Upload Button Icon Add office photos

Filter interviews by

PS Group Site Engineer Interview Questions and Answers

Updated 30 Jul 2021

PS Group Site Engineer Interview Experiences

1 interview found

I applied via Referral and was interviewed in Jan 2021. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Civil structural, finishing and mep. These subjects have to be known.

Interview Preparation Tips

Interview preparation tips for other job seekers - Not only civil any specialization, you have to know civil structural, finishing in details, electrical, plumbing, land scaping all things. Have Knowledge everything.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Self introduction and my career details
  • Q2. Its about my previous company details
Round 2 - Technical 

(1 Question)

  • Q1. It's all about my experience based technical questions

Site Engineer Interview Questions & Answers

DRA Homes user image Nishanth Ganesan Velu

posted on 31 Jul 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(3 Questions)

  • Q1. Density of common material like cement, steel, fine and coarse aggregate
  • Ans. 

    Density of common construction materials varies, with cement around 1440 kg/m3, steel around 7850 kg/m3, fine aggregate around 1600-1750 kg/m3, and coarse aggregate around 1200-1750 kg/m3.

    • Cement density: 1440 kg/m3

    • Steel density: 7850 kg/m3

    • Fine aggregate density: 1600-1750 kg/m3

    • Coarse aggregate density: 1200-1750 kg/m3

  • Answered by AI
  • Q2. Weight of the cube which is made to check the strength of concrete
  • Ans. 

    The weight of the cube used to check the strength of concrete is typically 15 cm x 15 cm x 15 cm and weighs around 29 kg.

    • Standard size of cube for testing concrete strength is 15 cm x 15 cm x 15 cm

    • Weight of the cube is usually around 29 kg

    • The cube is made of concrete from the same batch being tested

  • Answered by AI
  • Q3. Ratio of cement mortar for outer and inner wall plastering
  • Ans. 

    The ratio of cement mortar for outer and inner wall plastering varies depending on the type of wall and desired finish.

    • The ratio of cement mortar for outer wall plastering is usually 1:4 (1 part cement to 4 parts sand).

    • The ratio of cement mortar for inner wall plastering is typically 1:6 (1 part cement to 6 parts sand).

    • However, the ratio can vary based on factors such as the type of wall surface, desired finish, and lo...

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. What is your goal and do you know how to achieve?
  • Ans. 

    My goal is to become a proficient Site Engineer by gaining experience, knowledge, and skills in the field.

    • Continuously seek opportunities to learn and improve technical skills

    • Work on various projects to gain practical experience

    • Seek mentorship from experienced engineers

    • Stay updated with industry trends and technologies

    • Obtain relevant certifications to enhance credibility

    • Set specific career milestones to track progress

  • Answered by AI
  • Q2. After 5 to 6 years, what is your position in your field ?
  • Ans. 

    I envision myself as a Senior Site Engineer leading projects and mentoring junior engineers.

    • Leading and managing multiple projects simultaneously

    • Mentoring and training junior engineers

    • Implementing innovative technologies and practices

    • Collaborating with cross-functional teams for successful project delivery

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be strong on what you know and have to know something about advancement in your field

I applied via Naukri.com and was interviewed before Jul 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Building construction ,Rcc works,quality measures at site etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Always speak confidently ,donot be nervous.

Well skill in professional knowledge
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Discraib and draw slab section
  • Q2. Draw scetion and elevation bath room
  • Ans. 

    Section and elevation drawings of a bathroom

    • Include dimensions for all fixtures and fittings

    • Show the placement of plumbing lines and electrical outlets

    • Label materials and finishes for walls, floors, and fixtures

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Tell mi about us
  • Ans. 

    A leading engineering company specializing in innovative solutions for various industries.

    • Provides cutting-edge engineering solutions

    • Works with a wide range of industries such as automotive, aerospace, and technology

    • Focuses on research and development to stay ahead of the competition

  • Answered by AI
  • Q2. Last company review
  • Ans. 

    Received positive feedback on technical skills and leadership abilities.

    • Received commendation for successfully leading a team in completing a major project ahead of schedule

    • Recognized for consistently providing innovative solutions to complex technical challenges

    • Received high ratings for communication skills and ability to collaborate effectively with cross-functional teams

  • Answered by AI

Interview Questionnaire 

2 Questions

  • Q1. Execution of Steel and Shuttering
  • Ans. 

    Execution of steel and shuttering involves the proper planning, design, and installation of these materials for construction projects.

    • Steel reinforcement bars must be placed in the correct location and spacing to ensure structural integrity.

    • Shuttering must be properly designed and installed to create the desired shape and size of concrete structures.

    • Both steel and shuttering must be inspected regularly to ensure they a...

  • Answered by AI
  • Q2. Concrete Mix Design
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Dec 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Pervious company and personal details will ask.
Round 2 - Technical 

(4 Questions)

  • Q1. Full of core related questions.
  • Q2. Like that civil related IS codes.
  • Q3. Concrete related questions.
  • Q4. Material related questions.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
-
Result
Selected Selected

I applied via Walk-in

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Maivan work know waterproofing work check, brick work, plastering, painting, putty, primary , gypsum work know, falceling, tile marvel, granite, wooden work know, upvc mep railing scating work check,
  • Ans. Interview time I'm speak
  • Answered by lalatsahoo
  • Q2. Any question & answer i can speak

Interview Preparation Tips

Interview preparation tips for other job seekers - I can speak English, hindi, odia, finishing work total know, stacher
My present company my home group
My pvc company aparna construction
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Internal plaster thickness and ratio?
  • Ans. 

    Internal plaster thickness and ratio are important factors in construction projects.

    • The standard thickness of internal plaster is usually 12mm for walls and 15mm for ceilings.

    • The ratio of internal plaster is typically 1:6 (1 part cement to 6 parts sand).

    • The thickness and ratio may vary depending on the specific requirements of the project and the type of surface being plastered.

  • Answered by AI
  • Q2. Process of slab checking?
  • Ans. 

    Slab checking involves verifying the structural integrity and load-bearing capacity of concrete slabs.

    • Check for proper reinforcement placement and spacing

    • Verify concrete mix design and curing process

    • Inspect for any cracks or defects

    • Ensure slab thickness meets design specifications

    • Perform load testing if necessary

  • Answered by AI
  • Q3. External Plaster thickness and ratio?
  • Ans. 

    External plaster thickness and ratio are determined based on the type of surface and desired finish.

    • External plaster thickness typically ranges from 12mm to 20mm depending on the surface condition.

    • The ratio of external plaster mix is usually 1:4 (cement:sand) for rough surfaces and 1:6 for smooth finishes.

    • For better adhesion, a bonding agent may be added to the plaster mix.

    • Proper curing is essential to ensure the stren

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I will try my best technical knowledge provide for your company...
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(4 Questions)

  • Q1. Just Try to answer honestly
  • Q2. Stay Confident Happy
  • Q3. Draw RCC Structure
  • Ans. 

    RCC structure is a reinforced concrete structure commonly used in construction.

    • RCC structures consist of concrete reinforced with steel bars for added strength

    • Common types of RCC structures include beams, columns, slabs, and walls

    • RCC structures are designed to withstand heavy loads and provide durability

    • Proper reinforcement detailing is crucial for the structural integrity of RCC structures

  • Answered by AI
  • Q4. Tell About MEP drawing
  • Ans. 

    MEP drawings are detailed plans that show the mechanical, electrical, and plumbing systems of a building.

    • MEP drawings include layouts for HVAC systems, electrical wiring, plumbing fixtures, and fire protection systems.

    • They are essential for coordinating the installation of these systems during construction.

    • MEP drawings also indicate the location of equipment, materials, and connections needed for the systems to functio...

  • Answered by AI
Round 3 - One-on-one 

(1 Question)

  • Q1. Draw a section of Plumbing
  • Ans. 

    A section of plumbing typically includes pipes, fittings, and fixtures for water supply and drainage systems.

    • Include pipes for both water supply and drainage systems

    • Show fittings such as elbows, tees, and couplings

    • Include fixtures like sinks, toilets, and showers

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Improving your basic knowledge

Tell us how to improve this page.

Interview Questions from Similar Companies

DRA Homes Interview Questions
4.6
 • 23 Interviews
N.K. Realtors Interview Questions
4.2
 • 19 Interviews
JP Infra Interview Questions
3.8
 • 19 Interviews
DTC Projects Interview Questions
4.0
 • 17 Interviews
Bullmen Realty Interview Questions
2.9
 • 14 Interviews
Kunal Structure Interview Questions
3.7
 • 11 Interviews
View all
PS Group Site Engineer Salary
based on 15 salaries
₹3.4 L/yr - ₹6 L/yr
48% more than the average Site Engineer Salary in India
View more details

PS Group Site Engineer Reviews and Ratings

based on 5 reviews

3.1/5

Rating in categories

3.1

Skill development

2.9

Work-life balance

2.5

Salary

3.3

Job security

1.9

Company culture

2.3

Promotions

2.7

Work satisfaction

Explore 5 Reviews and Ratings
Civil Site Engineer
18 salaries
unlock blur

₹2.2 L/yr - ₹5 L/yr

Site Supervisor
16 salaries
unlock blur

₹2 L/yr - ₹4.1 L/yr

Site Engineer
15 salaries
unlock blur

₹3.4 L/yr - ₹6 L/yr

Junior Engineer
10 salaries
unlock blur

₹3 L/yr - ₹4.4 L/yr

Senior MEP Engineer
8 salaries
unlock blur

₹4.5 L/yr - ₹6.2 L/yr

Explore more salaries
Compare PS Group with

Realty Assistant

3.8
Compare

Kunal Structure

3.7
Compare

Omkar Realtors and Developers Group

3.7
Compare

HM Group

4.4
Compare
Did you find this page helpful?
Yes No
write
Share an Interview