Upload Button Icon Add office photos

Filter interviews by

L&T Heavy Civil Infrastructure Assistant Construction Manager Interview Questions, Process, and Tips

Updated 11 Nov 2021

L&T Heavy Civil Infrastructure Assistant Construction Manager Interview Experiences

1 interview found

I applied via Walk-in and was interviewed before Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. How to check worker productive?
  • Ans. 

    To check worker productivity, monitor their output, track their progress, and evaluate their efficiency.

    • Monitor the quantity and quality of work completed by each worker.

    • Track the progress of tasks assigned to workers and compare it with the set deadlines.

    • Evaluate the efficiency of workers by analyzing their work methods and time management.

    • Use performance metrics and key performance indicators (KPIs) to measure produc...

  • Answered by AI
  • Q2. How to maintain Safty in height of work?
  • Ans. 

    Safety in height of work can be maintained by following safety protocols and using proper equipment.

    • Ensure workers are trained in safety procedures

    • Use proper safety equipment such as harnesses and helmets

    • Regularly inspect equipment and scaffolding

    • Implement a safety plan and enforce it strictly

    • Provide adequate lighting and signage

    • Monitor weather conditions and adjust work accordingly

  • Answered by AI
  • Q3. What are formalities before concrete to be check?
  • Ans. 

    Formalities before concrete to be checked

    • Ensure proper reinforcement is in place

    • Check for proper formwork and its alignment

    • Verify the mix design and slump of concrete

    • Ensure proper curing measures are in place

    • Check for any obstructions or debris in the concrete placement area

  • Answered by AI
  • Q4. De shuttering period of shuttering activities?
  • Ans. 

    De-shuttering period depends on various factors such as type of concrete, temperature, humidity, and strength required.

    • De-shuttering period is the time taken to remove the formwork or shuttering from the concrete after it has been poured.

    • The period varies depending on the type of concrete used, temperature, humidity, and strength required.

    • For example, for normal concrete, the de-shuttering period is usually 14-21 days,...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Body language is most important and prepare Minumum quality test and procedure

Interview questions from similar companies

I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Technical questions, and previous company experience
Round 3 - One-on-one 

(7 Questions)

  • Q1. Technical questions, previous company experience
  • Q2. Concrete grade, site management
  • Q3. Site execution questions
  • Q4. Shuttering , reinforcement questions
  • Q5. Concrete grades ,qty taken
  • Q6. Finishing works Tiles ,granite plastering
  • Q7. Block work and finishing works

Interview Preparation Tips

Interview preparation tips for other job seekers - Improve technical knowledge and site management

I applied via Naukri.com and was interviewed in Jan 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Previous Project experience. Execution plan, Job responsibility, Technical for Electrical SLD, Chiller SLD, Functional test for all MEP items.

Interview Preparation Tips

Interview preparation tips for other job seekers - Try to give correct answer, What you have mentioned in your CV the same question will be raise from Technical Board...

Interview Questionnaire 

3 Questions

  • Q1. Tell me about your experience and ur self like education etc
  • Q2. What do you work in your profile.
  • Q3. Can you handle RVNL project
  • Ans. 

    Yes, I have experience in handling RVNL projects.

    • I have previously managed a similar railway project

    • I am familiar with the processes and regulations involved

    • I have a strong team to support me

    • I am confident in my ability to deliver the project on time and within budget

  • Answered by AI

I applied via Naukri.com and was interviewed before May 2020. There were 3 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. About planning scheduling costing budgeting of water supply projects
  • Q2. How soon can you join
  • Ans. 

    I can join within two weeks.

    • I am currently serving a two-week notice period at my current job.

    • I have already completed all necessary paperwork and background checks.

    • I am ready to start as soon as possible.

    • I can adjust my start date based on the company's requirements.

  • Answered by AI
  • Q3. Process of recruitment is too lengthy
  • Q4. Three rounds conducted
  • Q5. Why did you left last company
  • Ans. 

    I left my last company to pursue new opportunities and challenges.

    • Seeking growth and advancement in my career

    • Looking for a company with a better cultural fit

    • Wanting to broaden my skill set

    • Desire for a higher level of responsibility

    • Company downsizing or restructuring

  • Answered by AI
  • Q6. Relation with previous bosses

Interview Preparation Tips

Interview preparation tips for other job seekers - Answer very clearly honestly and politly

I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Equipment layout details
  • Q2. Plot plan details and man and material movement path

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge on piping system, thickness calculations and materials are required

Equipment layout preparation as per oisd 118 and plot plan knowledge required.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

It was just a aptitude test

Round 2 - Technical 

(2 Questions)

  • Q1. Basic regarding professional area
  • Q2. Project worked at and experienced
  • Ans. 

    Managed a team to implement a new customer relationship management system

    • Led a team of 5 employees to successfully implement a new CRM system

    • Coordinated with IT department to ensure smooth integration of the system

    • Provided training to staff on how to use the new system effectively

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Why i want to join the firm
  • Ans. 

    I want to join the firm because of its strong reputation, opportunities for growth, and alignment with my career goals.

    • Strong reputation in the industry

    • Opportunities for career growth and development

    • Alignment with my career goals and values

  • Answered by AI
  • Q2. Salary discussions

I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Excavation safety, EHS management, Lifting & Erection safety

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to explain basic concepts clearly
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Major difference between Hrg and Lrg?
  • Ans. 

    HRG stands for Human Resource Group while LRG stands for Large Retail Group.

    • HRG focuses on managing human resources within an organization

    • LRG focuses on managing a large retail business

    • HRG deals with employee relations, recruitment, training, and development

    • LRG deals with sales, inventory management, customer service, and marketing

  • Answered by AI
  • Q2. How to perform transformer sizing
  • Ans. 

    Transformer sizing involves calculating the appropriate size of a transformer based on load requirements.

    • Determine the total load requirements in kVA

    • Consider the load factor and diversity factor

    • Calculate the transformer size based on the total load requirements

    • Ensure the transformer is rated for the appropriate voltage and frequency

    • Consult with a professional engineer if needed

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Tell me about yourself
  • Q2. What you do daily
  • Q3. What is your package

L&T Heavy Civil Infrastructure Interview FAQs

What are the top questions asked in L&T Heavy Civil Infrastructure Assistant Construction Manager interview?

Some of the top questions asked at the L&T Heavy Civil Infrastructure Assistant Construction Manager interview -

  1. How to maintain Safty in height of wor...read more
  2. What are formalities before concrete to be chec...read more
  3. How to check worker productiv...read more

Tell us how to improve this page.

L&T Heavy Civil Infrastructure Assistant Construction Manager Interview Process

based on 1 interview

Interview experience

2
  
Poor
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 458 Interviews
KEC International Interview Questions
4.0
 • 317 Interviews
TCE Interview Questions
3.8
 • 251 Interviews
Saint-Gobain Interview Questions
4.0
 • 174 Interviews
Worley Interview Questions
4.1
 • 113 Interviews
View all
20% less than the average Assistant Construction Manager Salary in India
View more details

L&T Heavy Civil Infrastructure Assistant Construction Manager Reviews and Ratings

based on 7 reviews

4.1/5

Rating in categories

3.5

Skill development

2.8

Work-life balance

4.4

Salary

4.2

Job security

3.4

Company culture

3.2

Promotions

3.9

Work satisfaction

Explore 7 Reviews and Ratings
Assistant Manager
46 salaries
unlock blur

₹5.8 L/yr - ₹12.5 L/yr

Senior Engineer
36 salaries
unlock blur

₹3.3 L/yr - ₹8.5 L/yr

QA QC Engineer
22 salaries
unlock blur

₹3 L/yr - ₹9.2 L/yr

Assistant Construction Manager
21 salaries
unlock blur

₹6 L/yr - ₹15 L/yr

Safety Supervisor
21 salaries
unlock blur

₹2 L/yr - ₹4.5 L/yr

Explore more salaries
Compare L&T Heavy Civil Infrastructure with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Kalpataru Projects International

4.1
Compare

Nagarjuna Construction Company

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview