Upload Button Icon Add office photos

Filter interviews by

L&T Heavy Civil Infrastructure Mechanical Foreman Interview Questions and Answers

Updated 31 Oct 2024

L&T Heavy Civil Infrastructure Mechanical Foreman Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
No response

I applied via LinkedIn and was interviewed in Oct 2024. There were 3 interview rounds.

Round 1 - Assignment 

Operation and maintenance plan election all equipment repairing and maintenance

Round 2 - One-on-one 

(3 Questions)

  • Q1. Machinery department
  • Q2. Technical machinery department
  • Q3. Plant and machinery department
Round 3 - HR 

(1 Question)

  • Q1. Plant machinery department

I applied via Company Website and was interviewed before Jan 2020. There were 5 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. What difference between 2D &3 D
  • Ans. 

    2D is flat, 3D has depth and volume

    • 2D is two-dimensional, with only length and width

    • 3D is three-dimensional, with length, width, and depth

    • 2D is commonly used for drawings, while 3D is used for modeling and animation

    • Examples of 2D include photographs and paintings, while examples of 3D include sculptures and video games

  • Answered by AI
  • Q2. 2d Shown 2 direction dimensins & 3d shown 3 direction dimensions
  • Ans. 

    2d and 3d dimensions differ in the number of directions shown.

    • 2d dimensions show two directions, typically x and y.

    • 3d dimensions show three directions, typically x, y, and z.

    • 2d drawings are often used for floor plans and elevations, while 3d models are used for visualizing complex structures.

    • 2d dimensions are often used in engineering and architecture, while 3d dimensions are used in fields such as video game design an

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - No majority fond in interview

Mechanical Foreman Interview Questions Asked at Other Companies

Q1. Will you be able to manage confined space activities?? What are t ... read more
asked in S&P Global
Q2. Which purpose is the turbine&generator coupling and which pur ... read more
Q3. Explain the procedure of dismantling a control valve which is at ... read more
asked in S&P Global
Q4. Which purpose flow path redial axial check in rotor to casing
asked in BGC Limited
Q5. Can you imagine to fire emergency, what you will think first

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jun 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. The first round was technical and it was a hard round as your concept of sap should be clear
  • Q2. Why do u maintain Reconcilation a/c?
  • Ans. 

    Reconciliation accounts are maintained to ensure accuracy and consistency in financial records.

    • Helps in identifying discrepancies between different accounts

    • Ensures accuracy and consistency in financial statements

    • Facilitates easy tracking of transactions and balances

    • Aids in detecting errors or fraud in accounting records

  • Answered by AI
  • Q3. FI MM Integration, FI SD Integration?
  • Q4. What we maintain on company code lvl and client level and why?
  • Ans. 

    Company code level is maintained for global settings applicable to all clients, while client level is maintained for specific settings unique to each client.

    • Company code level settings include currency, chart of accounts, and fiscal year variants.

    • Client level settings include customer master data, vendor master data, and sales organization data.

  • Answered by AI
  • Q5. Phases of blueprint, tables
  • Ans. 

    Blueprint phases include planning, designing, and implementation. Tables are used to organize data in a structured format.

    • Blueprint phases: planning, designing, implementation

    • Tables: organize data in structured format

    • Examples: creating a blueprint for a new building, using tables in a database to store information

  • Answered by AI
Round 3 - One-on-one 

(3 Questions)

  • Q1. Manager round some kind of behavioural check and some technical question asked as they give u scenerio about the work and some accounting questions
  • Q2. General Entries, P2P, OTC, RTR
  • Q3. What bank Reconcilation and validations
  • Ans. 

    Bank reconciliation involves comparing the bank statement with the company's records to ensure they match, while validations involve verifying the accuracy and completeness of financial transactions.

    • Bank reconciliation ensures that the company's records match the bank statement by comparing deposits, withdrawals, and other transactions.

    • Validations involve verifying the accuracy and completeness of financial transaction...

  • Answered by AI
Round 4 - HR 

(2 Questions)

  • Q1. The last round was hr
  • Q2. Some kind of behavioural check, salary discussions, terms and conditions but one thing here the hr round is not a formality round as u have to give full impression over there dont take it simple

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Luck

I applied via Approached by Company and was interviewed before Mar 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. What is CB operation and use?
  • Ans. 

    CB operation and use refers to the operation and use of circuit breakers in electrical systems.

    • CBs are used to protect electrical systems from overloads and short circuits.

    • They work by interrupting the flow of current when a fault is detected.

    • CBs can be manually or automatically operated.

    • They come in different types, such as air, oil, vacuum, and SF6 CBs.

    • CBs are commonly used in residential, commercial, and industrial

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - 3 manths traning and doing any working condition

I appeared for an interview before Oct 2020.

Interview Questionnaire 

2 Questions

  • Q1. About operations and maintenance of electrical equipment
  • Q2. I would like to draw your attention to my interview

Interview Preparation Tips

Interview preparation tips for other job seekers - Telephonic interview for technical and non technical questions both

I applied via Naukri.com and was interviewed in Jan 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Electrical Safety ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Best Organisation for interview skills
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

As

Interview Preparation Tips

Interview preparation tips for other job seekers - Electrical wiring power cable termination
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Machinery cable
  • Q2. Switches and working switches
  • Q3. Cable and swithes
  • Q4. Machinery working
  • Q5. Cable and swithes load
Interview experience
5
Excellent
Difficulty level
-
Process Duration
6-8 weeks
Result
Not Selected

I applied via Monster

Round 1 - Aptitude Test 

Good I wasn't expecting it

Round 2 - Aptitude Test 

Too much logical questions

Round 3 - Coding Test 

Medium questions were there

Round 4 - Coding Test 

Programing questions

Round 5 - Coding Test 

All medium questions leetcode

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare with leetcode
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Electrical any question Electrical pena work
Round 3 - Technical 

(1 Question)

  • Q1. Lighting circuit Dol rdol star delta staer

Interview Preparation Tips

Interview preparation tips for other job seekers - Work in tata project limited
Bokaro steel city
Vedanta..

L&T Heavy Civil Infrastructure Interview FAQs

How many rounds are there in L&T Heavy Civil Infrastructure Mechanical Foreman interview?
L&T Heavy Civil Infrastructure interview process usually has 3 rounds. The most common rounds in the L&T Heavy Civil Infrastructure interview process are One-on-one Round, HR and Assignment.
What are the top questions asked in L&T Heavy Civil Infrastructure Mechanical Foreman interview?

Some of the top questions asked at the L&T Heavy Civil Infrastructure Mechanical Foreman interview -

  1. 2d Shown 2 direction dimensins & 3d shown 3 direction dimensi...read more
  2. what difference between 2D &...read more
  3. Technical machinery departm...read more

Tell us how to improve this page.

L&T Heavy Civil Infrastructure Mechanical Foreman Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 449 Interviews
KEC International Interview Questions
4.0
 • 309 Interviews
TCE Interview Questions
3.7
 • 251 Interviews
Saint-Gobain Interview Questions
4.0
 • 173 Interviews
Worley Interview Questions
4.1
 • 113 Interviews
View all
Assistant Manager
46 salaries
unlock blur

₹5.8 L/yr - ₹12.5 L/yr

Senior Engineer
36 salaries
unlock blur

₹3.3 L/yr - ₹8.5 L/yr

QA QC Engineer
22 salaries
unlock blur

₹3 L/yr - ₹9.2 L/yr

Assistant Construction Manager
21 salaries
unlock blur

₹6 L/yr - ₹15 L/yr

Safety Supervisor
21 salaries
unlock blur

₹2 L/yr - ₹4.5 L/yr

Explore more salaries
Compare L&T Heavy Civil Infrastructure with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Kalpataru Projects International

4.1
Compare

Nagarjuna Construction Company

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview