posted on 27 May 2022

I applied via Approached by Company and was interviewed in Nov 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. What should be the minimum slope for drainage pipe
  • Ans. 

    The minimum slope for drainage pipe should be 1/4 inch per foot.

    • The slope ensures proper flow of water and prevents clogging.

    • The slope may vary depending on the type of pipe and the material used.

    • The slope should be checked during installation and adjusted if necessary.

    • A slope of 1/8 inch per foot may be acceptable for larger pipes.

    • The slope should always be towards the main drain or sewer line.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basics of plumbing work,pipe drop,minimum slope

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2024. There were 4 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Experience and designation
  • Q2. Work culture and education
Round 2 - One-on-one 

(5 Questions)

  • Q1. Previous experience information and role
  • Q2. Building finishing detail knowledge
  • Q3. Manpower utilisation & scheduling
  • Q4. Workbality of different works
  • Ans. 

    Workability of different works refers to the feasibility and effectiveness of various tasks or projects.

    • Consider the resources required for each work

    • Evaluate the timeline and deadlines for completion

    • Assess the skills and expertise needed for each task

    • Prioritize tasks based on importance and impact

    • Adapt to changes and challenges in the project

  • Answered by AI
  • Q5. Case study of project completion
Round 3 - Technical 

(1 Question)

  • Q1. Methodology of finishing works
  • Ans. 

    The methodology of finishing works involves the process of completing the final touches and details of a project.

    • Develop a detailed plan outlining the sequence of finishing tasks

    • Coordinate with subcontractors and suppliers to ensure timely delivery of materials

    • Conduct quality inspections to ensure work meets project specifications

    • Address any punch list items to ensure project completion

    • Document all finishing work for f

  • Answered by AI
Round 4 - Technical 

(2 Questions)

  • Q1. Basic definition of civil engineering
  • Ans. 

    Civil engineering involves designing, constructing, and maintaining infrastructure such as buildings, roads, bridges, and dams.

    • Involves designing and planning infrastructure projects

    • Includes construction and maintenance of buildings, roads, bridges, and dams

    • Focuses on ensuring structures are safe, functional, and sustainable

  • Answered by AI
  • Q2. Expectations from company

Interview Preparation Tips

Interview preparation tips for other job seekers - Bank Statement of three month,three Salary slip, education certificates, previous experience letter and appointment letter required
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Share about yourself,
  • Q2. What are the gypsum brands
  • Ans. 

    Some popular gypsum brands include USG, CertainTeed, and Georgia-Pacific.

    • USG

    • CertainTeed

    • Georgia-Pacific

  • Answered by AI
  • Q3. Explain fire fighting syatem in highrise buildings
  • Ans. 

    Fire fighting system in highrise buildings includes fire alarms, sprinkler systems, fire extinguishers, and fire hoses.

    • Fire alarms are installed throughout the building to alert occupants of a fire emergency.

    • Sprinkler systems automatically activate to extinguish fires in the early stages.

    • Fire extinguishers are strategically placed on each floor for manual fire suppression.

    • Fire hoses are available on each floor for trai...

  • Answered by AI
  • Q4. Is mivan shuttering used before
  • Ans. 

    Yes, Mivan shuttering is a popular construction technique used for casting walls and slabs in buildings.

    • Mivan shuttering is a formwork system that allows for rapid construction of concrete walls and slabs.

    • It involves setting up aluminum formwork panels that are easily assembled and dismantled.

    • Mivan shuttering is commonly used in high-rise buildings, residential complexes, and commercial projects.

    • The use of Mivan shutte...

  • Answered by AI
  • Q5. What mix is used for marble flooring
  • Ans. 

    The mix used for marble flooring typically consists of marble chips, cement, sand, and water.

    • Marble chips are the main component for marble flooring mix

    • Cement is used as a binding agent

    • Sand is added for strength and durability

    • Water is used to create a workable mixture

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Go through with basic study of all department.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

Construction in civil

Round 2 - HR 

(2 Questions)

  • Q1. About dra homes
  • Q2. Technical questions
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. S.L.D of Electrical scheme
  • Ans. 

    S.L.D stands for Single Line Diagram of an electrical scheme.

    • S.L.D is a simplified diagram that shows the electrical connections and components in a system.

    • It typically includes power sources, distribution lines, transformers, circuit breakers, and loads.

    • S.L.D helps in understanding the overall layout of the electrical system and how components are connected.

    • It is used for planning, designing, and troubleshooting elect...

  • Answered by AI
  • Q2. Why use capacitor panel use
  • Ans. 

    Capacitor panels are used to improve power factor and reduce electricity costs.

    • Improves power factor by reducing reactive power consumption

    • Helps in reducing electricity costs by avoiding penalties for low power factor

    • Increases efficiency of electrical systems

    • Used in industries, commercial buildings, and large facilities

  • Answered by AI

I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Interview Preparation Tips

Topics to prepare for Rajapushpa Properties Project Manager Civil interview:
  • Civil Construction
  • Bilding
  • Quality Control
  • Shutaring
Interview preparation tips for other job seekers - Hardworking out put verry happy

I applied via Referral and was interviewed before Aug 2021. There was 1 interview round.

Round 1 - Technical 

(8 Questions)

  • Q1. What type of ERP you handled till date?
  • Ans. 

    I have handled multiple ERP systems including SAP, Oracle, and Microsoft Dynamics.

    • I have experience with SAP ERP, which is widely used in large organizations for managing various business processes.

    • I have also worked with Oracle ERP, which offers a comprehensive suite of applications for finance, supply chain, and human resources management.

    • I am familiar with Microsoft Dynamics ERP, which is known for its user-friendly...

  • Answered by AI
  • Q2. What were the modules?
  • Ans. 

    The modules were different components of the project that were developed separately.

    • The modules included a user interface module, a database module, and a reporting module.

    • Each module had its own team responsible for its development.

    • The modules were integrated together during the testing phase.

    • The project was divided into modules to ensure efficient development and easier maintenance.

  • Answered by AI
  • Q3. What is your understanding about Real Estate environment?
  • Ans. 

    Real Estate environment refers to the economic, legal, and physical factors that affect the buying, selling, and development of property.

    • Includes factors such as zoning laws, property taxes, and market trends

    • Involves various stakeholders such as buyers, sellers, agents, and developers

    • Can be influenced by macroeconomic factors such as interest rates and inflation

    • Examples of real estate projects include residential devel...

  • Answered by AI
  • Q4. How to manage project procurement and supply?
  • Ans. 

    Project procurement and supply can be managed by following a structured process that includes planning, sourcing, contracting, and monitoring.

    • Develop a procurement plan that outlines the procurement process and identifies the goods and services required for the project

    • Identify potential suppliers and evaluate their capabilities and suitability for the project

    • Negotiate contracts that clearly define the scope of work, de...

  • Answered by AI
  • Q5. How to manage project management?
  • Ans. 

    Project management can be managed through effective planning, communication, and monitoring.

    • Create a detailed project plan with clear objectives and timelines

    • Communicate regularly with team members and stakeholders to ensure everyone is on the same page

    • Monitor progress and adjust the plan as needed to stay on track

    • Use project management tools and software to streamline processes

    • Delegate tasks and responsibilities to te...

  • Answered by AI
  • Q6. How to manage Work Order against an order?
  • Ans. 

    Work orders should be tracked and managed against the original order to ensure timely completion and accurate billing.

    • Create a system for assigning and tracking work orders

    • Ensure work orders are properly documented and communicated to relevant parties

    • Regularly review progress and adjust timelines as needed

    • Ensure accurate billing by tracking work order completion and comparing to original order

    • Use technology such as pro...

  • Answered by AI
  • Q7. How liaison works in ERP?
  • Ans. 

    Liaison in ERP involves communication and coordination between different departments and stakeholders to ensure smooth implementation and functioning of the system.

    • Liaison involves identifying key stakeholders and their roles in the ERP implementation process

    • It also involves establishing communication channels and protocols for sharing information and updates

    • Liaison helps to ensure that all departments are aligned with...

  • Answered by AI
  • Q8. Have you worked on Data Migration project directly?
  • Ans. 

    Yes, I have worked on multiple data migration projects.

    • Managed data migration from legacy systems to new platforms

    • Developed data mapping and transformation strategies

    • Ensured data accuracy and completeness through testing and validation

    • Collaborated with cross-functional teams to identify and resolve data issues

    • Examples: migrated customer data from Salesforce to HubSpot, migrated financial data from QuickBooks to SAP

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - It's OK OK organization. A technical person cannot look for a long term association in clear way.

Skills evaluated in this interview

PS Group Interview FAQs

How many rounds are there in PS Group MEP Manager interview?
PS Group interview process usually has 2 rounds. The most common rounds in the PS Group interview process are Resume Shortlist and One-on-one Round.

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Group Interview Questions
4.2
 • 357 Interviews
Adani Group Interview Questions
3.9
 • 177 Interviews
Essar Group Interview Questions
3.8
 • 28 Interviews
Hinduja Group Interview Questions
4.0
 • 22 Interviews
JP Infra Interview Questions
3.8
 • 18 Interviews
View all
Civil Site Engineer
19 salaries
unlock blur

₹2.2 L/yr - ₹5.1 L/yr

Site Supervisor
16 salaries
unlock blur

₹2 L/yr - ₹4.1 L/yr

Site Engineer
15 salaries
unlock blur

₹3.4 L/yr - ₹6 L/yr

Assistant Manager
11 salaries
unlock blur

₹4.4 L/yr - ₹8 L/yr

Junior Engineer
10 salaries
unlock blur

₹3 L/yr - ₹4.4 L/yr

Explore more salaries
Compare PS Group with

Tata Group

4.2
Compare

Reliance Industries

4.0
Compare

Aditya Birla Group

4.1
Compare

Mahindra & Mahindra

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview