Instrument Foreman

Instrument Foreman Interview Questions and Answers

Updated 14 Jul 2025
search-icon

Asked in Petrofac

6d ago

Q. What is the drawing and what is a loop checking

Ans.

A drawing is a visual representation of an object or system, while loop checking is a process of verifying the functionality of control loops.

  • A drawing is a graphical representation of an object, system, or process, often created using computer-aided design (CAD) software.

  • Drawings provide detailed information about the dimensions, components, and connections of the object or system.

  • Loop checking is a procedure performed during the commissioning phase of a control system to en...read more

6d ago

Q. What are the all weighing systems principles

Ans.

Weighing systems principles involve accuracy, precision, calibration, and environmental factors.

  • Accuracy: Ensuring the measured weight is close to the true value.

  • Precision: Consistency in obtaining the same weight measurement repeatedly.

  • Calibration: Regularly adjusting the weighing system to maintain accuracy.

  • Environmental factors: Considering conditions like temperature and humidity that can affect weighing results.

5d ago

Q. What PLC languages are used in your plant?

Ans.

The PLC languages used in our plant include ladder logic, function block diagram, and structured text.

  • Ladder logic is commonly used for simple logic operations

  • Function block diagram is used for more complex functions and calculations

  • Structured text is used for advanced programming and customization

4d ago

Q. What are the uses of thermocouples?

Ans.

Thermocouples are used to measure temperature in various industrial applications.

  • Used in temperature measurement in industries like petrochemical, power generation, food processing, etc.

  • Can withstand high temperatures and harsh environments.

  • Provide fast response times and accurate readings.

  • Common types include K, J, T, and E thermocouples.

  • Examples: monitoring temperature in a furnace, controlling temperature in a chemical reactor.

Are these interview questions helpful?

Asked in Petrofac

4d ago

Q. How can pulling the cable?

Ans.

Pulling cable requires proper planning, equipment, and safety measures.

  • Ensure the cable is properly labeled and identified before pulling.

  • Use appropriate equipment such as cable pullers, lubricants, and pulling grips.

  • Plan the route and ensure there are no obstacles or sharp bends that could damage the cable.

  • Ensure proper safety measures are in place, such as wearing personal protective equipment and securing the area.

  • Communicate effectively with the team to ensure everyone is...read more

Q. What is calibration?

Ans.

Calibration is the process of adjusting or checking the accuracy of a measuring instrument by comparing it to a known standard.

  • Calibration ensures that the instrument provides accurate and reliable measurements.

  • It involves adjusting the instrument to match the standard or known value.

  • Calibration is important for maintaining quality control and ensuring consistency in measurements.

  • Examples of calibrated instruments include thermometers, pressure gauges, and scales.

Instrument Foreman Jobs

ASMACS  logo
Instrument Foreman 5-10 years
ASMACS
0.0
₹ 2 L/yr - ₹ 18 L/yr
(AmbitionBox estimate)
Kuwait
4d ago

Q. What is Pm, cm

Ans.

PM stands for Preventive Maintenance and CM stands for Corrective Maintenance in the field of instrumentation.

  • PM involves scheduled inspections, repairs, and replacements to prevent equipment failure.

  • CM involves fixing equipment after it has already failed to restore it to working condition.

  • PM is proactive maintenance while CM is reactive maintenance.

  • Example: Changing filters regularly (PM) vs. replacing a broken sensor (CM).

Instrument Foreman Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
play-icon
play-icon
qr-code
Trusted by over 1.5 Crore job seekers to find their right fit company
80 L+

Reviews

10L+

Interviews

4 Cr+

Salaries

1.5 Cr+

Users

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2025 Info Edge (India) Ltd.

Follow Us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter
Profile Image
Hello, Guest
AmbitionBox Employee Choice Awards 2025
Winners announced!
awards-icon
Contribute to help millions!
Write a review
Write a review
Share interview
Share interview
Contribute salary
Contribute salary
Add office photos
Add office photos
Add office benefits
Add office benefits