I applied via LinkedIn and was interviewed in Oct 2024. There were 3 interview rounds.
Operation and maintenance plan election all equipment repairing and maintenance
posted on 28 May 2024
I applied via campus placement at LD College of Engineering, Ahmedabad and was interviewed in Nov 2023. There were 2 interview rounds.
In aptitude basic aptitude questions around 80question from aptitude I was able to solve 74,75 although test is taken combined of technical and aptitude
Construction is the process of building or assembling infrastructure, buildings, or other structures.
Construction involves planning, designing, and executing projects
It includes activities such as excavation, foundation work, framing, and finishing
Materials used in construction can vary from wood and concrete to steel and glass
Examples of construction projects include building houses, bridges, roads, and skyscrapers
IRC plan refers to Indian Road Congress plan which provides guidelines for road construction and design.
IRC plan is a set of guidelines and standards for road construction and design in India.
It covers various aspects such as road alignment, pavement design, drainage, and traffic signs.
The latest IRC plan is IRC:SP:73-2015 which provides updated standards for road infrastructure.
Engineers and contractors refer to IRC p...
L&T Heavy Civil Infrastructure interview questions for popular designations
I applied via Campus Placement and was interviewed in Apr 2023. There were 3 interview rounds.
Total 120 MCQ type questions
My strength is my ability to analyze problems and come up with effective solutions.
I have strong analytical skills
I am able to think creatively and outside the box
I am able to work well under pressure
I am able to communicate my ideas effectively
Example: In my previous job, I was able to identify a bottleneck in the production line and came up with a solution that increased efficiency by 20%.
Get interview-ready with Top L&T Heavy Civil Infrastructure Interview Questions
I applied via Recruitment Consulltant and was interviewed before Apr 2023. There was 1 interview round.
I applied via Campus Placement and was interviewed in Nov 2022. There were 3 interview rounds.
Quantitative, qualitative, Language
Stress is an internal force per unit area within a material, while pressure is an external force per unit area exerted on a surface.
Stress is a measure of the internal resistance of a material to deformation, while pressure is the force exerted on a surface.
Stress can be caused by external forces or internal forces within a material, while pressure is typically caused by external forces.
Stress is a scalar quantity, whi...
I applied via Walk-in and was interviewed in Jun 2022. There were 2 interview rounds.
To find out bbs, rebar weight and scrap %, one can use formulas and measurements.
Calculate the total length of rebar required for the project
Determine the spacing and diameter of the rebar
Use the weight formula to find out the weight of the rebar
To find out scrap %, measure the length of unused rebar and divide by total length
Keep track of all measurements and calculations for accurate results
To find stirrup bend degree, use trigonometry and geometry. To calculate length of cutting and bending, use formulas and measurements.
Use trigonometry to find the angle of the bend.
Use geometry to determine the length of the stirrup.
To calculate the length of cutting and bending, use formulas such as L = 2(C + 2D) + 10% extra length.
Measurements such as diameter and spacing are also important in determining the length ...
I applied via Company Website and was interviewed before May 2022. There were 2 interview rounds.
I applied via Naukri.com
The number of piles used and length of span depend on the specific project requirements.
The number of piles used will depend on the load capacity required for the structure.
The length of span will depend on the distance between the supports and the load capacity required.
Factors such as soil conditions, environmental factors, and budget will also impact the number of piles and length of span.
For example, a bridge spann...
Top trending discussions
Some of the top questions asked at the L&T Heavy Civil Infrastructure interview -
The duration of L&T Heavy Civil Infrastructure interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 15 interviews
Interview experience
based on 228 reviews
Rating in categories
Assistant Manager
46
salaries
| ₹5.8 L/yr - ₹12.5 L/yr |
Senior Engineer
36
salaries
| ₹3.3 L/yr - ₹8.5 L/yr |
QA QC Engineer
25
salaries
| ₹3 L/yr - ₹8 L/yr |
Assistant Construction Manager
21
salaries
| ₹6 L/yr - ₹15 L/yr |
Safety Supervisor
21
salaries
| ₹2 L/yr - ₹4.5 L/yr |
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company
GAMMON INDIA