I applied via Approached by Company and was interviewed in Jul 2022. There was 1 interview round.
I applied via L&T and was interviewed in Oct 2022. There were 3 interview rounds.
What is Concrete .and it's type
The initial time of settlement of concrete is typically 24-48 hours.
The initial time of settlement refers to the time it takes for the concrete to begin to harden and set.
Factors that can affect the initial time of settlement include temperature, humidity, and the mix design of the concrete.
It is important to allow the concrete to settle properly before any further construction work is done on top of it.
Typically, the ...
Initial setting time of cement is the time taken by cement to harden and attain a particular strength.
Initial setting time is the time taken by cement to harden and attain a particular strength.
It is the time from the moment water is added to the cement until the paste starts losing its plasticity.
The initial setting time of cement is generally around 30 minutes to 1 hour.
It is an important property of cement as it det...
I applied via Campus Placement and was interviewed before Jan 2022. There were 3 interview rounds.
You can pass if you prepare for ssc exam, but question level a bit tougher
2 stroke engines have simpler design but less efficient than 4 stroke engines. Pistons are made of aluminum alloy for light weight.
2 stroke engines have only two strokes (intake/compression and power/exhaust) while 4 stroke engines have four strokes (intake, compression, power, and exhaust).
2 stroke engines have simpler design and are lighter but less efficient than 4 stroke engines.
Pistons are made of aluminum alloy f...
The question is about types of beams and advantages, and the height of a cycle tire.
Types of beams include cantilever, simply supported, fixed, and continuous beams.
Advantages of beams include their ability to support weight and distribute loads evenly.
The height of a cycle tire varies depending on the type of bike and the size of the tire.
For example, a road bike tire may have a height of 23mm, while a mountain bike t
I was interviewed before Jul 2023.
You need to prepare for interview based on Job Description
My strengths include strong problem-solving skills, excellent communication, and a passion for learning new technologies.
Strong problem-solving skills - I enjoy tackling complex technical challenges and finding innovative solutions.
Excellent communication - I can effectively communicate with team members, stakeholders, and clients to ensure project success.
Passion for learning new technologies - I am always eager to ex...
One of my weaknesses is that I can be overly critical of my own work, which can sometimes lead to perfectionism.
I tend to be a perfectionist and can spend too much time on a task to ensure it is flawless.
I have difficulty delegating tasks to others because I want to make sure they are done correctly.
I can be overly self-critical, which can affect my confidence in certain situations.
L&T Heavy Civil Infrastructure interview questions for popular designations
I applied via Company Website and was interviewed before Feb 2023. There was 1 interview round.
Get interview-ready with Top L&T Heavy Civil Infrastructure Interview Questions
I applied via campus placement at National Institute of Construction Management and Research, Pune and was interviewed before Mar 2022. There were 3 interview rounds.
General aptitude questions were asked.
I applied via Campus Placement and was interviewed in Jan 2021. There were 4 interview rounds.
I applied via Walk-in and was interviewed before Nov 2020. There were 3 interview rounds.
To check worker productivity, monitor their output, track their progress, and evaluate their efficiency.
Monitor the quantity and quality of work completed by each worker.
Track the progress of tasks assigned to workers and compare it with the set deadlines.
Evaluate the efficiency of workers by analyzing their work methods and time management.
Use performance metrics and key performance indicators (KPIs) to measure produc...
Safety in height of work can be maintained by following safety protocols and using proper equipment.
Ensure workers are trained in safety procedures
Use proper safety equipment such as harnesses and helmets
Regularly inspect equipment and scaffolding
Implement a safety plan and enforce it strictly
Provide adequate lighting and signage
Monitor weather conditions and adjust work accordingly
Formalities before concrete to be checked
Ensure proper reinforcement is in place
Check for proper formwork and its alignment
Verify the mix design and slump of concrete
Ensure proper curing measures are in place
Check for any obstructions or debris in the concrete placement area
De-shuttering period depends on various factors such as type of concrete, temperature, humidity, and strength required.
De-shuttering period is the time taken to remove the formwork or shuttering from the concrete after it has been poured.
The period varies depending on the type of concrete used, temperature, humidity, and strength required.
For example, for normal concrete, the de-shuttering period is usually 14-21 days,...
I applied via Company Website and was interviewed before Jan 2020. There were 5 interview rounds.
2D is flat, 3D has depth and volume
2D is two-dimensional, with only length and width
3D is three-dimensional, with length, width, and depth
2D is commonly used for drawings, while 3D is used for modeling and animation
Examples of 2D include photographs and paintings, while examples of 3D include sculptures and video games
2d and 3d dimensions differ in the number of directions shown.
2d dimensions show two directions, typically x and y.
3d dimensions show three directions, typically x, y, and z.
2d drawings are often used for floor plans and elevations, while 3d models are used for visualizing complex structures.
2d dimensions are often used in engineering and architecture, while 3d dimensions are used in fields such as video game design an
Top trending discussions
Some of the top questions asked at the L&T Heavy Civil Infrastructure interview -
The duration of L&T Heavy Civil Infrastructure interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 15 interviews
Interview experience
based on 228 reviews
Rating in categories
Assistant Manager
46
salaries
| ₹5.8 L/yr - ₹12.5 L/yr |
Senior Engineer
36
salaries
| ₹3.3 L/yr - ₹8.5 L/yr |
QA QC Engineer
25
salaries
| ₹3 L/yr - ₹8 L/yr |
Assistant Construction Manager
21
salaries
| ₹6 L/yr - ₹15 L/yr |
Safety Supervisor
21
salaries
| ₹2 L/yr - ₹4.5 L/yr |
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company
GAMMON INDIA