I applied via Walk-in and was interviewed before Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. How to check worker productive?
  • Ans. 

    To check worker productivity, monitor their output, track their progress, and evaluate their efficiency.

    • Monitor the quantity and quality of work completed by each worker.

    • Track the progress of tasks assigned to workers and compare it with the set deadlines.

    • Evaluate the efficiency of workers by analyzing their work methods and time management.

    • Use performance metrics and key performance indicators (KPIs) to measure produc...

  • Answered by AI
  • Q2. How to maintain Safty in height of work?
  • Ans. 

    Safety in height of work can be maintained by following safety protocols and using proper equipment.

    • Ensure workers are trained in safety procedures

    • Use proper safety equipment such as harnesses and helmets

    • Regularly inspect equipment and scaffolding

    • Implement a safety plan and enforce it strictly

    • Provide adequate lighting and signage

    • Monitor weather conditions and adjust work accordingly

  • Answered by AI
  • Q3. What are formalities before concrete to be check?
  • Ans. 

    Formalities before concrete to be checked

    • Ensure proper reinforcement is in place

    • Check for proper formwork and its alignment

    • Verify the mix design and slump of concrete

    • Ensure proper curing measures are in place

    • Check for any obstructions or debris in the concrete placement area

  • Answered by AI
  • Q4. De shuttering period of shuttering activities?
  • Ans. 

    De-shuttering period depends on various factors such as type of concrete, temperature, humidity, and strength required.

    • De-shuttering period is the time taken to remove the formwork or shuttering from the concrete after it has been poured.

    • The period varies depending on the type of concrete used, temperature, humidity, and strength required.

    • For example, for normal concrete, the de-shuttering period is usually 14-21 days,...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Body language is most important and prepare Minumum quality test and procedure

Interview questions from similar companies

I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. NEUTRAL AXIS IN RCC STRUCTURE
  • Ans. 

    The neutral axis is the line where the stress is zero in a reinforced concrete structure.

    • The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.

    • The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.

    • The position of the neutral axis affects the amount of reinforcement required in the tension zone.

    • The n...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - GRT TO WORK WITH THIS COMPANY

I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Interviewer asked me about last activity process , material quality, more technical questions, and cost analysis of last projects.

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majority a stress test.it lasted about 1hr 45 minutes.i tried to answer every question with example.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. System implementation process
  • Ans. 

    System implementation process involves planning, designing, testing, and deploying new software or hardware systems.

    • Planning phase involves defining project scope, setting goals, and creating a timeline.

    • Design phase includes creating system architecture, database design, and user interface.

    • Testing phase involves conducting various tests to ensure system functionality and performance.

    • Deployment phase includes installing...

  • Answered by AI
  • Q2. Role and responsibilities to monitor performance.
  • Ans. 

    Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.

    • Set clear performance expectations for team members

    • Provide regular feedback on performance

    • Track progress towards goals and objectives

    • Address any performance issues promptly and constructively

  • Answered by AI

I applied via Walk-in and was interviewed in Nov 2021. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Erection plan,ASME B 31.3,
  • Q2. Fitup ,fittings,valve
  • Q3. Isoclearance,Mechanical clearance

Interview Preparation Tips

Interview preparation tips for other job seekers - Follow your CV ,and dont overconfidant
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. Pile foundation Pile Cap BBBS
Round 3 - HR 

(1 Question)

  • Q1. Salary Negotiable
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be honest with your years of experience. All information you share will be verified at the time of joining.
View all Resume tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Material Producer's
  • Q2. Matrial Management
Round 3 - One-on-one 

(1 Question)

  • Q1. Final round is taken Functional head Management skill Questions
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. D-Wall. Site Executive
Round 2 - Technical 

(1 Question)

  • Q1. Under ground metro construction process
  • Ans. 

    Underground metro construction involves excavation, tunneling, station construction, and track installation.

    • Excavation of tunnels using tunnel boring machines or cut-and-cover method

    • Station construction including platform, concourse, and entrance structures

    • Installation of tracks, signaling systems, and electrical components

    • Ventilation and emergency exit construction for safety measures

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. About technical experience
  • Q2. About self Introduction

Interview Preparation Tips

Topics to prepare for Tata Projects Assistant Manager interview:
  • Concrete Technology
  • Highways
Interview preparation tips for other job seekers - Experience in practical is the prior.

Interview Questionnaire 

3 Questions

  • Q1. Related to railway electrification
  • Ans. Having experience in both metro and railways project
  • Answered by Manish Kumar Singh
  • Q2. What type of testing we perform in TSS
  • Ans. 

    TSS performs various types of testing including functional, regression, performance, and security testing.

    • Functional testing ensures that the software meets the specified requirements.

    • Regression testing ensures that changes made to the software do not introduce new defects.

    • Performance testing checks the software's speed, scalability, and stability under various loads.

    • Security testing checks the software's vulnerability...

  • Answered by AI
  • Q3. We perform specific testing for specific equipment, Meger for all except LA

Interview Preparation Tips

Interview preparation tips for other job seekers - Financial crunch phase running out in this company , hr policy is good

Skills evaluated in this interview

Contribute & help others!
anonymous
You can choose to be anonymous

L&T Heavy Civil Infrastructure Interview FAQs

What are the top questions asked in L&T Heavy Civil Infrastructure Assistant Construction Manager interview?

Some of the top questions asked at the L&T Heavy Civil Infrastructure Assistant Construction Manager interview -

  1. How to maintain Safty in height of wor...read more
  2. What are formalities before concrete to be chec...read more
  3. How to check worker productiv...read more

Recently Viewed

INTERVIEWS

Hi Tech Projects

No Interviews

INTERVIEWS

Hi Tech Projects

No Interviews

CAMPUS PLACEMENT

Nandha Engineering College, Erode

INTERVIEWS

Ksolves India Limited

No Interviews

INTERVIEWS

Hi Tech Projects

No Interviews

INTERVIEWS

L&T Heavy Civil Infrastructure

No Interviews

INTERVIEWS

MulticoreWare

No Interviews

INTERVIEWS

UPL

5.6k top interview questions

INTERVIEWS

Ksolves India Limited

No Interviews

INTERVIEWS

MulticoreWare

No Interviews

Tell us how to improve this page.

L&T Heavy Civil Infrastructure Assistant Construction Manager Interview Process

based on 1 interview

Interview experience

2
  
Poor
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 422 Interviews
KEC International Interview Questions
4.0
 • 296 Interviews
TCE Interview Questions
3.8
 • 246 Interviews
Saint-Gobain Interview Questions
4.0
 • 172 Interviews
Worley Interview Questions
4.2
 • 109 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
View all
18% less than the average Assistant Construction Manager Salary in India
View more details

L&T Heavy Civil Infrastructure Assistant Construction Manager Reviews and Ratings

based on 7 reviews

4.1/5

Rating in categories

3.5

Skill development

2.8

Work-life balance

4.4

Salary

4.2

Job security

3.4

Company culture

3.2

Promotions

3.9

Work satisfaction

Explore 7 Reviews and Ratings
Assistant Manager
46 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
36 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

QA QC Engineer
23 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Construction Manager
21 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Safety Supervisor
21 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare L&T Heavy Civil Infrastructure with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview