posted on 14 Apr 2022
I applied via Naukri.com and was interviewed in Nov 2022. There were 4 interview rounds.
As a Quantity Surveyor and Billing Engineer, my job role in my current organization is to manage and control costs for construction projects, prepare bills of quantities, and ensure accurate and timely billing.
Managing and controlling costs for construction projects
Preparing bills of quantities
Ensuring accurate and timely billing
Collaborating with project teams to monitor and track project expenses
Conducting cost analy...
The formula for cutting length of helical stirrup is 2πr + 2L + 10d.
The helical stirrup is used to provide lateral support to columns and beams.
The cutting length is calculated by adding the circumference of the helix to the length of the straight bars.
The diameter of the bar is also taken into consideration in the formula.
The formula is 2πr + 2L + 10d, where r is the radius of the helix, L is the length of the straigh...
The quantity of putty required for 1 sqm work depends on the thickness of the putty layer.
The thickness of the putty layer can vary from 1mm to 3mm.
For a 1mm thick layer, approximately 0.5 kg of putty is required for 1 sqm work.
For a 2mm thick layer, approximately 1 kg of putty is required for 1 sqm work.
For a 3mm thick layer, approximately 1.5 kg of putty is required for 1 sqm work.
The amount of cft wood required for a door frame depends on the size of the frame.
The standard size of a door frame is 7 feet by 3 feet.
For a standard size door frame, approximately 20 cft of wood is required.
The type of wood used can also affect the amount required.
It is important to factor in any additional wood needed for hinges and locks.
To prepare a costing of any project, one needs to consider various factors such as materials, labor, equipment, and overhead costs.
Identify the scope of work and project requirements
Determine the quantity and cost of materials needed
Estimate the labor costs based on the scope of work and required skill level
Calculate the equipment costs, including rental or purchase costs and maintenance expenses
Include overhead costs ...
The documents required to add with contractor bill include measurement book, work order, completion certificate, and any other relevant documents.
Measurement book
Work order
Completion certificate
Relevant documents
Deduction for shuttering work measurement varies from project to project and depends on the contract agreement.
Deduction is usually made for the thickness of the shuttering material used.
The percentage of deduction can range from 5% to 15% depending on the project.
The contract agreement should specify the percentage of deduction for shuttering work measurement.
The deduction is made to account for the volume of the shut...
Painting work on MS railing has multifunctional factors.
Painting protects the MS railing from corrosion and rusting.
It enhances the aesthetic appeal of the railing.
Painting also makes the railing more visible, improving safety.
The type of paint used can affect the durability and maintenance requirements.
The cost of painting work should be factored into the overall project budget.
Yes, Quantity Survey is a process of estimating and managing costs related to construction projects.
Quantity Survey involves estimating and managing costs related to construction projects
It includes preparing bills of quantities, cost estimates, and tender documents
Quantity Surveyors also manage contracts and ensure projects are completed within budget
They work closely with architects, engineers, and contractors to ens
A budget is prepared by identifying all the expenses and income for a specific period of time.
Identify all the expenses and income for the period
Categorize the expenses and income
Estimate the amount for each category
Allocate funds accordingly
Regularly monitor and adjust the budget as needed
The present labour rate of brick work varies depending on factors such as location, complexity of the project, and market conditions.
Labour rates for brick work can range from $10 to $30 per square foot.
Rates may be higher in urban areas compared to rural areas.
Complex brick work designs or intricate patterns may command higher labour rates.
Labour rates can also be influenced by the availability of skilled bricklayers ...
The material & labour rate of flooring work varies depending on the type of flooring and location.
The material cost can vary based on the type of flooring material used such as tiles, marble, wood, etc.
The labour cost can vary based on the location and availability of skilled workers.
The cost can also vary based on the size of the flooring area and complexity of the design.
The rates can be obtained from local suppliers...
The rate of aluminium door window work varies depending on several factors.
The rate can vary based on the type of aluminium used, the size of the window or door, and the complexity of the design.
The location of the project can also affect the rate.
On average, the rate can range from $200 to $500 per square meter.
It is important to get a detailed quote from a contractor before starting the work.
I am responsible for managing the quantity and cost of materials and labor on construction projects.
Preparing and reviewing bills of quantities
Estimating and costing materials, labor, and equipment
Analyzing project costs and providing cost control measures
Preparing and submitting progress and final payment claims
Assisting in tendering and contract administration
Collaborating with project teams to ensure cost-effective
Contractor billing is checked by verifying the work done, materials used, and comparing it with the contract terms.
Verify the work done by visiting the site and checking the progress
Check the materials used and ensure they are of the specified quality
Compare the billing with the contract terms and ensure there are no discrepancies
Ensure that the billing is in line with the project schedule and milestones
Check for any a...
BOQ is prepared by analyzing drawings and specifications, measuring quantities, and pricing them.
Analyze drawings and specifications to identify items to be included in BOQ
Measure quantities of each item using standard units of measurement
Price each item based on market rates and specifications
Sum up the prices to arrive at the total cost of the project
Include contingencies and taxes as applicable
Top trending discussions
posted on 10 Sep 2020
I applied via Campus Placement and was interviewed before Sep 2019. There were 4 interview rounds.
posted on 18 Nov 2020
Android architecture stack is a set of layers that make up the Android operating system.
The stack includes four main layers: Linux kernel, native libraries, Android runtime, and application framework.
The Linux kernel provides low-level system functionality.
Native libraries are written in C or C++ and provide access to hardware-specific features.
The Android runtime includes the Dalvik virtual machine and core libraries.
...
AIDL stands for Android Interface Definition Language, used for inter-process communication in Android.
AIDL is used to define the interface between client and service in Android.
It allows communication between different processes in Android.
AIDL is used to pass complex data types between processes.
AIDL is similar to Remote Procedure Call (RPC) in other programming languages.
Example: AIDL is used in Android to implement...
Hash set and hash map are data structures used to store key-value pairs for efficient retrieval.
Hash set stores unique values without any specific order.
Hash map stores key-value pairs and allows fast retrieval of values based on keys.
Both use hashing to map keys to their corresponding values.
In Java, HashSet and HashMap are implementations of these data structures.
posted on 27 Feb 2022
I applied via Company Website and was interviewed before Feb 2021. There were 3 interview rounds.
About experience and scope of work current organization and civil engineering related questions.
posted on 20 Feb 2015
posted on 10 Sep 2017
I was interviewed before Sep 2016.
I want to join the company because of its innovative projects and strong company culture.
I am impressed by the company's track record of successful projects.
I believe the company's values align with my own professional goals.
I am excited about the opportunity to work with a talented team of professionals.
I see great potential for growth and development within the company.
I am a dedicated and hardworking individual with relevant skills and experience.
I have a strong work ethic and am committed to delivering high-quality results.
I have relevant experience and skills that align with the requirements of the position.
I am a quick learner and adaptable to new environments.
I am passionate about the industry and eager to contribute to the team.
I would like to work in a marketing and communications profile.
Experience in creating marketing campaigns
Strong communication skills
Ability to analyze market trends and consumer behavior
Proficiency in social media and digital marketing
Collaboration with cross-functional teams
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 27 Apr 2022
I applied via Referral and was interviewed before Apr 2021. There were 2 interview rounds.
posted on 12 Oct 2020
I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.
Some of the top questions asked at the DTC Projects Quantity Surveyor and Billing Engineer interview -
based on 1 review
Rating in categories
Civil Site Engineer
11
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive Accountant
10
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Accountant
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Process Coordinator
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Facility Manager
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Projects
Larsen & Toubro Limited
Hindustan Construction Company
Shapoorji Pallonji Group