I applied via L&T and was interviewed in Oct 2022. There were 3 interview rounds.
What is Concrete .and it's type
The initial time of settlement of concrete is typically 24-48 hours.
The initial time of settlement refers to the time it takes for the concrete to begin to harden and set.
Factors that can affect the initial time of settlement include temperature, humidity, and the mix design of the concrete.
It is important to allow the concrete to settle properly before any further construction work is done on top of it.
Typically, the ...
Initial setting time of cement is the time taken by cement to harden and attain a particular strength.
Initial setting time is the time taken by cement to harden and attain a particular strength.
It is the time from the moment water is added to the cement until the paste starts losing its plasticity.
The initial setting time of cement is generally around 30 minutes to 1 hour.
It is an important property of cement as it det...
Top trending discussions
posted on 18 Aug 2024
M25 ratio is the mix design ratio for concrete which specifies the ratio of cement, sand, and aggregate.
M25 ratio is commonly used in construction for high-strength concrete.
The ratio represents the mix of cement, sand, and aggregate in the concrete mix.
For example, a common M25 mix ratio is 1:1:2, which means 1 part cement, 1 part sand, and 2 parts aggregate.
The length of a steel bar can vary depending on the specific project requirements and specifications.
The length of a steel bar is typically specified in the project drawings or specifications.
Common lengths for steel bars include 20 feet, 30 feet, and 40 feet.
Steel bars can also be custom cut to specific lengths as needed for the project.
I applied via Company Website and was interviewed in Oct 2023. There were 2 interview rounds.
I have 8 years of experience as a Civil Site Supervisor.
I have 8 years of experience in managing and supervising civil construction projects.
During my tenure, I have successfully completed multiple projects on time and within budget.
I have extensive knowledge of site operations, quality control, and safety regulations.
I have effectively managed teams of subcontractors and ensured smooth coordination between different s...
I work as a Civil Site Supervisor at XYZ Construction Company.
I work at XYZ Construction Company as a Civil Site Supervisor.
Currently, I am employed as a Civil Site Supervisor at XYZ Construction Company.
My workplace is XYZ Construction Company where I serve as a Civil Site Supervisor.
I am unable to provide my salary information at this time.
Salary information is confidential and should not be disclosed during an interview.
It is best to focus on discussing qualifications, experience, and skills relevant to the position.
Salary negotiations can be done at a later stage if an offer is extended.
posted on 10 Apr 2024
I applied via Newspaper Ad and was interviewed before Apr 2023. There was 1 interview round.
ABC Construction Company
ABC Construction Company specializes in civil engineering projects
The company has completed projects such as road construction, bridge building, and land development
ABC Construction Company has a strong reputation for delivering high-quality work on time and within budget
posted on 18 Jun 2022
I applied via Job Portal and was interviewed in May 2022. There were 2 interview rounds.
posted on 13 Feb 2022
I applied via Naukri.com and was interviewed in Jan 2022. There were 2 interview rounds.
posted on 20 Oct 2024
I applied via Walk-in and was interviewed in Sep 2024. There were 2 interview rounds.
The goal of an aptitude test is to predict the ability to learn new skills
I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.
I applied via Walk-in and was interviewed in Jun 2024. There were 4 interview rounds.
posted on 12 Jun 2024
Initial setting time of concrete is the time taken for the concrete to change from a plastic to a solid state.
Initial setting time is typically around 30 minutes to 1.5 hours, depending on the mix design and environmental conditions.
It is important to monitor the initial setting time to ensure proper placement and finishing of the concrete.
Factors affecting initial setting time include temperature, water-cement ratio, ...
based on 1 interview
Interview experience
Assistant Manager
46
salaries
| ₹5.8 L/yr - ₹12.5 L/yr |
Senior Engineer
36
salaries
| ₹3.3 L/yr - ₹8.5 L/yr |
QA QC Engineer
25
salaries
| ₹3 L/yr - ₹8 L/yr |
Assistant Construction Manager
21
salaries
| ₹6 L/yr - ₹15 L/yr |
Safety Supervisor
21
salaries
| ₹2 L/yr - ₹4.5 L/yr |
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company
GAMMON INDIA