L&T Heavy Civil Infrastructure Assistant Construction Manager Interview Questions, Process, and Tips

Updated 11 Nov 2021

L&T Heavy Civil Infrastructure Assistant Construction Manager Interview Experiences

1 interview found

I applied via Walk-in and was interviewed before Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. How to check worker productive?
  • Ans. 

    To check worker productivity, monitor their output, track their progress, and evaluate their efficiency.

    • Monitor the quantity and quality of work completed by each worker.

    • Track the progress of tasks assigned to workers and compare it with the set deadlines.

    • Evaluate the efficiency of workers by analyzing their work methods and time management.

    • Use performance metrics and key performance indicators (KPIs) to measure produc...

  • Answered by AI
  • Q2. How to maintain Safty in height of work?
  • Ans. 

    Safety in height of work can be maintained by following safety protocols and using proper equipment.

    • Ensure workers are trained in safety procedures

    • Use proper safety equipment such as harnesses and helmets

    • Regularly inspect equipment and scaffolding

    • Implement a safety plan and enforce it strictly

    • Provide adequate lighting and signage

    • Monitor weather conditions and adjust work accordingly

  • Answered by AI
  • Q3. What are formalities before concrete to be check?
  • Ans. 

    Formalities before concrete to be checked

    • Ensure proper reinforcement is in place

    • Check for proper formwork and its alignment

    • Verify the mix design and slump of concrete

    • Ensure proper curing measures are in place

    • Check for any obstructions or debris in the concrete placement area

  • Answered by AI
  • Q4. De shuttering period of shuttering activities?
  • Ans. 

    De-shuttering period depends on various factors such as type of concrete, temperature, humidity, and strength required.

    • De-shuttering period is the time taken to remove the formwork or shuttering from the concrete after it has been poured.

    • The period varies depending on the type of concrete used, temperature, humidity, and strength required.

    • For example, for normal concrete, the de-shuttering period is usually 14-21 days,...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Body language is most important and prepare Minumum quality test and procedure

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. D-Wall. Site Executive
Round 2 - Technical 

(1 Question)

  • Q1. Under ground metro construction process
  • Ans. 

    Underground metro construction involves excavation, tunneling, station construction, and track installation.

    • Excavation of tunnels using tunnel boring machines or cut-and-cover method

    • Station construction including platform, concourse, and entrance structures

    • Installation of tracks, signaling systems, and electrical components

    • Ventilation and emergency exit construction for safety measures

  • Answered by AI
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Progress between Job planning and target
  • Ans. 

    Progress between job planning and target is monitored closely to ensure project stays on schedule.

    • Regularly track progress against the project schedule

    • Identify any delays or obstacles and address them promptly

    • Adjust the plan as needed to stay on track

    • Communicate with stakeholders about any changes or updates

    • Use project management software to help monitor progress

  • Answered by AI
  • Q2. Good communication skill with clients
  • Q3. Good behaviour with workers
  • Q4. Follow the project specifications
  • Q5. Follow the HSE norms
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Previous project working style and my role
  • Ans. 

    I have experience working on various civil construction projects, taking on roles such as project manager, site supervisor, and quality control inspector.

    • Managed a team of construction workers and subcontractors to ensure project deadlines were met

    • Oversaw the quality of workmanship and materials used on site

    • Communicated regularly with clients, architects, and engineers to address any issues or changes in the project

    • Imp...

  • Answered by AI
  • Q2. Civil execution related

Interview Preparation Tips

Interview preparation tips for other job seekers - Give answer only what he ask.... don't go for extra words
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Coding Test 

It was easy sorting questions

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2023. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. By Sr Manager Fully technical round
  • Q2. Mostly questions from your last project
Round 2 - Aptitude Test 

Computer base test Technical & Reasoning questions

Round 3 - HR 

(1 Question)

  • Q1. Salary Negotiations

Interview Preparation Tips

Interview preparation tips for other job seekers - Just prepare basic technical questions
Follow me on instagram for details @ civilwallah
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Apr 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. How many Deadment Depth
  • Ans. 

    The deadmen depth depends on the soil type and the load-bearing capacity of the soil.

    • Deadmen depth is the depth at which deadmen are installed to anchor retaining walls or other structures.

    • It is determined by the soil type and the load-bearing capacity of the soil.

    • For example, in sandy soil, the deadmen depth may need to be deeper than in clay soil.

    • The depth can also vary depending on the height and weight of the struc

  • Answered by AI
  • Q2. Minimum 5ft and Check proper depth
Round 2 - HR 

(1 Question)

  • Q1. Why you Change your current job

I applied via Walk-in and was interviewed in Nov 2021. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Erection plan,ASME B 31.3,
  • Q2. Fitup ,fittings,valve
  • Q3. Isoclearance,Mechanical clearance

Interview Preparation Tips

Interview preparation tips for other job seekers - Follow your CV ,and dont overconfidant
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in May 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Construction question
Round 3 - Aptitude Test 

Genral aptitude test

Round 4 - HR 

(1 Question)

  • Q1. Discussion about previous work

Interview Preparation Tips

Interview preparation tips for other job seekers - All necessary documents

I applied via Naukri.com and was interviewed in Sep 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About reconciliation of steel

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview was good but till last round they call upto payment negotiations then they hold suddenly

L&T Heavy Civil Infrastructure Interview FAQs

What are the top questions asked in L&T Heavy Civil Infrastructure Assistant Construction Manager interview?

Some of the top questions asked at the L&T Heavy Civil Infrastructure Assistant Construction Manager interview -

  1. How to maintain Safty in height of wor...read more
  2. What are formalities before concrete to be chec...read more
  3. How to check worker productiv...read more

Tell us how to improve this page.

L&T Heavy Civil Infrastructure Assistant Construction Manager Interview Process

based on 1 interview

Interview experience

2
  
Poor
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 422 Interviews
KEC International Interview Questions
4.0
 • 296 Interviews
TCE Interview Questions
3.8
 • 246 Interviews
Saint-Gobain Interview Questions
4.0
 • 172 Interviews
Worley Interview Questions
4.2
 • 109 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
View all
18% less than the average Assistant Construction Manager Salary in India
View more details

L&T Heavy Civil Infrastructure Assistant Construction Manager Reviews and Ratings

based on 7 reviews

4.1/5

Rating in categories

3.5

Skill development

2.8

Work-life balance

4.4

Salary

4.2

Job security

3.4

Company culture

3.2

Promotions

3.9

Work satisfaction

Explore 7 Reviews and Ratings
Assistant Manager
46 salaries
unlock blur

₹5.8 L/yr - ₹12.5 L/yr

Senior Engineer
36 salaries
unlock blur

₹3.3 L/yr - ₹8.5 L/yr

QA QC Engineer
25 salaries
unlock blur

₹3 L/yr - ₹8 L/yr

Assistant Construction Manager
21 salaries
unlock blur

₹6 L/yr - ₹15 L/yr

Safety Supervisor
21 salaries
unlock blur

₹2 L/yr - ₹4.5 L/yr

Explore more salaries
Compare L&T Heavy Civil Infrastructure with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?