DTC Projects Interview Questions, Process, and Tips

Updated 23 Dec 2024

Top DTC Projects Interview Questions and Answers

View all 26 questions

DTC Projects Interview Experiences

Popular Designations

16 interviews found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Internal plaster thickness and ratio?
  • Ans. 

    Internal plaster thickness and ratio are important factors in construction projects.

    • The standard thickness of internal plaster is usually 12mm for walls and 15mm for ceilings.

    • The ratio of internal plaster is typically 1:6 (1 part cement to 6 parts sand).

    • The thickness and ratio may vary depending on the specific requirements of the project and the type of surface being plastered.

  • Answered by AI
  • Q2. Process of slab checking?
  • Ans. 

    Slab checking involves verifying the structural integrity and load-bearing capacity of concrete slabs.

    • Check for proper reinforcement placement and spacing

    • Verify concrete mix design and curing process

    • Inspect for any cracks or defects

    • Ensure slab thickness meets design specifications

    • Perform load testing if necessary

  • Answered by AI
  • Q3. External Plaster thickness and ratio?
  • Ans. 

    External plaster thickness and ratio are determined based on the type of surface and desired finish.

    • External plaster thickness typically ranges from 12mm to 20mm depending on the surface condition.

    • The ratio of external plaster mix is usually 1:4 (cement:sand) for rough surfaces and 1:6 for smooth finishes.

    • For better adhesion, a bonding agent may be added to the plaster mix.

    • Proper curing is essential to ensure the stren

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I will try my best technical knowledge provide for your company...

Civil Engineer Interview Questions asked at other Companies

Q1. What is the curing formalities for our precast segment???
View answer (20)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. What is your mind so subject please confirm it
  • Q2. Then please i will also
  • Q3. Why I left the last company
  • Ans. 

    Seeking new challenges and growth opportunities

    • Desire for career advancement

    • Limited opportunities for growth in previous company

    • Seeking new challenges and experiences

  • Answered by AI
  • Q4. How to take the company forward
  • Ans. 

    To take the company forward, we need to focus on innovation, market expansion, talent development, and customer satisfaction.

    • Invest in research and development for innovative products/services

    • Explore new markets and expand the company's reach

    • Provide training and development opportunities for employees to enhance skills

    • Focus on improving customer experience and satisfaction

    • Implement effective marketing strategies to inc

  • Answered by AI
  • Q5. What will I do if I get selected in the company?

Interview Preparation Tips

Interview preparation tips for other job seekers - As far as the interview is concerned, if it is taken in Hindi, it will be better. If the interview is taken one by one and we are selected as soon as possible, it will be better.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2024. There were 2 interview rounds.

Round 1 - Technical 

(5 Questions)

  • Q1. What is Total Float and Free Float?
  • Ans. 

    Total Float is the amount of time an activity can be delayed without delaying the project completion date, while Free Float is the amount of time an activity can be delayed without delaying the early start of any successor activity.

    • Total Float is the amount of time an activity can be delayed without delaying the project completion date.

    • Free Float is the amount of time an activity can be delayed without delaying the ear...

  • Answered by AI
  • Q2. How do you plan procurement of construction materials?
  • Ans. 

    I plan procurement of construction materials by analyzing project requirements, creating a detailed material list, obtaining quotes from suppliers, negotiating prices, and ensuring timely delivery.

    • Analyze project requirements to determine the quantity and type of materials needed

    • Create a detailed material list specifying the required quantities, specifications, and quality standards

    • Obtain quotes from multiple suppliers...

  • Answered by AI
  • Q3. Activity wise Standard labour productivity
  • Q4. What was Modular floor cycle in your last project?
  • Ans. 

    Modular floor cycle is a construction method where floors are built in sections off-site and then assembled on-site.

    • Modular floor cycle involves prefabricating floor sections off-site

    • These sections are then transported to the construction site for assembly

    • This method can help speed up construction timelines and improve quality control

  • Answered by AI
  • Q5. What challenges had you experienced in achieving the desired slab cycle and how did you overcome?
  • Ans. 

    I faced challenges in achieving the desired slab cycle due to material delays and manpower shortages.

    • Material delays caused disruptions in the construction schedule.

    • Manpower shortages led to inefficiencies in the work progress.

    • Implemented better coordination with suppliers to ensure timely delivery of materials.

    • Hired additional workers to address the manpower shortage.

    • Adjusted the project timeline to accommodate unexpe

  • Answered by AI
Round 2 - HR 

(4 Questions)

  • Q1. Educational qualification background
  • Q2. Details of previous organizations and job tenure
  • Ans. 

    I have worked at two organizations in the past with an average job tenure of 3 years.

    • Worked at ABC Company for 4 years as a Planning Engineer

    • Joined XYZ Corporation as a Senior Planning Engineer and worked for 2 years

    • Experience includes project scheduling, resource allocation, and budget management

  • Answered by AI
  • Q3. Why do I need to change my present job?
  • Ans. 

    Seeking new challenges, growth opportunities, and a better work-life balance.

    • Desire for career advancement and professional development

    • Seeking a more challenging and rewarding role

    • Looking for a better work-life balance

    • Want to work in a more innovative or dynamic environment

    • Seeking better compensation or benefits

    • Company restructuring or changes in management

  • Answered by AI
  • Q4. Expected Salary?
  • Ans. 

    Negotiable based on experience and benefits package

    • Salary expectations are flexible and dependent on the overall compensation package

    • Open to discussing salary range during the interview process

    • Seeking competitive compensation aligned with industry standards

  • Answered by AI

Interview Preparation Tips

Topics to prepare for DTC Projects Senior Planning Engineer interview:
  • MSP
  • P6
  • IS456
  • IS1200
  • Reinforcement rolling margin
  • Labour Productivity
  • MS Excel
Interview preparation tips for other job seekers - Very friendly job interview session, cool interviewers!

Senior Planning Engineer Interview Questions asked at other Companies

Q1. What is MIS? and how it prepare.
View answer (1)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Work experience
  • Q2. Field experience
Round 3 - Technical 

(2 Questions)

  • Q1. Work experience
  • Q2. Reinforcement checking, ply shuttering work.
Round 4 - Technical 

(2 Questions)

  • Q1. Work experience
  • Q2. Dorking experience

Assistant Engineer - Civil Interview Questions asked at other Companies

Q1. If the cubes are failed then what will you do ?
View answer (7)

DTC Projects interview questions for popular designations

 Assistant Engineer - Civil

 (1)

 Assistant Facility Manager

 (1)

 Civil Engineer

 (1)

 Civil Site Engineer

 (1)

 Executive Accountant

 (1)

 Legal Manager

 (1)

 Liaison Manager

 (1)

 Planning Engineer

 (1)

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Oct 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. HR asked about me
Round 3 - Technical 

(2 Questions)

  • Q1. What are the responsibilities of an site engineer??
  • Ans. 

    Site engineers are responsible for overseeing construction projects, managing workers, ensuring safety regulations are followed, and coordinating with various stakeholders.

    • Managing construction projects from start to finish

    • Supervising and coordinating construction workers

    • Ensuring safety regulations and building codes are followed

    • Collaborating with architects, engineers, and subcontractors

    • Preparing and presenting progre

  • Answered by AI
  • Q2. Execution's & Reduce wastage

Interview Preparation Tips

Interview preparation tips for other job seekers - Telling the truth and keeping confidence.

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (63)

Get interview-ready with Top DTC Projects Interview Questions

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Why we hire you
  • Q2. If you some one gives you batter offer so wil you keep this job of left this job.
Round 2 - One-on-one 

(2 Questions)

  • Q1. Copairesion in real-estate field
  • Ans. 

    Comparison in real estate involves evaluating properties based on various factors like location, size, amenities, and market trends.

    • Comparing properties based on location, such as proximity to schools, shopping centers, and public transportation

    • Evaluating properties based on size, number of bedrooms and bathrooms, and overall square footage

    • Considering amenities like swimming pools, gyms, and security features

    • Analyzing ...

  • Answered by AI
  • Q2. Previous experiencees

Interview Preparation Tips

Interview preparation tips for other job seekers - Be not prepared, always be practical.

PRE Sales Executive Interview Questions asked at other Companies

Q1. How can you suggest a particular technology to an individual?
View answer (1)

Jobs at DTC Projects

View all
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via LinkedIn and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. H R Employee Recruitment process ?
  • Ans. 

    HR employee recruitment process involves sourcing, screening, interviewing, and selecting candidates for job openings.

    • Sourcing candidates through job boards, social media, referrals, and recruitment agencies

    • Screening resumes to shortlist qualified candidates

    • Conducting interviews to assess skills, experience, and cultural fit

    • Selecting the best candidate and extending a job offer

    • Onboarding the new employee and facilitati

  • Answered by AI

Senior HR Executive Interview Questions asked at other Companies

Q1. 3. Do you have knowledge about labour laws, PF proceedings and contract laws?
View answer (2)
Interview experience
4
Good
Difficulty level
-
Process Duration
Less than 2 weeks
Result
No response

I was interviewed in Sep 2023.

Round 1 - One-on-one 

(1 Question)

  • Q1. Basic question about previous company and work responsibilities

Planning Engineer Interview Questions asked at other Companies

Q1. Prepare a small given example site schedule with sequencing and duration determine project duration in MSP/on Paper What is critical path method? How will you identify while making on paper rather than MSP? How would you track schedule-Proc... read more
View answer (1)

I applied via Naukri.com and was interviewed in Nov 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(8 Questions)

  • Q1. What is the job role in your presence organization?
  • Ans. 

    As a Quantity Surveyor and Billing Engineer, my job role in my current organization is to manage and control costs for construction projects, prepare bills of quantities, and ensure accurate and timely billing.

    • Managing and controlling costs for construction projects

    • Preparing bills of quantities

    • Ensuring accurate and timely billing

    • Collaborating with project teams to monitor and track project expenses

    • Conducting cost analy...

  • Answered by AI
  • Q2. What is the formula of cutting length of helical stirrup ?
  • Ans. 

    The formula for cutting length of helical stirrup is 2πr + 2L + 10d.

    • The helical stirrup is used to provide lateral support to columns and beams.

    • The cutting length is calculated by adding the circumference of the helix to the length of the straight bars.

    • The diameter of the bar is also taken into consideration in the formula.

    • The formula is 2πr + 2L + 10d, where r is the radius of the helix, L is the length of the straigh...

  • Answered by AI
  • Q3. How much quantity of putty required for 1 sqm work?
  • Ans. 

    The quantity of putty required for 1 sqm work depends on the thickness of the putty layer.

    • The thickness of the putty layer can vary from 1mm to 3mm.

    • For a 1mm thick layer, approximately 0.5 kg of putty is required for 1 sqm work.

    • For a 2mm thick layer, approximately 1 kg of putty is required for 1 sqm work.

    • For a 3mm thick layer, approximately 1.5 kg of putty is required for 1 sqm work.

  • Answered by AI
  • Q4. How much cft wood required for door frame?
  • Ans. 

    The amount of cft wood required for a door frame depends on the size of the frame.

    • The standard size of a door frame is 7 feet by 3 feet.

    • For a standard size door frame, approximately 20 cft of wood is required.

    • The type of wood used can also affect the amount required.

    • It is important to factor in any additional wood needed for hinges and locks.

  • Answered by AI
  • Q5. How to prepare a costing of any project?
  • Ans. 

    To prepare a costing of any project, one needs to consider various factors such as materials, labor, equipment, and overhead costs.

    • Identify the scope of work and project requirements

    • Determine the quantity and cost of materials needed

    • Estimate the labor costs based on the scope of work and required skill level

    • Calculate the equipment costs, including rental or purchase costs and maintenance expenses

    • Include overhead costs ...

  • Answered by AI
  • Q6. What are the documents required to add with contractor bill?
  • Ans. 

    The documents required to add with contractor bill include measurement book, work order, completion certificate, and any other relevant documents.

    • Measurement book

    • Work order

    • Completion certificate

    • Relevant documents

  • Answered by AI
  • Q7. How much deduction is made at the time of shuttering work measurement?
  • Ans. 

    Deduction for shuttering work measurement varies from project to project and depends on the contract agreement.

    • Deduction is usually made for the thickness of the shuttering material used.

    • The percentage of deduction can range from 5% to 15% depending on the project.

    • The contract agreement should specify the percentage of deduction for shuttering work measurement.

    • The deduction is made to account for the volume of the shut...

  • Answered by AI
  • Q8. Multifunction factor of painting work on MS railling ?
  • Ans. 

    Painting work on MS railing has multifunctional factors.

    • Painting protects the MS railing from corrosion and rusting.

    • It enhances the aesthetic appeal of the railing.

    • Painting also makes the railing more visible, improving safety.

    • The type of paint used can affect the durability and maintenance requirements.

    • The cost of painting work should be factored into the overall project budget.

  • Answered by AI
Round 3 - Technical 

(6 Questions)

  • Q1. What is the job role in your present organization?
  • Q2. Do you know quantity survey?
  • Ans. 

    Yes, Quantity Survey is a process of estimating and managing costs related to construction projects.

    • Quantity Survey involves estimating and managing costs related to construction projects

    • It includes preparing bills of quantities, cost estimates, and tender documents

    • Quantity Surveyors also manage contracts and ensure projects are completed within budget

    • They work closely with architects, engineers, and contractors to ens

  • Answered by AI
  • Q3. How do you prepare a budget?
  • Ans. 

    A budget is prepared by identifying all the expenses and income for a specific period of time.

    • Identify all the expenses and income for the period

    • Categorize the expenses and income

    • Estimate the amount for each category

    • Allocate funds accordingly

    • Regularly monitor and adjust the budget as needed

  • Answered by AI
  • Q4. What is the present labour rate of brick work?
  • Ans. 

    The present labour rate of brick work varies depending on factors such as location, complexity of the project, and market conditions.

    • Labour rates for brick work can range from $10 to $30 per square foot.

    • Rates may be higher in urban areas compared to rural areas.

    • Complex brick work designs or intricate patterns may command higher labour rates.

    • Labour rates can also be influenced by the availability of skilled bricklayers ...

  • Answered by AI
  • Q5. What is the material & labour rate of flooring work?
  • Ans. 

    The material & labour rate of flooring work varies depending on the type of flooring and location.

    • The material cost can vary based on the type of flooring material used such as tiles, marble, wood, etc.

    • The labour cost can vary based on the location and availability of skilled workers.

    • The cost can also vary based on the size of the flooring area and complexity of the design.

    • The rates can be obtained from local suppliers...

  • Answered by AI
  • Q6. What is the rate of aluminium door window work?
  • Ans. 

    The rate of aluminium door window work varies depending on several factors.

    • The rate can vary based on the type of aluminium used, the size of the window or door, and the complexity of the design.

    • The location of the project can also affect the rate.

    • On average, the rate can range from $200 to $500 per square meter.

    • It is important to get a detailed quote from a contractor before starting the work.

  • Answered by AI
Round 4 - Behavioral 

(4 Questions)

  • Q1. Tell me about your self.
  • Q2. What is the job role in your present organization?
  • Ans. 

    I am responsible for managing the quantity and cost of materials and labor on construction projects.

    • Preparing and reviewing bills of quantities

    • Estimating and costing materials, labor, and equipment

    • Analyzing project costs and providing cost control measures

    • Preparing and submitting progress and final payment claims

    • Assisting in tendering and contract administration

    • Collaborating with project teams to ensure cost-effective

  • Answered by AI
  • Q3. How do you check contractor billing?
  • Ans. 

    Contractor billing is checked by verifying the work done, materials used, and comparing it with the contract terms.

    • Verify the work done by visiting the site and checking the progress

    • Check the materials used and ensure they are of the specified quality

    • Compare the billing with the contract terms and ensure there are no discrepancies

    • Ensure that the billing is in line with the project schedule and milestones

    • Check for any a...

  • Answered by AI
  • Q4. How do you prepare BOQ?
  • Ans. 

    BOQ is prepared by analyzing drawings and specifications, measuring quantities, and pricing them.

    • Analyze drawings and specifications to identify items to be included in BOQ

    • Measure quantities of each item using standard units of measurement

    • Price each item based on market rates and specifications

    • Sum up the prices to arrive at the total cost of the project

    • Include contingencies and taxes as applicable

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - If you have technically sound knowledge you can get job here easily.

Top DTC Projects Quantity Surveyor and Billing Engineer Interview Questions and Answers

Q1. What is the formula of cutting length of helical stirrup ?
View answer (2)

Quantity Surveyor and Billing Engineer Interview Questions asked at other Companies

Q1. What is the formula of cutting length of helical stirrup ?
View answer (2)

Time Keeper Interview Questions & Answers

user image Anonymous

posted on 1 Oct 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Oct 2023. There were 5 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Good company DTC group
Round 2 - HR 

(1 Question)

  • Q1. H.R interview is very important
Round 3 - One-on-one 

(1 Question)

  • Q1. One by one discussion is very important
Round 4 - Assignment 

Assignment mostly important

Round 5 - Aptitude Test 

Very nice aptitude test

Interview Preparation Tips

Interview preparation tips for other job seekers - Iam time keeper keeper & P.f @Esic work experience &Back office work at DTC group

Time Keeper Interview Questions asked at other Companies

Q1. JOB RESPONSIBILITIES & EXPERIENCE: COORDINATE WITH ALL OF SITE TIME KEEPERS. MONITORING LABOUR HOURS BY THE SOFTWARE OF HIGHERACCOUNTING INVENTORY SYSTEM.
View answer (1)

DTC Projects Interview FAQs

How many rounds are there in DTC Projects interview?
DTC Projects interview process usually has 2-3 rounds. The most common rounds in the DTC Projects interview process are Technical, HR and One-on-one Round.
How to prepare for DTC Projects interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at DTC Projects. The most common topics and skills that interviewers at DTC Projects expect are Real Estate, AutoCAD, TDS, Accounting and Sales.
What are the top questions asked in DTC Projects interview?

Some of the top questions asked at the DTC Projects interview -

  1. What is the formula of cutting length of helical stirru...read more
  2. How much deduction is made at the time of shuttering work measureme...read more
  3. How do you plan procurement of construction materia...read more
How long is the DTC Projects interview process?

The duration of DTC Projects interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

DTC Projects Interview Process

based on 22 interviews

Interview experience

4.3
  
Good
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 406 Interviews
GMR Group Interview Questions
4.1
 • 76 Interviews
GAMMON INDIA Interview Questions
3.9
 • 29 Interviews
Essar Group Interview Questions
3.8
 • 28 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

DTC Projects Reviews and Ratings

based on 165 reviews

4.1/5

Rating in categories

4.0

Skill development

3.8

Work-life balance

3.8

Salary

3.9

Job security

3.9

Company culture

3.6

Promotions

3.9

Work satisfaction

Explore 165 Reviews and Ratings
Supervisor

Kolkata

7-12 Yrs

₹ 2.75-3.5 LPA

Safety Supervisor

Kolkata

3-6 Yrs

Not Disclosed

Interior Designer

Ballygunge

3-6 Yrs

Not Disclosed

Explore more jobs
Executive Accountant
10 salaries
unlock blur

₹1.9 L/yr - ₹4.2 L/yr

Civil Site Engineer
9 salaries
unlock blur

₹3 L/yr - ₹5 L/yr

Senior Accountant
9 salaries
unlock blur

₹3.5 L/yr - ₹5.8 L/yr

Process Coordinator
9 salaries
unlock blur

₹2 L/yr - ₹3 L/yr

Facility Manager
8 salaries
unlock blur

₹3.8 L/yr - ₹6 L/yr

Explore more salaries
Compare DTC Projects with

Tata Projects

4.2
Compare

Larsen & Toubro Limited

4.0
Compare

Hindustan Construction Company

4.2
Compare

Shapoorji Pallonji Group

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview