assistant mason and Shuttering carpentery trade by NSDC.
Worked in multiple Skill development projects.
NAREDCO, PMKVY, BOCW and Morth.
Trained more than 500 labourers under skill development program.
L&T Construction
Civil Supervisor
Responsible for All works at Building Construction.
Barbending, Shuttering carpentery, Masonry and finishing works.
Responsible for work done with good productivity.
Al Jaber Group Dubai UAE
Chargehand
Worked as a chargehand with the team of 15 labour.
Completed on time construction works.
Responsible for Barbending works completion as per drawing.
Al Jaber Group Dubai UAE
Civil Foreman
Worked as a Civil Formen with the team of 15 labour.
Barbending, Shuttering carpentery, Masonry and finishing works.
Completed on time construction works.
Responsible for Barbending works completion as per drawing.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - One-on-one 

(11 Questions)

  • Q1. Scar drawing and technical point
  • Q2. With safety trying best output
  • Q3. Field requirement and safety first
  • Q4. Working area material properly staged
  • Q5. Focus on work quality
  • Q6. Be carefull with machinery
  • Q7. Everytime touch with workers
  • Q8. Given detail of senior timely
  • Q9. Proper discussion with senior
  • Q10. Touch with total staff
  • Ans. 

    Maintain regular communication and interaction with all staff members.

    • Regularly check in with staff to ensure they have the resources and support they need

    • Hold regular team meetings to discuss project progress and address any concerns

    • Encourage open communication and feedback from all team members

    • Provide opportunities for team building and collaboration

    • Lead by example by being accessible and approachable to all staff me

  • Answered by AI
  • Q11. Given 110% daily
Interview experience
2
Poor
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected
Round 1 - HR 

(2 Questions)

  • Q1. Highway & Wey explain in layer chart
  • Q2. What is road project kraw &shlop

Interview Preparation Tips

Interview preparation tips for other job seekers - involve in service sector for example highway & expressway project
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Lg and gantry works
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2023. There was 1 interview round.

Round 1 - Technical 

(8 Questions)

  • Q1. Tower cranes banding mesihan
  • Q2. Panel elr chatting Masina
  • Q3. Db bord DG elr panel
  • Q4. Elr panel material lift
  • Q5. Pessenger lift LR panel LR panel
  • Q6. Commercial motor
  • Q7. Material lift LR panel LR panel
  • Q8. LR panel pessenger lift
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Civil Foreman work 

(6 Questions)

  • Q1. What BBS in contraction
  • Ans. 

    BBS in construction stands for Bar Bending Schedule.

    • BBS is a document that provides details about the reinforcement steel bars used in a construction project.

    • It includes information about the size, shape, quantity, and placement of the bars.

    • BBS helps in estimating the required amount of steel, planning the cutting and bending of bars, and ensuring proper reinforcement in the structure.

    • Example: BBS for a column may spec...

  • Answered by AI
  • Q2. What is mix ratio M 25
  • Ans. 

    Mix ratio M 25 is a concrete mix design that consists of 1 part cement, 1 part fine aggregate, and 2 parts coarse aggregate.

    • M 25 mix ratio is commonly used in construction for structural applications.

    • The mix ratio represents the proportions of different materials used in the concrete mix.

    • For M 25, the ratio is 1:1:2, which means 1 part cement, 1 part fine aggregate (sand), and 2 parts coarse aggregate (stone chips or g...

  • Answered by AI
  • Q3. How many zone in u grider
  • Ans. 

    The number of zones in a u grider varies depending on the specific design and requirements.

    • The number of zones in a u grider can range from 1 to multiple zones.

    • Zones are typically created to divide the grider into sections for better load distribution and structural stability.

    • The number of zones may be determined by factors such as the length and span of the grider, the load it needs to support, and the design specific...

  • Answered by AI
  • Q4. How calculate zone Azone 3,700m B zone 1000ma& C zone remaining in center
  • Ans. 

    To calculate zone A, zone B, and zone C, you need to know the total area and the dimensions of each zone.

    • Determine the total area of the site

    • Calculate the area of zone A by subtracting the combined area of zones B and C from the total area

    • Calculate the area of zone B using the given dimension

    • Calculate the area of zone C by subtracting the area of zone B from the total area

    • Ensure the units of measurement are consistent

  • Answered by AI
  • Q5. How can work in hight
  • Ans. 

    Working at heights requires proper safety measures and equipment.

    • Use appropriate safety harnesses and fall protection systems.

    • Ensure scaffolding and ladders are secure and stable.

    • Follow safety guidelines and regulations.

    • Provide proper training to workers on working at heights.

    • Regularly inspect and maintain equipment and tools.

    • Implement safety barriers and guardrails.

    • Use aerial lifts or platforms for safe access to elev...

  • Answered by AI
  • Q6. How u bihev ur Engeniar
  • Ans. 

    I behave as a civil engineer by being professional, organized, and detail-oriented.

    • I maintain a professional demeanor at all times, treating colleagues and clients with respect.

    • I am organized in my work, keeping track of project timelines, budgets, and resources.

    • I pay attention to details, ensuring accuracy in calculations, measurements, and documentation.

    • I communicate effectively with team members, subcontractors, and...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil foreman concrete & finishing process

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Feb 2024.

Round 1 - One-on-one 

(2 Questions)

  • Q1. What types of materials are used in construction work, and what is the method of statement for their application?
  • Ans. 

    Various materials such as concrete, steel, wood, and formwork are used in construction work, each requiring specific methods of application.

    • Concrete: used for foundations, slabs, and columns. Method of statement includes mixing, pouring, and curing.

    • Steel: used for reinforcement in concrete structures. Method of statement includes cutting, bending, and tying.

    • Wood: used for formwork and framing. Method of statement inclu...

  • Answered by AI
  • Q2. What is the slab cycle and how does it relate to turnaround time?
  • Ans. 

    The slab cycle refers to the time it takes to complete the process of pouring, curing, and removing concrete slabs, which directly impacts the overall turnaround time of a construction project.

    • The slab cycle includes activities such as formwork preparation, concrete pouring, curing, and stripping of formwork.

    • Efficient coordination and scheduling of these activities can help minimize the slab cycle time.

    • Shortening the s...

  • Answered by AI

Interview Questionnaire 

11 Questions

  • Q1. Am civil service. I required job
  • Q2. Required job
  • Q3. Civil foreman job equired
  • Q4. I am civil foreman
  • Q5. Get you job
  • Q6. I am interested in jmc
  • Q7. Get job
  • Q8. Required for job
  • Q9. Job requirements
  • Q10. I am interested job
  • Q11. Please refer

L&T Heavy Civil Infrastructure Interview FAQs

How many rounds are there in L&T Heavy Civil Infrastructure Mechanical Foreman interview?
L&T Heavy Civil Infrastructure interview process usually has 3 rounds. The most common rounds in the L&T Heavy Civil Infrastructure interview process are Assignment, One-on-one Round and HR.
What are the top questions asked in L&T Heavy Civil Infrastructure Mechanical Foreman interview?

Some of the top questions asked at the L&T Heavy Civil Infrastructure Mechanical Foreman interview -

  1. 2d Shown 2 direction dimensins & 3d shown 3 direction dimensi...read more
  2. what difference between 2D &...read more
  3. Technical machinery departm...read more

Tell us how to improve this page.

L&T Heavy Civil Infrastructure Mechanical Foreman Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 425 Interviews
KEC International Interview Questions
4.0
 • 297 Interviews
TCE Interview Questions
3.8
 • 247 Interviews
Saint-Gobain Interview Questions
4.0
 • 172 Interviews
Worley Interview Questions
4.1
 • 109 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
View all
Assistant Manager
46 salaries
unlock blur

₹5.8 L/yr - ₹12.5 L/yr

Senior Engineer
36 salaries
unlock blur

₹3.3 L/yr - ₹8.5 L/yr

QA QC Engineer
25 salaries
unlock blur

₹3 L/yr - ₹8 L/yr

Assistant Construction Manager
21 salaries
unlock blur

₹6 L/yr - ₹15 L/yr

Safety Supervisor
21 salaries
unlock blur

₹2 L/yr - ₹4.5 L/yr

Explore more salaries
Compare L&T Heavy Civil Infrastructure with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview