I applied via L&T and was interviewed in Oct 2022. There were 3 interview rounds.
What is Concrete .and it's type
The initial time of settlement of concrete is typically 24-48 hours.
The initial time of settlement refers to the time it takes for the concrete to begin to harden and set.
Factors that can affect the initial time of settlement include temperature, humidity, and the mix design of the concrete.
It is important to allow the concrete to settle properly before any further construction work is done on top of it.
Typically, the ...
Initial setting time of cement is the time taken by cement to harden and attain a particular strength.
Initial setting time is the time taken by cement to harden and attain a particular strength.
It is the time from the moment water is added to the cement until the paste starts losing its plasticity.
The initial setting time of cement is generally around 30 minutes to 1 hour.
It is an important property of cement as it det...
Top trending discussions
I applied via Company Website and was interviewed in Aug 2020. There was 1 interview round.
If casing gets trapped after concreting, I would follow these steps to resolve the issue.
Assess the situation and determine the cause of the casing getting trapped
If the casing is stuck due to concrete hardening, try to break the concrete around it using appropriate tools
If breaking the concrete is not feasible, consider using a hydraulic jack to push the casing out
Consult with experienced professionals or engineers fo...
I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.
posted on 19 Feb 2021
I applied via Walk-in and was interviewed in Sep 2020. There was 1 interview round.
posted on 28 Feb 2022
posted on 14 Nov 2023
I applied via Naukri.com
J.kumar metro project is a major infrastructure project involving construction of metro rail system.
J.kumar metro project is a large-scale infrastructure project focused on building a metro rail system.
The project involves various stages such as planning, design, construction, and implementation.
It may include tasks like excavation, tunneling, track laying, station construction, etc.
The project requires coordination wi...
Site engineering plays a crucial role in construction by overseeing the planning, design, and execution of projects.
Site engineers are responsible for surveying the construction site and preparing detailed plans and layouts.
They collaborate with architects and contractors to ensure that the project meets all specifications and regulations.
Site engineers supervise the construction process, monitor progress, and resolve ...
Site execution involves the implementation of construction plans and managing the construction process on-site.
Site execution includes activities such as earthwork, foundation construction, structural work, and finishing work.
It involves coordinating with various stakeholders, including architects, contractors, and suppliers.
Ensuring compliance with building codes, safety regulations, and quality standards is crucial d...
I applied via Recruitment Consulltant
BBS Billing Quality is crucial for accurate project cost estimation and tracking.
BBS (Bar Bending Schedule) should be accurate and detailed to ensure correct quantity take-offs.
Quality control measures should be in place to verify the accuracy of BBS.
Regular audits and checks should be conducted to ensure billing quality.
Inaccurate BBS can lead to cost overruns and delays in project completion.
I applied via Company Website
I am a Civil Site Engineer with experience in managing construction projects and ensuring their successful completion.
I have a Bachelor's degree in Civil Engineering from XYZ University.
I have worked on various construction projects, including residential and commercial buildings.
I am proficient in using AutoCAD and other design software.
I have strong project management skills and can effectively coordinate with contra...
Safety equipment is used on construction sites to protect workers from potential hazards and accidents.
Personal protective equipment (PPE) such as hard hats, safety glasses, and gloves
Safety harnesses and fall protection systems for working at heights
Earplugs or earmuffs to protect against loud noises
Respirators or masks for protection against dust, fumes, or hazardous substances
Safety signs and barricades to warn and ...
Standards for plant layout in civil engineering include OSHA regulations, industry best practices, and client requirements.
OSHA regulations set guidelines for safety in plant layout design
Industry best practices ensure efficient use of space and resources
Client requirements may include specific equipment placement or workflow needs
In case of shortage of material received, we can take the following actions:
Contact the supplier to inquire about the shortage and request immediate delivery of the remaining material.
Check if there are any alternative suppliers who can provide the required material.
Evaluate the possibility of using substitute materials or adjusting the design to accommodate the shortage.
Prioritize the use of available material for cri...
based on 1 interview
Interview experience
Assistant Manager
46
salaries
| ₹5.8 L/yr - ₹12.5 L/yr |
Senior Engineer
36
salaries
| ₹3.3 L/yr - ₹8.5 L/yr |
QA QC Engineer
22
salaries
| ₹3 L/yr - ₹9.2 L/yr |
Assistant Construction Manager
21
salaries
| ₹6 L/yr - ₹15 L/yr |
Safety Supervisor
21
salaries
| ₹2 L/yr - ₹4.5 L/yr |
Tata Projects
Shapoorji Pallonji Group
Kalpataru Projects International
Nagarjuna Construction Company