I applied via Recruitment Consultant and was interviewed in Aug 2021. There were 3 interview rounds.
posted on 29 Apr 2022
I applied via Job Portal and was interviewed before Apr 2021. There were 3 interview rounds.
posted on 24 May 2024
I applied via LinkedIn and was interviewed before May 2023. There were 4 interview rounds.
1. Puzzle solving.
2. Psychological test.
I applied via Recruitment Consulltant and was interviewed in May 2022. There were 2 interview rounds.
posted on 18 Feb 2022
I applied via LinkedIn and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Aug 2023. There were 2 interview rounds.
Activities in toilet area include personal hygiene, using the toilet, and cleaning.
Personal hygiene activities such as washing hands, brushing teeth, and showering
Using the toilet for urination and defecation
Cleaning activities such as wiping surfaces, changing toilet paper, and emptying trash
Maintenance tasks like unclogging drains or fixing leaks
Percentage of completion of a project can be calculated using the cost-to-cost method or milestone method.
Calculate %age of completion by comparing actual costs incurred to date with total estimated costs for the project.
Alternatively, %age of completion can be determined by tracking completion of specific project milestones.
Formula for cost-to-cost method: %age of completion = (Actual costs incurred / Total estimated ...
The sequence of tasks involves plumbing work, wall plastering, wall tiling, and flooring.
Start by completing the plumbing work in the walls and floors
Next, apply wall plaster to smoothen the surface
Then, install wall tiles for a decorative finish
Finally, proceed with the flooring installation
I applied via Approached by Company and was interviewed before Feb 2023. There was 1 interview round.
posted on 27 May 2022
I applied via Referral and was interviewed in Apr 2022. There was 1 interview round.
posted on 15 Jun 2022
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 2 interview rounds.
based on 41 reviews
Rating in categories
Assistant Manager
3.8k
salaries
| ₹6.2 L/yr - ₹20.2 L/yr |
Senior Engineer
3.4k
salaries
| ₹4.5 L/yr - ₹12.5 L/yr |
Assistant Construction Manager
1.2k
salaries
| ₹6 L/yr - ₹16.5 L/yr |
Engineer
1.2k
salaries
| ₹1.6 L/yr - ₹9.3 L/yr |
Manager
1.1k
salaries
| ₹9.5 L/yr - ₹30 L/yr |
Tata Group
Reliance Industries
Adani Group
Mahindra & Mahindra