Upload Button Icon Add office photos

Filter interviews by

PS Group Interview Questions, Process, and Tips

Updated 30 Nov 2024

Top PS Group Interview Questions and Answers

View all 6 questions

PS Group Interview Experiences

Popular Designations

16 interviews found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Execution process
  • Q2. Building rules and laws

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare yourself

Civil Engineer Interview Questions asked at other Companies

Q1. What is the curing formalities for our precast segment???
View answer (22)

Rate your
company

🤫 100% anonymous

How was your last interview experience?

Share interview
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2024. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. They provide me a dataset with some questions (mainly pivot table, index match, lookups and some text functions)
Round 2 - HR 

(1 Question)

  • Q1. My projects, previous job role
Round 3 - Behavioral 

(1 Question)

  • Q1. This was more about a general conversation, mainly evaluation of soft skills

Associate MIS Executive Interview Questions asked at other Companies

Q1. Whats is freeze pane and condition formatting
View answer (1)
PS Group Interview Questions and Answers for Freshers
illustration image
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Oct 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Need to know framing contracts and overall understanding of civil engineering
  • Q2. Do you understand fidic
  • Ans. 

    Yes, FIDIC stands for International Federation of Consulting Engineers and is a set of contract templates commonly used in the construction industry.

    • FIDIC stands for International Federation of Consulting Engineers

    • It provides standard contract templates for construction projects

    • FIDIC contracts are commonly used in the construction industry worldwide

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and know basics

Manager - Contracts Interview Questions asked at other Companies

Q1. 1. What is per sqft costing in a commercial project for MEP? Viz Plumbing, fire fighting, HVAC, electrical, fire Alarm & public address system.
View answer (2)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Approached by Company and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Questions about TDS and previous work in company

Financial Associate Interview Questions asked at other Companies

Q1. Journal entry for cash sales?
View answer (33)

PS Group interview questions for popular designations

 Senior Sales Associate

 (1)

 Manager

 (1)

 Assistant Manager

 (1)

 Senior MEP Engineer

 (1)

 Civil Engineer

 (1)

 Site Engineer

 (1)

 Junior Engineer

 (1)

 Engineer Trainee

 (1)

Interview Questions & Answers

user image Pratyush Mondal

posted on 9 Jul 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Advanced Excel Test
Round 2 - HR 

(1 Question)

  • Q1. Discussion with HR and Team Members
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected
Round 1 - HR 

(1 Question)

  • Q1. General tell me about yourself
Round 2 - Technical 

(1 Question)

  • Q1. Financial statements

Assistant Manager Interview Questions asked at other Companies

Q1. You are Handling cash operations then how you manage operations with sales ?
View answer (87)

Jobs at PS Group

View all
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed before Mar 2023. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Electrical, fire, plumbing, HVAC
Round 2 - One-on-one 

(2 Questions)

  • Q1. About WTP ? Total wTP SYSTEM
  • Q2. Which type of STP
  • Ans. 

    STP stands for Sewage Treatment Plant, which is used to treat wastewater before releasing it back into the environment.

    • There are different types of STPs such as activated sludge process, sequencing batch reactor, and membrane bioreactor.

    • The type of STP used depends on factors like the volume of wastewater to be treated, space availability, and treatment requirements.

    • For example, an activated sludge process is commonly ...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Salary expectation

Senior MEP Engineer Interview Questions asked at other Companies

Q1. How does the secondary voltage pass from the primary winding in a transformer.
View answer (1)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed before Nov 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all Resume tips
Round 2 - Technical 

(3 Questions)

  • Q1. Some technical questions
  • Q2. Why tiles are layed following the arrows behind the tiles
  • Ans. 

    Tiles are laid following the arrows behind them to ensure proper alignment and pattern continuity.

    • Arrows indicate the direction in which the pattern on the tiles should be aligned.

    • Following the arrows helps maintain consistency in the pattern layout.

    • It ensures that the tiles are installed in the correct orientation for a visually appealing finish.

  • Answered by AI
  • Q3. How the tiles are layed and leveled
  • Ans. 

    Tiles are laid by spreading adhesive on the surface and then placing the tiles in a desired pattern. They are leveled using a spirit level to ensure a flat surface.

    • Spread adhesive on the surface evenly

    • Place tiles in desired pattern, starting from the center and working outwards

    • Use a spirit level to ensure tiles are level and flat

    • Make adjustments as needed to maintain levelness

    • Allow adhesive to dry before grouting the t

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Salary expectations

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to be well bergainer about salary expectations

Junior Site Engineer Interview Questions asked at other Companies

Q1. What is IS code of steel
View answer (4)

I applied via Walk-in and was interviewed in May 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(1 Question)

  • Q1. Introduction, hobbies, general questions
Round 3 - One-on-one 

(1 Question)

  • Q1. This was a round with the the director of the group.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare very common technicals, prepare for Basic HR questions and rest will depend upon your personality.
All the best ?

Food & Beverage Manager Interview Questions asked at other Companies

Q1. How you will make a menu for a newly opened restaurant ?
View answer (3)
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all Resume tips
Round 2 - One-on-one 

(1 Question)

  • Q1. What is ld? Minimum dia of steel for column?
  • Ans. 

    ld stands for lap length. Minimum diameter of steel for column depends on the load and design requirements.

    • ld stands for lap length, which is the length of overlap required for splicing reinforcement bars.

    • Minimum diameter of steel for column is determined based on the load carrying capacity and design specifications.

    • The minimum diameter of steel for a column can vary depending on factors such as the type of column, the

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. You have to stay at the site for work.

Engineer Trainee Interview Questions asked at other Companies

Q1. If 10 people had a meeting and they shake hands only once with each of the others, then how many handshakes will be there in total ?
View answer (8)
Contribute & help others!
anonymous
You can choose to be anonymous

PS Group Interview FAQs

How many rounds are there in PS Group interview?
PS Group interview process usually has 2-3 rounds. The most common rounds in the PS Group interview process are Technical, HR and Resume Shortlist.
How to prepare for PS Group interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at PS Group. The most common topics and skills that interviewers at PS Group expect are Budgeting, Basic, Hospitality, MIS Reporting and SEO.
What are the top questions asked in PS Group interview?

Some of the top questions asked at the PS Group interview -

  1. what should be the minimum slope for drainage p...read more
  2. Why tiles are layed following the arrows behind the ti...read more
  3. What is ld? Minimum dia of steel for colu...read more
How long is the PS Group interview process?

The duration of PS Group interview process can vary, but typically it takes about 2-4 weeks to complete.

Recently Viewed

LIST OF COMPANIES

Photon Interactive

Overview

REVIEWS

Kvell Infrastructure

No Reviews

LIST OF COMPANIES

Kvell Infrastructure

Overview

COMPANY BENEFITS

Photon Interactive

No Benefits

COMPANY BENEFITS

Allstate

No Benefits

SALARIES

Allstate

No Salaries

REVIEWS

Allstate

No Reviews

SALARIES

Grasim Industries

No Salaries

JOBS

Allstate

No Jobs

JOBS

Grasim Industries

No Jobs

Tell us how to improve this page.

PS Group Interview Process

based on 14 interviews

Interview experience

4.6
  
Excellent
View more

Saint-Gobain

We thank our employees for rating us 4/5 on AmbitionBox

Interview Questions from Similar Companies

Tata Group Interview Questions
4.2
 • 358 Interviews
Adani Group Interview Questions
3.9
 • 186 Interviews
Essar Group Interview Questions
3.7
 • 28 Interviews
Hinduja Group Interview Questions
4.0
 • 23 Interviews
Bajaj Group Interview Questions
3.9
 • 3 Interviews
View all

PS Group Reviews and Ratings

based on 129 reviews

3.7/5

Rating in categories

3.6

Skill development

3.6

Work-life balance

3.3

Salary

3.3

Job security

3.6

Company culture

3.0

Promotions

3.4

Work satisfaction

Explore 129 Reviews and Ratings
Assistant / Manager Finance (CMC)

Kolkata

10-12 Yrs

₹ 10-14 LPA

Surveyor

Kolkata

5-10 Yrs

Not Disclosed

Senior Executive Marketing

Kolkata

3-8 Yrs

₹ 4-6 LPA

Explore more jobs
Civil Site Engineer
18 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Supervisor
16 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Engineer
15 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Junior Engineer
10 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Junior Site Engineer
8 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare PS Group with

Tata Group

4.2
Compare

Reliance Industries

4.0
Compare

Aditya Birla Group

4.1
Compare

Mahindra & Mahindra

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview