DTC Projects Quantity Surveyor and Billing Engineer Interview Questions, Process, and Tips

Updated 2 Dec 2022

DTC Projects Quantity Surveyor and Billing Engineer Interview Experiences

1 interview found

I applied via Naukri.com and was interviewed in Nov 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(8 Questions)

  • Q1. What is the job role in your presence organization?
  • Ans. 

    As a Quantity Surveyor and Billing Engineer, my job role in my current organization is to manage and control costs for construction projects, prepare bills of quantities, and ensure accurate and timely billing.

    • Managing and controlling costs for construction projects

    • Preparing bills of quantities

    • Ensuring accurate and timely billing

    • Collaborating with project teams to monitor and track project expenses

    • Conducting cost analy...

  • Answered by AI
  • Q2. What is the formula of cutting length of helical stirrup ?
  • Ans. 

    The formula for cutting length of helical stirrup is 2πr + 2L + 10d.

    • The helical stirrup is used to provide lateral support to columns and beams.

    • The cutting length is calculated by adding the circumference of the helix to the length of the straight bars.

    • The diameter of the bar is also taken into consideration in the formula.

    • The formula is 2πr + 2L + 10d, where r is the radius of the helix, L is the length of the straigh...

  • Answered by AI
  • Q3. How much quantity of putty required for 1 sqm work?
  • Ans. 

    The quantity of putty required for 1 sqm work depends on the thickness of the putty layer.

    • The thickness of the putty layer can vary from 1mm to 3mm.

    • For a 1mm thick layer, approximately 0.5 kg of putty is required for 1 sqm work.

    • For a 2mm thick layer, approximately 1 kg of putty is required for 1 sqm work.

    • For a 3mm thick layer, approximately 1.5 kg of putty is required for 1 sqm work.

  • Answered by AI
  • Q4. How much cft wood required for door frame?
  • Ans. 

    The amount of cft wood required for a door frame depends on the size of the frame.

    • The standard size of a door frame is 7 feet by 3 feet.

    • For a standard size door frame, approximately 20 cft of wood is required.

    • The type of wood used can also affect the amount required.

    • It is important to factor in any additional wood needed for hinges and locks.

  • Answered by AI
  • Q5. How to prepare a costing of any project?
  • Ans. 

    To prepare a costing of any project, one needs to consider various factors such as materials, labor, equipment, and overhead costs.

    • Identify the scope of work and project requirements

    • Determine the quantity and cost of materials needed

    • Estimate the labor costs based on the scope of work and required skill level

    • Calculate the equipment costs, including rental or purchase costs and maintenance expenses

    • Include overhead costs ...

  • Answered by AI
  • Q6. What are the documents required to add with contractor bill?
  • Ans. 

    The documents required to add with contractor bill include measurement book, work order, completion certificate, and any other relevant documents.

    • Measurement book

    • Work order

    • Completion certificate

    • Relevant documents

  • Answered by AI
  • Q7. How much deduction is made at the time of shuttering work measurement?
  • Ans. 

    Deduction for shuttering work measurement varies from project to project and depends on the contract agreement.

    • Deduction is usually made for the thickness of the shuttering material used.

    • The percentage of deduction can range from 5% to 15% depending on the project.

    • The contract agreement should specify the percentage of deduction for shuttering work measurement.

    • The deduction is made to account for the volume of the shut...

  • Answered by AI
  • Q8. Multifunction factor of painting work on MS railling ?
  • Ans. 

    Painting work on MS railing has multifunctional factors.

    • Painting protects the MS railing from corrosion and rusting.

    • It enhances the aesthetic appeal of the railing.

    • Painting also makes the railing more visible, improving safety.

    • The type of paint used can affect the durability and maintenance requirements.

    • The cost of painting work should be factored into the overall project budget.

  • Answered by AI
Round 3 - Technical 

(6 Questions)

  • Q1. What is the job role in your present organization?
  • Q2. Do you know quantity survey?
  • Ans. 

    Yes, Quantity Survey is a process of estimating and managing costs related to construction projects.

    • Quantity Survey involves estimating and managing costs related to construction projects

    • It includes preparing bills of quantities, cost estimates, and tender documents

    • Quantity Surveyors also manage contracts and ensure projects are completed within budget

    • They work closely with architects, engineers, and contractors to ens

  • Answered by AI
  • Q3. How do you prepare a budget?
  • Ans. 

    A budget is prepared by identifying all the expenses and income for a specific period of time.

    • Identify all the expenses and income for the period

    • Categorize the expenses and income

    • Estimate the amount for each category

    • Allocate funds accordingly

    • Regularly monitor and adjust the budget as needed

  • Answered by AI
  • Q4. What is the present labour rate of brick work?
  • Ans. 

    The present labour rate of brick work varies depending on factors such as location, complexity of the project, and market conditions.

    • Labour rates for brick work can range from $10 to $30 per square foot.

    • Rates may be higher in urban areas compared to rural areas.

    • Complex brick work designs or intricate patterns may command higher labour rates.

    • Labour rates can also be influenced by the availability of skilled bricklayers ...

  • Answered by AI
  • Q5. What is the material & labour rate of flooring work?
  • Ans. 

    The material & labour rate of flooring work varies depending on the type of flooring and location.

    • The material cost can vary based on the type of flooring material used such as tiles, marble, wood, etc.

    • The labour cost can vary based on the location and availability of skilled workers.

    • The cost can also vary based on the size of the flooring area and complexity of the design.

    • The rates can be obtained from local suppliers...

  • Answered by AI
  • Q6. What is the rate of aluminium door window work?
  • Ans. 

    The rate of aluminium door window work varies depending on several factors.

    • The rate can vary based on the type of aluminium used, the size of the window or door, and the complexity of the design.

    • The location of the project can also affect the rate.

    • On average, the rate can range from $200 to $500 per square meter.

    • It is important to get a detailed quote from a contractor before starting the work.

  • Answered by AI
Round 4 - Behavioral 

(4 Questions)

  • Q1. Tell me about your self.
  • Q2. What is the job role in your present organization?
  • Ans. 

    I am responsible for managing the quantity and cost of materials and labor on construction projects.

    • Preparing and reviewing bills of quantities

    • Estimating and costing materials, labor, and equipment

    • Analyzing project costs and providing cost control measures

    • Preparing and submitting progress and final payment claims

    • Assisting in tendering and contract administration

    • Collaborating with project teams to ensure cost-effective

  • Answered by AI
  • Q3. How do you check contractor billing?
  • Ans. 

    Contractor billing is checked by verifying the work done, materials used, and comparing it with the contract terms.

    • Verify the work done by visiting the site and checking the progress

    • Check the materials used and ensure they are of the specified quality

    • Compare the billing with the contract terms and ensure there are no discrepancies

    • Ensure that the billing is in line with the project schedule and milestones

    • Check for any a...

  • Answered by AI
  • Q4. How do you prepare BOQ?
  • Ans. 

    BOQ is prepared by analyzing drawings and specifications, measuring quantities, and pricing them.

    • Analyze drawings and specifications to identify items to be included in BOQ

    • Measure quantities of each item using standard units of measurement

    • Price each item based on market rates and specifications

    • Sum up the prices to arrive at the total cost of the project

    • Include contingencies and taxes as applicable

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - If you have technically sound knowledge you can get job here easily.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Apr 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. General Details
Round 3 - Technical 

(1 Question)

  • Q1. Technical Questions regarding quantification
Round 4 - HR 

(1 Question)

  • Q1. Salary discussion

I applied via Approached by Company and was interviewed before Jun 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Quantity Take off, BOQ Preparation and Current Market Prices of Civil Materials
Round 3 - One-on-one 

(1 Question)

  • Q1. Final Round With Site DGM

Interview Preparation Tips

Interview preparation tips for other job seekers - Simple Questions if you know the answers then you keep on Continuing if not don't waste interviewers time..

DTC Projects Interview FAQs

How many rounds are there in DTC Projects Quantity Surveyor and Billing Engineer interview?
DTC Projects interview process usually has 4 rounds. The most common rounds in the DTC Projects interview process are Technical, Resume Shortlist and Behavioral.
What are the top questions asked in DTC Projects Quantity Surveyor and Billing Engineer interview?

Some of the top questions asked at the DTC Projects Quantity Surveyor and Billing Engineer interview -

  1. What is the formula of cutting length of helical stirru...read more
  2. How much deduction is made at the time of shuttering work measureme...read more
  3. How much quantity of putty required for 1 sqm wo...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 422 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
GAMMON INDIA Interview Questions
3.8
 • 29 Interviews
Essar Group Interview Questions
3.7
 • 28 Interviews
DRA Homes Interview Questions
4.6
 • 23 Interviews
View all

DTC Projects Quantity Surveyor and Billing Engineer Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

4.0

Skill development

4.0

Work-life balance

4.0

Salary

4.0

Job security

4.0

Company culture

4.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Civil Site Engineer
11 salaries
unlock blur

₹3 L/yr - ₹5 L/yr

Executive Accountant
10 salaries
unlock blur

₹1.9 L/yr - ₹4.2 L/yr

Senior Accountant
9 salaries
unlock blur

₹3.5 L/yr - ₹5.8 L/yr

Process Coordinator
9 salaries
unlock blur

₹2 L/yr - ₹3 L/yr

Facility Manager
8 salaries
unlock blur

₹3.8 L/yr - ₹6 L/yr

Explore more salaries
Compare DTC Projects with

Tata Projects

4.2
Compare

Larsen & Toubro Limited

4.0
Compare

Hindustan Construction Company

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview