user image KANHAIYA LAL

posted on 15 Jun 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. What are activities in toilet area
  • Ans. 

    Activities in toilet area include personal hygiene, using the toilet, and cleaning.

    • Personal hygiene activities such as washing hands, brushing teeth, and showering

    • Using the toilet for urination and defecation

    • Cleaning activities such as wiping surfaces, changing toilet paper, and emptying trash

    • Maintenance tasks like unclogging drains or fixing leaks

  • Answered by AI
  • Q2. How will you calculate %age of completion of project
  • Ans. 

    Percentage of completion of a project can be calculated using the cost-to-cost method or milestone method.

    • Calculate %age of completion by comparing actual costs incurred to date with total estimated costs for the project.

    • Alternatively, %age of completion can be determined by tracking completion of specific project milestones.

    • Formula for cost-to-cost method: %age of completion = (Actual costs incurred / Total estimated ...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Plumbing work in wall and floor, wall plaster and then wall tile after that flooring
  • Ans. 

    The sequence of tasks involves plumbing work, wall plastering, wall tiling, and flooring.

    • Start by completing the plumbing work in the walls and floors

    • Next, apply wall plaster to smoothen the surface

    • Then, install wall tiles for a decorative finish

    • Finally, proceed with the flooring installation

  • Answered by AI
  • Q2. By EPC weightage %age

Planning Manager Jobs at GMR Group

View all

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Asked about To mentioned areas of weakness of L&T, or needs improvement?
  • Q2. How to make check or maintain elevation of Underground Piping.
  • Ans. 

    Maintain elevation of underground piping by using level instruments and proper installation techniques.

    • Use a level instrument to check the elevation of the piping during installation.

    • Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.

    • Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.

    • Consider using supports o...

  • Answered by AI
  • Q3. My Job specific role & responsibility, in previous organisation.
  • Ans. 

    In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.

    • Managed a team of employees and delegated tasks effectively

    • Handled customer complaints and resolved issues in a timely manner

    • Created and implemented strategies to improve efficiency and productivity

    • Collaborated with other departments to achieve company goals

    • Conducted performanc

  • Answered by AI
  • Q4. Welding Electrodes for different materials.
  • Ans. 

    Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.

    • Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.

    • Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.

    • Cast iron electrodes have a high nickel content to prevent cracking.

    • Aluminum electrodes have a special coating ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just Be confidant, Be Humble, Be aware about your roles & Responsibility during job Period.

Interview Questionnaire 

2 Questions

  • Q1. The question was regarding the present role I'm assigned and how the implementation of scheduling tools can help planning of E.P.C. in their present business unit.
  • Q2. Technical question on my present project scheduling role & any other digital concept i'm associated with it currently.

Interview Preparation Tips

Round: Resume Shortlist
Experience: These days, not many companies shortlists the candidates by themselves instead they hire third parties in order to minimize the resources and cost burden. These talent acquisition members initially filters the resumes based upon the Years of Experience & the key skills which they receive from their parent companies by matching with the 70-80 % kind of similar roles of the candidates.

In my case, both my experience & roles are perfectly in sync with their requirements. So, they contacted me via naukri.com and asked me to share the updated resume & within a week I got the confirmation of my resume shortlisting & date for the 1st round of interview.

Round: Test
Experience: Primavera Scheduling Test

I appeared for an interview before Mar 2020.

Interview Questionnaire 

2 Questions

  • Q1. Technical
  • Q2. Family background

Interview Preparation Tips

Interview preparation tips for other job seekers - Same

I applied via Approached by Company and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Piping code and welder qualifications test
  • Ans. 

    Piping code and welder qualifications test

    • Piping code refers to the set of standards and regulations that govern the design, fabrication, and inspection of piping systems.

    • Welder qualifications test is a process of testing and certifying welders to ensure that they have the necessary skills and knowledge to perform welding tasks safely and effectively.

    • Both piping code and welder qualifications test are important in ensu...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. What is your current ctc

Interview Preparation Tips

Interview preparation tips for other job seekers - Just specific to your answer.
WQT/wps required in detail

I applied via Naukri.com and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Based on your previous jobs

Interview Preparation Tips

Interview preparation tips for other job seekers - It's totally your luck in interview

I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Concrete rate breakup, Asking rate
  • Q2. Unique thumbrules breakup and unit conversion

Interview Preparation Tips

Interview preparation tips for other job seekers - I explained the concrete breakup with the margin of sub contractor, also explain the subcontractor unit rate breakup and Asking rate is anything like in cricket how many balla are remaining and how much u need to score more. Like.

Joining in L&T is my (No) for evey civil engineers dream..
Thumbrules break up
Rebar - (D2/162) ----(Area x Lengh x 7850).
Like

Interview Questionnaire 

1 Question

  • Q1. If your Experience person , mostly they ask your past experience work related question , If Fresher they ask theoretical question

I applied via Approached by Company and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. It asks your old experience based questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview Basicaly depends on your Luck. What he asked, if you answere, then you are selected, and not answering then you are rejected.

I applied via Walk-in and was interviewed before Dec 2020. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. What is TPM?
  • Ans. 

    TPM stands for Total Productive Maintenance, a system that aims to maximize equipment effectiveness and minimize downtime.

    • TPM involves regular maintenance and inspection of equipment to prevent breakdowns

    • It also includes training employees to operate and maintain equipment properly

    • TPM aims to create a culture of continuous improvement and teamwork

    • Examples of TPM tools include visual management, autonomous maintenance, ...

  • Answered by AI
  • Q2. How you plan routine maintenance for your plant ?
  • Q3. What is MTTR?
  • Ans. 

    MTTR stands for Mean Time To Repair. It is the average time taken to repair a system or equipment after a failure.

    • MTTR is a key metric used in maintenance management.

    • It helps in measuring the efficiency of maintenance processes.

    • MTTR can be calculated by dividing the total downtime by the number of repairs.

    • For example, if a machine was down for a total of 10 hours and it took 2 repairs to fix it, the MTTR would be 5 hou...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I was interviewed for vacancy of maintenance manager so be ready with all theoretical questions.

GMR Group Interview FAQs

How many rounds are there in GMR Group Planning Manager interview?
GMR Group interview process usually has 2 rounds. The most common rounds in the GMR Group interview process are Technical.
How to prepare for GMR Group Planning Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at GMR Group. The most common topics and skills that interviewers at GMR Group expect are Project Management, Analytical Chemistry, Budgeting, Computer Networking and Data Analysis.
What are the top questions asked in GMR Group Planning Manager interview?

Some of the top questions asked at the GMR Group Planning Manager interview -

  1. How will you calculate %age of completion of proj...read more
  2. Plumbing work in wall and floor, wall plaster and then wall tile after that flo...read more
  3. What are activities in toilet a...read more

Tell us how to improve this page.

GMR Group Planning Manager Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
GMR Group Planning Manager Salary
based on 10 salaries
₹15 L/yr - ₹22.5 L/yr
At par with the average Planning Manager Salary in India
View more details

GMR Group Planning Manager Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

4.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Associate Manager - Planning

Panaji

2-8 Yrs

Not Disclosed

Explore more jobs
Associate Manager
293 salaries
unlock blur

₹5.1 L/yr - ₹18.8 L/yr

Junior Manager
252 salaries
unlock blur

₹3 L/yr - ₹12 L/yr

Manager
121 salaries
unlock blur

₹8.1 L/yr - ₹28 L/yr

Senior Engineer
119 salaries
unlock blur

₹3.5 L/yr - ₹8.5 L/yr

Executive Accountant
56 salaries
unlock blur

₹3 L/yr - ₹7.5 L/yr

Explore more salaries
Compare GMR Group with

Larsen & Toubro Limited

4.0
Compare

Megha Engineering & Infrastructures

3.9
Compare

Shapoorji Pallonji Group

4.1
Compare

Kalpataru Projects International

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview