I applied via Walk-in and was interviewed before Nov 2020. There were 3 interview rounds.
To check worker productivity, monitor their output, track their progress, and evaluate their efficiency.
Monitor the quantity and quality of work completed by each worker.
Track the progress of tasks assigned to workers and compare it with the set deadlines.
Evaluate the efficiency of workers by analyzing their work methods and time management.
Use performance metrics and key performance indicators (KPIs) to measure produc...
Safety in height of work can be maintained by following safety protocols and using proper equipment.
Ensure workers are trained in safety procedures
Use proper safety equipment such as harnesses and helmets
Regularly inspect equipment and scaffolding
Implement a safety plan and enforce it strictly
Provide adequate lighting and signage
Monitor weather conditions and adjust work accordingly
Formalities before concrete to be checked
Ensure proper reinforcement is in place
Check for proper formwork and its alignment
Verify the mix design and slump of concrete
Ensure proper curing measures are in place
Check for any obstructions or debris in the concrete placement area
De-shuttering period depends on various factors such as type of concrete, temperature, humidity, and strength required.
De-shuttering period is the time taken to remove the formwork or shuttering from the concrete after it has been poured.
The period varies depending on the type of concrete used, temperature, humidity, and strength required.
For example, for normal concrete, the de-shuttering period is usually 14-21 days,...
Top trending discussions
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
posted on 6 Oct 2021
I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
posted on 22 Dec 2021
I applied via Walk-in and was interviewed in Nov 2021. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Oct 2022. There were 3 interview rounds.
posted on 23 Feb 2024
I applied via Walk-in and was interviewed in Aug 2023. There were 2 interview rounds.
Underground metro construction involves excavation, tunneling, station construction, and track installation.
Excavation of tunnels using tunnel boring machines or cut-and-cover method
Station construction including platform, concourse, and entrance structures
Installation of tracks, signaling systems, and electrical components
Ventilation and emergency exit construction for safety measures
I applied via Naukri.com and was interviewed in Aug 2024. There was 1 interview round.
TSS performs various types of testing including functional, regression, performance, and security testing.
Functional testing ensures that the software meets the specified requirements.
Regression testing ensures that changes made to the software do not introduce new defects.
Performance testing checks the software's speed, scalability, and stability under various loads.
Security testing checks the software's vulnerability...
based on 1 interview
Interview experience
based on 7 reviews
Rating in categories
Assistant Manager
46
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
36
salaries
| ₹0 L/yr - ₹0 L/yr |
QA QC Engineer
23
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Construction Manager
21
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Supervisor
21
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company
GAMMON INDIA