Filter interviews by
Clear (1)
I applied via Recruitment Consulltant and was interviewed before Apr 2023. There was 1 interview round.
Top trending discussions
I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.
Site work related questions and answers
I was interviewed before Jan 2024.
Safety is the state of being free from harm or danger. Hazard is a potential source of harm. Risk is the likelihood of harm occurring.
Safety refers to the condition of being protected from harm or danger.
Hazard is any potential source of harm or adverse health effect on a person or persons.
Risk is the likelihood of harm occurring from exposure to a hazard.
Examples: Safety measures in a construction site, hazards like s
Working at height, scaffolding, excavation, and electrical safety are key aspects of ensuring workplace safety.
Working at height involves tasks performed at elevated levels, requiring fall protection measures.
Scaffolding refers to temporary structures used to support workers and materials during construction or maintenance.
Excavation safety involves precautions taken when digging trenches or excavating to prevent cave-...
A risk assessment is a process of identifying potential hazards, analyzing and evaluating the associated risks, and implementing control measures to mitigate those risks.
Identify potential hazards in the workplace or task
Assess the likelihood and severity of each hazard
Evaluate the level of risk associated with each hazard
Implement control measures to reduce or eliminate the risks
Review and update the risk assessment r...
Salary expectation will depend on the specific job responsibilities, location, industry, and level of experience.
Research industry standards and average salaries for Safety Supervisors in your area.
Consider your level of experience and any additional certifications or qualifications.
Be prepared to negotiate based on the job responsibilities and benefits package offered.
I applied via Company Website and was interviewed in Feb 2022. There were 2 interview rounds.
A group means many people are working together to achieve some targets. The performance of a group depends on the collaborative work of the individuals. The team of three or more than three people is considered as a group.
posted on 17 Nov 2023
I consistently meet or exceed my targets by setting clear goals, prioritizing tasks, and regularly monitoring progress.
Setting specific, measurable targets
Creating a detailed action plan
Regularly tracking progress and making adjustments as needed
All work details .... With site executor
posted on 11 Nov 2022
I applied via Company Website and was interviewed in Oct 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Sep 2023. There were 2 interview rounds.
Lifting safety hazards include strain injuries, falls, and dropped objects.
Use proper lifting techniques to avoid strain injuries
Ensure objects are secure and stable before lifting to prevent drops
Keep work areas clear of obstacles to prevent trips and falls
PTW system stands for Permit to Work system, a formal written system used to control certain types of work that are identified as potentially hazardous.
PTW system is used to ensure that work is carried out safely and in accordance with established procedures.
It involves obtaining permission before starting work in potentially hazardous areas.
The system typically includes risk assessment, identification of hazards, and ...
posted on 7 Aug 2023
I applied via Company Website and was interviewed in Mar 2023. There were 5 interview rounds.
Scaffolding job safety analysis
What is mean by risk and hazards
Hazards identify on height work
based on 1 interview
Interview experience
based on 5 reviews
Rating in categories
Assistant Manager
46
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
36
salaries
| ₹0 L/yr - ₹0 L/yr |
QA QC Engineer
23
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Construction Manager
21
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Supervisor
21
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company
GAMMON INDIA