Internal plaster thickness and ratio are important factors in construction projects.
The standard thickness of internal plaster is usually 12mm for walls and 15mm for ceilings.
The ratio of internal plaster is typically 1:6 (1 part cement to 6 parts sand).
The thickness and ratio may vary depending on the specific requirements of the project and the type of surface being plastered.
Slab checking involves verifying the structural integrity and load-bearing capacity of concrete slabs.
Check for proper reinforcement placement and spacing
Verify concrete mix design and curing process
Inspect for any cracks or defects
Ensure slab thickness meets design specifications
Perform load testing if necessary
External plaster thickness and ratio are determined based on the type of surface and desired finish.
External plaster thickness typically ranges from 12mm to 20mm depending on the surface condition.
The ratio of external plaster mix is usually 1:4 (cement:sand) for rough surfaces and 1:6 for smooth finishes.
For better adhesion, a bonding agent may be added to the plaster mix.
Proper curing is essential to ensure the stren
I applied via Company Website and was interviewed in Jul 2024. There was 1 interview round.
Seeking new challenges and growth opportunities
Desire for career advancement
Limited opportunities for growth in previous company
Seeking new challenges and experiences
To take the company forward, we need to focus on innovation, market expansion, talent development, and customer satisfaction.
Invest in research and development for innovative products/services
Explore new markets and expand the company's reach
Provide training and development opportunities for employees to enhance skills
Focus on improving customer experience and satisfaction
Implement effective marketing strategies to inc
I applied via Naukri.com and was interviewed in Apr 2024. There were 2 interview rounds.
Total Float is the amount of time an activity can be delayed without delaying the project completion date, while Free Float is the amount of time an activity can be delayed without delaying the early start of any successor activity.
Total Float is the amount of time an activity can be delayed without delaying the project completion date.
Free Float is the amount of time an activity can be delayed without delaying the ear...
I plan procurement of construction materials by analyzing project requirements, creating a detailed material list, obtaining quotes from suppliers, negotiating prices, and ensuring timely delivery.
Analyze project requirements to determine the quantity and type of materials needed
Create a detailed material list specifying the required quantities, specifications, and quality standards
Obtain quotes from multiple suppliers...
Modular floor cycle is a construction method where floors are built in sections off-site and then assembled on-site.
Modular floor cycle involves prefabricating floor sections off-site
These sections are then transported to the construction site for assembly
This method can help speed up construction timelines and improve quality control
I faced challenges in achieving the desired slab cycle due to material delays and manpower shortages.
Material delays caused disruptions in the construction schedule.
Manpower shortages led to inefficiencies in the work progress.
Implemented better coordination with suppliers to ensure timely delivery of materials.
Hired additional workers to address the manpower shortage.
Adjusted the project timeline to accommodate unexpe
I have worked at two organizations in the past with an average job tenure of 3 years.
Worked at ABC Company for 4 years as a Planning Engineer
Joined XYZ Corporation as a Senior Planning Engineer and worked for 2 years
Experience includes project scheduling, resource allocation, and budget management
Seeking new challenges, growth opportunities, and a better work-life balance.
Desire for career advancement and professional development
Seeking a more challenging and rewarding role
Looking for a better work-life balance
Want to work in a more innovative or dynamic environment
Seeking better compensation or benefits
Company restructuring or changes in management
Negotiable based on experience and benefits package
Salary expectations are flexible and dependent on the overall compensation package
Open to discussing salary range during the interview process
Seeking competitive compensation aligned with industry standards
I applied via Walk-in and was interviewed in Nov 2023. There were 4 interview rounds.
DTC Projects interview questions for popular designations
I applied via Company Website and was interviewed in Oct 2023. There were 3 interview rounds.
Site engineers are responsible for overseeing construction projects, managing workers, ensuring safety regulations are followed, and coordinating with various stakeholders.
Managing construction projects from start to finish
Supervising and coordinating construction workers
Ensuring safety regulations and building codes are followed
Collaborating with architects, engineers, and subcontractors
Preparing and presenting progre
Get interview-ready with Top DTC Projects Interview Questions
I applied via Referral and was interviewed in Sep 2023. There were 2 interview rounds.
Comparison in real estate involves evaluating properties based on various factors like location, size, amenities, and market trends.
Comparing properties based on location, such as proximity to schools, shopping centers, and public transportation
Evaluating properties based on size, number of bedrooms and bathrooms, and overall square footage
Considering amenities like swimming pools, gyms, and security features
Analyzing ...
I applied via LinkedIn and was interviewed in Dec 2023. There was 1 interview round.
HR employee recruitment process involves sourcing, screening, interviewing, and selecting candidates for job openings.
Sourcing candidates through job boards, social media, referrals, and recruitment agencies
Screening resumes to shortlist qualified candidates
Conducting interviews to assess skills, experience, and cultural fit
Selecting the best candidate and extending a job offer
Onboarding the new employee and facilitati
I was interviewed in Sep 2023.
posted on 14 Apr 2022
I applied via Naukri.com and was interviewed in Nov 2022. There were 4 interview rounds.
As a Quantity Surveyor and Billing Engineer, my job role in my current organization is to manage and control costs for construction projects, prepare bills of quantities, and ensure accurate and timely billing.
Managing and controlling costs for construction projects
Preparing bills of quantities
Ensuring accurate and timely billing
Collaborating with project teams to monitor and track project expenses
Conducting cost analy...
The formula for cutting length of helical stirrup is 2πr + 2L + 10d.
The helical stirrup is used to provide lateral support to columns and beams.
The cutting length is calculated by adding the circumference of the helix to the length of the straight bars.
The diameter of the bar is also taken into consideration in the formula.
The formula is 2πr + 2L + 10d, where r is the radius of the helix, L is the length of the straigh...
The quantity of putty required for 1 sqm work depends on the thickness of the putty layer.
The thickness of the putty layer can vary from 1mm to 3mm.
For a 1mm thick layer, approximately 0.5 kg of putty is required for 1 sqm work.
For a 2mm thick layer, approximately 1 kg of putty is required for 1 sqm work.
For a 3mm thick layer, approximately 1.5 kg of putty is required for 1 sqm work.
The amount of cft wood required for a door frame depends on the size of the frame.
The standard size of a door frame is 7 feet by 3 feet.
For a standard size door frame, approximately 20 cft of wood is required.
The type of wood used can also affect the amount required.
It is important to factor in any additional wood needed for hinges and locks.
To prepare a costing of any project, one needs to consider various factors such as materials, labor, equipment, and overhead costs.
Identify the scope of work and project requirements
Determine the quantity and cost of materials needed
Estimate the labor costs based on the scope of work and required skill level
Calculate the equipment costs, including rental or purchase costs and maintenance expenses
Include overhead costs ...
The documents required to add with contractor bill include measurement book, work order, completion certificate, and any other relevant documents.
Measurement book
Work order
Completion certificate
Relevant documents
Deduction for shuttering work measurement varies from project to project and depends on the contract agreement.
Deduction is usually made for the thickness of the shuttering material used.
The percentage of deduction can range from 5% to 15% depending on the project.
The contract agreement should specify the percentage of deduction for shuttering work measurement.
The deduction is made to account for the volume of the shut...
Painting work on MS railing has multifunctional factors.
Painting protects the MS railing from corrosion and rusting.
It enhances the aesthetic appeal of the railing.
Painting also makes the railing more visible, improving safety.
The type of paint used can affect the durability and maintenance requirements.
The cost of painting work should be factored into the overall project budget.
Yes, Quantity Survey is a process of estimating and managing costs related to construction projects.
Quantity Survey involves estimating and managing costs related to construction projects
It includes preparing bills of quantities, cost estimates, and tender documents
Quantity Surveyors also manage contracts and ensure projects are completed within budget
They work closely with architects, engineers, and contractors to ens
A budget is prepared by identifying all the expenses and income for a specific period of time.
Identify all the expenses and income for the period
Categorize the expenses and income
Estimate the amount for each category
Allocate funds accordingly
Regularly monitor and adjust the budget as needed
The present labour rate of brick work varies depending on factors such as location, complexity of the project, and market conditions.
Labour rates for brick work can range from $10 to $30 per square foot.
Rates may be higher in urban areas compared to rural areas.
Complex brick work designs or intricate patterns may command higher labour rates.
Labour rates can also be influenced by the availability of skilled bricklayers ...
The material & labour rate of flooring work varies depending on the type of flooring and location.
The material cost can vary based on the type of flooring material used such as tiles, marble, wood, etc.
The labour cost can vary based on the location and availability of skilled workers.
The cost can also vary based on the size of the flooring area and complexity of the design.
The rates can be obtained from local suppliers...
The rate of aluminium door window work varies depending on several factors.
The rate can vary based on the type of aluminium used, the size of the window or door, and the complexity of the design.
The location of the project can also affect the rate.
On average, the rate can range from $200 to $500 per square meter.
It is important to get a detailed quote from a contractor before starting the work.
I am responsible for managing the quantity and cost of materials and labor on construction projects.
Preparing and reviewing bills of quantities
Estimating and costing materials, labor, and equipment
Analyzing project costs and providing cost control measures
Preparing and submitting progress and final payment claims
Assisting in tendering and contract administration
Collaborating with project teams to ensure cost-effective
Contractor billing is checked by verifying the work done, materials used, and comparing it with the contract terms.
Verify the work done by visiting the site and checking the progress
Check the materials used and ensure they are of the specified quality
Compare the billing with the contract terms and ensure there are no discrepancies
Ensure that the billing is in line with the project schedule and milestones
Check for any a...
BOQ is prepared by analyzing drawings and specifications, measuring quantities, and pricing them.
Analyze drawings and specifications to identify items to be included in BOQ
Measure quantities of each item using standard units of measurement
Price each item based on market rates and specifications
Sum up the prices to arrive at the total cost of the project
Include contingencies and taxes as applicable
I applied via Company Website and was interviewed before Oct 2023. There were 5 interview rounds.
Assignment mostly important
Very nice aptitude test
Top trending discussions
Interview experience
based on 165 reviews
Rating in categories
Executive Accountant
10
salaries
| ₹1.9 L/yr - ₹4.2 L/yr |
Civil Site Engineer
9
salaries
| ₹3 L/yr - ₹5 L/yr |
Senior Accountant
9
salaries
| ₹3.5 L/yr - ₹5.8 L/yr |
Process Coordinator
9
salaries
| ₹2 L/yr - ₹3 L/yr |
Facility Manager
8
salaries
| ₹3.8 L/yr - ₹6 L/yr |
Tata Projects
Larsen & Toubro Limited
Hindustan Construction Company
Shapoorji Pallonji Group