Upload Button Icon Add office photos

Filter interviews by

L&T Heavy Civil Infrastructure Interview Questions, Process, and Tips

Updated 31 Oct 2024

Top L&T Heavy Civil Infrastructure Interview Questions and Answers

View all 17 questions

L&T Heavy Civil Infrastructure Interview Experiences

Popular Designations

20 interviews found

I applied via Approached by Company and was interviewed in Jul 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. I am a civil Engg building experience 8 Year
  • Q2. Building work side CANAL WORK BRIDGE WORk culvert

Interview Preparation Tips

Interview preparation tips for other job seekers - MY self Saroj sharma I am civil engineer sambalpur Odisha building 🏢 8 year SITE Engg

Civil Engineer Interview Questions asked at other Companies

Q1. What is the curing formalities for our precast segment???
View answer (22)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via L&T and was interviewed in Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

What is Concrete .and it's type

Round 3 - HR 

(2 Questions)

  • Q1. Initial time of settlement of Concrete
  • Ans. 

    The initial time of settlement of concrete is typically 24-48 hours.

    • The initial time of settlement refers to the time it takes for the concrete to begin to harden and set.

    • Factors that can affect the initial time of settlement include temperature, humidity, and the mix design of the concrete.

    • It is important to allow the concrete to settle properly before any further construction work is done on top of it.

    • Typically, the ...

  • Answered by AI
  • Q2. What's initial setting time of cement
  • Ans. 

    Initial setting time of cement is the time taken by cement to harden and attain a particular strength.

    • Initial setting time is the time taken by cement to harden and attain a particular strength.

    • It is the time from the moment water is added to the cement until the paste starts losing its plasticity.

    • The initial setting time of cement is generally around 30 minutes to 1 hour.

    • It is an important property of cement as it det...

  • Answered by AI

Civil Site Supervisor Interview Questions asked at other Companies

Q1. Which survey in earths 🌍 measurement Survay carefully?
View answer (2)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Aptitude Test 

You can pass if you prepare for ssc exam, but question level a bit tougher

Round 3 - Technical 

(2 Questions)

  • Q1. 2 stroke engine vs 4 stroke engine What is made of piston and why
  • Ans. 

    2 stroke engines have simpler design but less efficient than 4 stroke engines. Pistons are made of aluminum alloy for light weight.

    • 2 stroke engines have only two strokes (intake/compression and power/exhaust) while 4 stroke engines have four strokes (intake, compression, power, and exhaust).

    • 2 stroke engines have simpler design and are lighter but less efficient than 4 stroke engines.

    • Pistons are made of aluminum alloy f...

  • Answered by AI
  • Q2. Types of beams and advantages, height of cycle tire
  • Ans. 

    The question is about types of beams and advantages, and the height of a cycle tire.

    • Types of beams include cantilever, simply supported, fixed, and continuous beams.

    • Advantages of beams include their ability to support weight and distribute loads evenly.

    • The height of a cycle tire varies depending on the type of bike and the size of the tire.

    • For example, a road bike tire may have a height of 23mm, while a mountain bike t

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be ready to give answer what subject you love, they ask about it and give them to the point and direct answe no babbling.

Diploma Trainee Engineer Interview Questions asked at other Companies

Q1. Wich of the following laws states that: in any electrical network the algebraic sum of the current meeting at a poin is zero ?
View answer (9)
Interview experience
3
Average
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
No response

I was interviewed before Jul 2023.

Round 1 - Coding Test 

You need to prepare for interview based on Job Description

Round 2 - HR 

(2 Questions)

  • Q1. What are your Strengths?
  • Ans. 

    My strengths include strong problem-solving skills, excellent communication, and a passion for learning new technologies.

    • Strong problem-solving skills - I enjoy tackling complex technical challenges and finding innovative solutions.

    • Excellent communication - I can effectively communicate with team members, stakeholders, and clients to ensure project success.

    • Passion for learning new technologies - I am always eager to ex...

  • Answered by AI
  • Q2. What are your weeknesses?
  • Ans. 

    One of my weaknesses is that I can be overly critical of my own work, which can sometimes lead to perfectionism.

    • I tend to be a perfectionist and can spend too much time on a task to ensure it is flawless.

    • I have difficulty delegating tasks to others because I want to make sure they are done correctly.

    • I can be overly self-critical, which can affect my confidence in certain situations.

  • Answered by AI

Senior Software Engineer Interview Questions asked at other Companies

Q1. Nth Prime Number Problem Statement Find the Nth prime number given a number N. Explanation: A prime number is greater than 1 and is not the product of two smaller natural numbers. A prime number has exactly two distinct positive divisors: 1... read more
View answer (1)

L&T Heavy Civil Infrastructure interview questions for popular designations

 Civil Site Engineer

 (3)

 Graduate Engineer Trainee (Get)

 (2)

 Mechanical Foreman

 (2)

 Assistant Construction Manager

 (1)

 Civil Engineer

 (1)

 Civil Site Supervisor

 (1)

 Civil Supervisor

 (1)

 Construction Manager Civil

 (1)

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
No response

I applied via Company Website and was interviewed before Feb 2023. There was 1 interview round.

Round 1 - HR 

(3 Questions)

  • Q1. Salary expectation n experience
  • Ans. My previous salary n expected ctc
  • Answered Anonymously
  • Q2. Joining time n notice period
  • Q3. Location n relocation

Interview Preparation Tips

Topics to prepare for L&T Heavy Civil Infrastructure Civil Site Engineer interview:
  • Civil Engineering
  • Work management
Interview preparation tips for other job seekers - Speak frankly and honestly

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (65)

Get interview-ready with Top L&T Heavy Civil Infrastructure Interview Questions

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via campus placement at National Institute of Construction Management and Research, Pune and was interviewed before Mar 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Aptitude Test 

General aptitude questions were asked.

Round 3 - One-on-one 

(2 Questions)

  • Q1. Related to our group project,thesis.
  • Q2. They asked me about my internship. And question based on my qualifications
  • Ans. Basics of civil engineer and basics of project management.
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare your project work.
Learning from traning/internships.

Post Graduate Engineer Trainee Interview Questions asked at other Companies

Q1. 1.Max deflection of a beam subject to fixed support in one end and flexible support on other end.. 2.Explain yield point..why u consider lower yield point for design.
View answer (1)

Interview Questionnaire 

2 Questions

  • Q1. Only for site work questions
  • Q2. Taxyway bed prapetion

Interview Preparation Tips

Interview preparation tips for other job seekers - No advice

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (65)

Trainee Interview Questions & Answers

user image Anonymous

posted on 16 Jul 2021

I applied via Campus Placement and was interviewed in Jan 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Questions about Internship done

Interview Preparation Tips

Interview preparation tips for other job seekers - Go through all the subjects thoroughly once before the interview

Trainee Interview Questions asked at other Companies

Q1. Ques1: There is a big file of words which is dynamically changing. We are continuously adding some words into it. How would you keep track of top 10 trending words at each moment? Ques2:Write a function that returns the length of the longes... read more
View answer (2)

I applied via Walk-in and was interviewed before Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. How to check worker productive?
  • Ans. 

    To check worker productivity, monitor their output, track their progress, and evaluate their efficiency.

    • Monitor the quantity and quality of work completed by each worker.

    • Track the progress of tasks assigned to workers and compare it with the set deadlines.

    • Evaluate the efficiency of workers by analyzing their work methods and time management.

    • Use performance metrics and key performance indicators (KPIs) to measure produc...

  • Answered by AI
  • Q2. How to maintain Safty in height of work?
  • Ans. 

    Safety in height of work can be maintained by following safety protocols and using proper equipment.

    • Ensure workers are trained in safety procedures

    • Use proper safety equipment such as harnesses and helmets

    • Regularly inspect equipment and scaffolding

    • Implement a safety plan and enforce it strictly

    • Provide adequate lighting and signage

    • Monitor weather conditions and adjust work accordingly

  • Answered by AI
  • Q3. What are formalities before concrete to be check?
  • Ans. 

    Formalities before concrete to be checked

    • Ensure proper reinforcement is in place

    • Check for proper formwork and its alignment

    • Verify the mix design and slump of concrete

    • Ensure proper curing measures are in place

    • Check for any obstructions or debris in the concrete placement area

  • Answered by AI
  • Q4. De shuttering period of shuttering activities?
  • Ans. 

    De-shuttering period depends on various factors such as type of concrete, temperature, humidity, and strength required.

    • De-shuttering period is the time taken to remove the formwork or shuttering from the concrete after it has been poured.

    • The period varies depending on the type of concrete used, temperature, humidity, and strength required.

    • For example, for normal concrete, the de-shuttering period is usually 14-21 days,...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Body language is most important and prepare Minumum quality test and procedure

Assistant Construction Manager Interview Questions asked at other Companies

Q1. In a Case, If 12mm dia rebar in your drawing and spacing is 150 mm. In case you are not having it at that time and you have to change it with 16 mm. what would be the spacing according 16 mm dia rebar?
View answer (2)

I applied via Company Website and was interviewed before Jan 2020. There were 5 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. What difference between 2D &3 D
  • Ans. 

    2D is flat, 3D has depth and volume

    • 2D is two-dimensional, with only length and width

    • 3D is three-dimensional, with length, width, and depth

    • 2D is commonly used for drawings, while 3D is used for modeling and animation

    • Examples of 2D include photographs and paintings, while examples of 3D include sculptures and video games

  • Answered by AI
  • Q2. 2d Shown 2 direction dimensins & 3d shown 3 direction dimensions
  • Ans. 

    2d and 3d dimensions differ in the number of directions shown.

    • 2d dimensions show two directions, typically x and y.

    • 3d dimensions show three directions, typically x, y, and z.

    • 2d drawings are often used for floor plans and elevations, while 3d models are used for visualizing complex structures.

    • 2d dimensions are often used in engineering and architecture, while 3d dimensions are used in fields such as video game design an

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - No majority fond in interview

Mechanical Foreman Interview Questions asked at other Companies

Q1. Will you be able to manage confined space activities?? What are the hazards and how will you mitigate them?
View answer (2)

L&T Heavy Civil Infrastructure Interview FAQs

How many rounds are there in L&T Heavy Civil Infrastructure interview?
L&T Heavy Civil Infrastructure interview process usually has 2-3 rounds. The most common rounds in the L&T Heavy Civil Infrastructure interview process are Technical, Resume Shortlist and Aptitude Test.
What are the top questions asked in L&T Heavy Civil Infrastructure interview?

Some of the top questions asked at the L&T Heavy Civil Infrastructure interview -

  1. How to find out bbs , rebar weight find out & scra...read more
  2. How to find out sttirups bend degree How to culculate length of cutting & ben...read more
  3. 2d Shown 2 direction dimensins & 3d shown 3 direction dimensi...read more
How long is the L&T Heavy Civil Infrastructure interview process?

The duration of L&T Heavy Civil Infrastructure interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

L&T Heavy Civil Infrastructure Interview Process

based on 15 interviews

Interview experience

4.3
  
Good
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 422 Interviews
GMR Group Interview Questions
4.1
 • 80 Interviews
GAMMON INDIA Interview Questions
3.8
 • 29 Interviews
Essar Group Interview Questions
3.7
 • 28 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

L&T Heavy Civil Infrastructure Reviews and Ratings

based on 228 reviews

4.3/5

Rating in categories

4.2

Skill development

3.5

Work-life balance

4.0

Salary

4.2

Job security

4.0

Company culture

3.8

Promotions

4.0

Work satisfaction

Explore 228 Reviews and Ratings
Assistant Manager
46 salaries
unlock blur

₹5.8 L/yr - ₹12.5 L/yr

Senior Engineer
36 salaries
unlock blur

₹3.3 L/yr - ₹8.5 L/yr

QA QC Engineer
25 salaries
unlock blur

₹3 L/yr - ₹8 L/yr

Assistant Construction Manager
21 salaries
unlock blur

₹6 L/yr - ₹15 L/yr

Safety Supervisor
21 salaries
unlock blur

₹2 L/yr - ₹4.5 L/yr

Explore more salaries
Compare L&T Heavy Civil Infrastructure with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview