Total Float is the amount of time an activity can be delayed without delaying the project completion date, while Free Float is the amount of time an activity can be delayed without delaying the early start of any successor activity.
Total Float is the amount of time an activity can be delayed without delaying the project completion date.
Free Float is the amount of time an activity can be delayed without delaying the ear...
I plan procurement of construction materials by analyzing project requirements, creating a detailed material list, obtaining quotes from suppliers, negotiating prices, and ensuring timely delivery.
Analyze project requirements to determine the quantity and type of materials needed
Create a detailed material list specifying the required quantities, specifications, and quality standards
Obtain quotes from multiple suppliers...
Modular floor cycle is a construction method where floors are built in sections off-site and then assembled on-site.
Modular floor cycle involves prefabricating floor sections off-site
These sections are then transported to the construction site for assembly
This method can help speed up construction timelines and improve quality control
I faced challenges in achieving the desired slab cycle due to material delays and manpower shortages.
Material delays caused disruptions in the construction schedule.
Manpower shortages led to inefficiencies in the work progress.
Implemented better coordination with suppliers to ensure timely delivery of materials.
Hired additional workers to address the manpower shortage.
Adjusted the project timeline to accommodate unexpe
I have worked at two organizations in the past with an average job tenure of 3 years.
Worked at ABC Company for 4 years as a Planning Engineer
Joined XYZ Corporation as a Senior Planning Engineer and worked for 2 years
Experience includes project scheduling, resource allocation, and budget management
Seeking new challenges, growth opportunities, and a better work-life balance.
Desire for career advancement and professional development
Seeking a more challenging and rewarding role
Looking for a better work-life balance
Want to work in a more innovative or dynamic environment
Seeking better compensation or benefits
Company restructuring or changes in management
Negotiable based on experience and benefits package
Salary expectations are flexible and dependent on the overall compensation package
Open to discussing salary range during the interview process
Seeking competitive compensation aligned with industry standards
Top trending discussions
posted on 30 Nov 2023
I was interviewed before Nov 2022.
posted on 30 Nov 2022
I applied via Job Portal
Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.
Bentonite is mixed with water to form a slurry and pumped into the borehole.
The slurry fills the borehole and stabilizes the walls, preventing collapse.
After the bentonite has set, pulsing can be done without the risk of borehole collapse.
Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.
I applied via Approached by Company and was interviewed before Feb 2023. There were 3 interview rounds.
posted on 10 Sep 2017
I was interviewed before Sep 2016.
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 12 May 2018
posted on 18 Feb 2022
I applied via LinkedIn and was interviewed before Feb 2021. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Civil Site Engineer
11
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive Accountant
10
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Accountant
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Process Coordinator
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Facility Manager
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Projects
Larsen & Toubro Limited
Hindustan Construction Company
Shapoorji Pallonji Group