I applied via Approached by Company and was interviewed in Nov 2021. There were 2 interview rounds.
The minimum slope for drainage pipe should be 1/4 inch per foot.
The slope ensures proper flow of water and prevents clogging.
The slope may vary depending on the type of pipe and the material used.
The slope should be checked during installation and adjusted if necessary.
A slope of 1/8 inch per foot may be acceptable for larger pipes.
The slope should always be towards the main drain or sewer line.
Top trending discussions
posted on 21 Nov 2024
I applied via Naukri.com and was interviewed in May 2024. There were 4 interview rounds.
Workability of different works refers to the feasibility and effectiveness of various tasks or projects.
Consider the resources required for each work
Evaluate the timeline and deadlines for completion
Assess the skills and expertise needed for each task
Prioritize tasks based on importance and impact
Adapt to changes and challenges in the project
The methodology of finishing works involves the process of completing the final touches and details of a project.
Develop a detailed plan outlining the sequence of finishing tasks
Coordinate with subcontractors and suppliers to ensure timely delivery of materials
Conduct quality inspections to ensure work meets project specifications
Address any punch list items to ensure project completion
Document all finishing work for f
Civil engineering involves designing, constructing, and maintaining infrastructure such as buildings, roads, bridges, and dams.
Involves designing and planning infrastructure projects
Includes construction and maintenance of buildings, roads, bridges, and dams
Focuses on ensuring structures are safe, functional, and sustainable
Some popular gypsum brands include USG, CertainTeed, and Georgia-Pacific.
USG
CertainTeed
Georgia-Pacific
Fire fighting system in highrise buildings includes fire alarms, sprinkler systems, fire extinguishers, and fire hoses.
Fire alarms are installed throughout the building to alert occupants of a fire emergency.
Sprinkler systems automatically activate to extinguish fires in the early stages.
Fire extinguishers are strategically placed on each floor for manual fire suppression.
Fire hoses are available on each floor for trai...
Yes, Mivan shuttering is a popular construction technique used for casting walls and slabs in buildings.
Mivan shuttering is a formwork system that allows for rapid construction of concrete walls and slabs.
It involves setting up aluminum formwork panels that are easily assembled and dismantled.
Mivan shuttering is commonly used in high-rise buildings, residential complexes, and commercial projects.
The use of Mivan shutte...
The mix used for marble flooring typically consists of marble chips, cement, sand, and water.
Marble chips are the main component for marble flooring mix
Cement is used as a binding agent
Sand is added for strength and durability
Water is used to create a workable mixture
I applied via Campus Placement and was interviewed in May 2024. There were 2 interview rounds.
Construction in civil
posted on 5 Apr 2024
S.L.D stands for Single Line Diagram of an electrical scheme.
S.L.D is a simplified diagram that shows the electrical connections and components in a system.
It typically includes power sources, distribution lines, transformers, circuit breakers, and loads.
S.L.D helps in understanding the overall layout of the electrical system and how components are connected.
It is used for planning, designing, and troubleshooting elect...
Capacitor panels are used to improve power factor and reduce electricity costs.
Improves power factor by reducing reactive power consumption
Helps in reducing electricity costs by avoiding penalties for low power factor
Increases efficiency of electrical systems
Used in industries, commercial buildings, and large facilities
posted on 9 Apr 2022
I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Referral and was interviewed before Aug 2021. There was 1 interview round.
I have handled multiple ERP systems including SAP, Oracle, and Microsoft Dynamics.
I have experience with SAP ERP, which is widely used in large organizations for managing various business processes.
I have also worked with Oracle ERP, which offers a comprehensive suite of applications for finance, supply chain, and human resources management.
I am familiar with Microsoft Dynamics ERP, which is known for its user-friendly...
The modules were different components of the project that were developed separately.
The modules included a user interface module, a database module, and a reporting module.
Each module had its own team responsible for its development.
The modules were integrated together during the testing phase.
The project was divided into modules to ensure efficient development and easier maintenance.
Real Estate environment refers to the economic, legal, and physical factors that affect the buying, selling, and development of property.
Includes factors such as zoning laws, property taxes, and market trends
Involves various stakeholders such as buyers, sellers, agents, and developers
Can be influenced by macroeconomic factors such as interest rates and inflation
Examples of real estate projects include residential devel...
Project procurement and supply can be managed by following a structured process that includes planning, sourcing, contracting, and monitoring.
Develop a procurement plan that outlines the procurement process and identifies the goods and services required for the project
Identify potential suppliers and evaluate their capabilities and suitability for the project
Negotiate contracts that clearly define the scope of work, de...
Project management can be managed through effective planning, communication, and monitoring.
Create a detailed project plan with clear objectives and timelines
Communicate regularly with team members and stakeholders to ensure everyone is on the same page
Monitor progress and adjust the plan as needed to stay on track
Use project management tools and software to streamline processes
Delegate tasks and responsibilities to te...
Work orders should be tracked and managed against the original order to ensure timely completion and accurate billing.
Create a system for assigning and tracking work orders
Ensure work orders are properly documented and communicated to relevant parties
Regularly review progress and adjust timelines as needed
Ensure accurate billing by tracking work order completion and comparing to original order
Use technology such as pro...
Liaison in ERP involves communication and coordination between different departments and stakeholders to ensure smooth implementation and functioning of the system.
Liaison involves identifying key stakeholders and their roles in the ERP implementation process
It also involves establishing communication channels and protocols for sharing information and updates
Liaison helps to ensure that all departments are aligned with...
Yes, I have worked on multiple data migration projects.
Managed data migration from legacy systems to new platforms
Developed data mapping and transformation strategies
Ensured data accuracy and completeness through testing and validation
Collaborated with cross-functional teams to identify and resolve data issues
Examples: migrated customer data from Salesforce to HubSpot, migrated financial data from QuickBooks to SAP
Civil Site Engineer
19
salaries
| ₹2.2 L/yr - ₹5.1 L/yr |
Site Supervisor
16
salaries
| ₹2 L/yr - ₹4.1 L/yr |
Site Engineer
15
salaries
| ₹3.4 L/yr - ₹6 L/yr |
Assistant Manager
11
salaries
| ₹4.4 L/yr - ₹8 L/yr |
Junior Engineer
10
salaries
| ₹3 L/yr - ₹4.4 L/yr |
Tata Group
Reliance Industries
Aditya Birla Group
Mahindra & Mahindra