I applied via Walk-in and was interviewed before Nov 2020. There were 3 interview rounds.
To check worker productivity, monitor their output, track their progress, and evaluate their efficiency.
Monitor the quantity and quality of work completed by each worker.
Track the progress of tasks assigned to workers and compare it with the set deadlines.
Evaluate the efficiency of workers by analyzing their work methods and time management.
Use performance metrics and key performance indicators (KPIs) to measure produc...
Safety in height of work can be maintained by following safety protocols and using proper equipment.
Ensure workers are trained in safety procedures
Use proper safety equipment such as harnesses and helmets
Regularly inspect equipment and scaffolding
Implement a safety plan and enforce it strictly
Provide adequate lighting and signage
Monitor weather conditions and adjust work accordingly
Formalities before concrete to be checked
Ensure proper reinforcement is in place
Check for proper formwork and its alignment
Verify the mix design and slump of concrete
Ensure proper curing measures are in place
Check for any obstructions or debris in the concrete placement area
De-shuttering period depends on various factors such as type of concrete, temperature, humidity, and strength required.
De-shuttering period is the time taken to remove the formwork or shuttering from the concrete after it has been poured.
The period varies depending on the type of concrete used, temperature, humidity, and strength required.
For example, for normal concrete, the de-shuttering period is usually 14-21 days,...
Top trending discussions
posted on 22 Apr 2022
I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jan 2021. There were 4 interview rounds.
Yes, I have experience in handling RVNL projects.
I have previously managed a similar railway project
I am familiar with the processes and regulations involved
I have a strong team to support me
I am confident in my ability to deliver the project on time and within budget
posted on 16 May 2021
I applied via Naukri.com and was interviewed before May 2020. There were 3 interview rounds.
I can join within two weeks.
I am currently serving a two-week notice period at my current job.
I have already completed all necessary paperwork and background checks.
I am ready to start as soon as possible.
I can adjust my start date based on the company's requirements.
I left my last company to pursue new opportunities and challenges.
Seeking growth and advancement in my career
Looking for a company with a better cultural fit
Wanting to broaden my skill set
Desire for a higher level of responsibility
Company downsizing or restructuring
I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.
It was just a aptitude test
Managed a team to implement a new customer relationship management system
Led a team of 5 employees to successfully implement a new CRM system
Coordinated with IT department to ensure smooth integration of the system
Provided training to staff on how to use the new system effectively
I want to join the firm because of its strong reputation, opportunities for growth, and alignment with my career goals.
Strong reputation in the industry
Opportunities for career growth and development
Alignment with my career goals and values
I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.
HRG stands for Human Resource Group while LRG stands for Large Retail Group.
HRG focuses on managing human resources within an organization
LRG focuses on managing a large retail business
HRG deals with employee relations, recruitment, training, and development
LRG deals with sales, inventory management, customer service, and marketing
Transformer sizing involves calculating the appropriate size of a transformer based on load requirements.
Determine the total load requirements in kVA
Consider the load factor and diversity factor
Calculate the transformer size based on the total load requirements
Ensure the transformer is rated for the appropriate voltage and frequency
Consult with a professional engineer if needed
based on 1 interview
Interview experience
based on 7 reviews
Rating in categories
Assistant Manager
46
salaries
| ₹5.8 L/yr - ₹12.5 L/yr |
Senior Engineer
36
salaries
| ₹3.3 L/yr - ₹8.5 L/yr |
QA QC Engineer
22
salaries
| ₹3 L/yr - ₹9.2 L/yr |
Assistant Construction Manager
21
salaries
| ₹6 L/yr - ₹15 L/yr |
Safety Supervisor
21
salaries
| ₹2 L/yr - ₹4.5 L/yr |
Tata Projects
Shapoorji Pallonji Group
Kalpataru Projects International
Nagarjuna Construction Company