I applied via Walk-in and was interviewed before Nov 2020. There were 3 interview rounds.
To check worker productivity, monitor their output, track their progress, and evaluate their efficiency.
Monitor the quantity and quality of work completed by each worker.
Track the progress of tasks assigned to workers and compare it with the set deadlines.
Evaluate the efficiency of workers by analyzing their work methods and time management.
Use performance metrics and key performance indicators (KPIs) to measure produc...
Safety in height of work can be maintained by following safety protocols and using proper equipment.
Ensure workers are trained in safety procedures
Use proper safety equipment such as harnesses and helmets
Regularly inspect equipment and scaffolding
Implement a safety plan and enforce it strictly
Provide adequate lighting and signage
Monitor weather conditions and adjust work accordingly
Formalities before concrete to be checked
Ensure proper reinforcement is in place
Check for proper formwork and its alignment
Verify the mix design and slump of concrete
Ensure proper curing measures are in place
Check for any obstructions or debris in the concrete placement area
De-shuttering period depends on various factors such as type of concrete, temperature, humidity, and strength required.
De-shuttering period is the time taken to remove the formwork or shuttering from the concrete after it has been poured.
The period varies depending on the type of concrete used, temperature, humidity, and strength required.
For example, for normal concrete, the de-shuttering period is usually 14-21 days,...
Top trending discussions
posted on 23 Feb 2024
I applied via Walk-in and was interviewed in Aug 2023. There were 2 interview rounds.
Underground metro construction involves excavation, tunneling, station construction, and track installation.
Excavation of tunnels using tunnel boring machines or cut-and-cover method
Station construction including platform, concourse, and entrance structures
Installation of tracks, signaling systems, and electrical components
Ventilation and emergency exit construction for safety measures
posted on 23 Dec 2023
I applied via Walk-in and was interviewed in Nov 2023. There were 2 interview rounds.
Progress between job planning and target is monitored closely to ensure project stays on schedule.
Regularly track progress against the project schedule
Identify any delays or obstacles and address them promptly
Adjust the plan as needed to stay on track
Communicate with stakeholders about any changes or updates
Use project management software to help monitor progress
posted on 25 Jul 2024
I have experience working on various civil construction projects, taking on roles such as project manager, site supervisor, and quality control inspector.
Managed a team of construction workers and subcontractors to ensure project deadlines were met
Oversaw the quality of workmanship and materials used on site
Communicated regularly with clients, architects, and engineers to address any issues or changes in the project
Imp...
posted on 24 Oct 2024
It was easy sorting questions
posted on 21 Feb 2024
I applied via Walk-in and was interviewed before Feb 2023. There were 3 interview rounds.
Computer base test Technical & Reasoning questions
posted on 20 May 2023
I applied via Recruitment Consulltant and was interviewed in Apr 2023. There were 2 interview rounds.
The deadmen depth depends on the soil type and the load-bearing capacity of the soil.
Deadmen depth is the depth at which deadmen are installed to anchor retaining walls or other structures.
It is determined by the soil type and the load-bearing capacity of the soil.
For example, in sandy soil, the deadmen depth may need to be deeper than in clay soil.
The depth can also vary depending on the height and weight of the struc
posted on 22 Dec 2021
I applied via Walk-in and was interviewed in Nov 2021. There were 3 interview rounds.
posted on 18 Nov 2023
I applied via LinkedIn and was interviewed in May 2023. There were 4 interview rounds.
Genral aptitude test
I applied via Naukri.com and was interviewed in Sep 2021. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 7 reviews
Rating in categories
Assistant Manager
46
salaries
| ₹5.8 L/yr - ₹12.5 L/yr |
Senior Engineer
36
salaries
| ₹3.3 L/yr - ₹8.5 L/yr |
QA QC Engineer
25
salaries
| ₹3 L/yr - ₹8 L/yr |
Assistant Construction Manager
21
salaries
| ₹6 L/yr - ₹15 L/yr |
Safety Supervisor
21
salaries
| ₹2 L/yr - ₹4.5 L/yr |
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company
GAMMON INDIA