Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by DTC Projects Team. If you also belong to the team, you can get access from here

DTC Projects Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

DTC Projects Jr Civil Site Engineer Interview Questions and Answers

Updated 11 Feb 2025

DTC Projects Jr Civil Site Engineer Interview Experiences

1 interview found

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is the lapping zone in a column?
  • Q2. What are the BOM specifications for VDF flooring?

Interview Preparation Tips

Interview preparation tips for other job seekers - It is not difficult; simply study the fundamentals of civil engineering.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Execution process
  • Q2. Building rules and laws

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare yourself
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Weight of steel and calculate the weight of steel in a structure given
  • Ans. 

    Calculate the weight of steel in a structure based on its dimensions and density

    • Determine the dimensions of the steel components (length, width, height)

    • Calculate the volume of each steel component using the formula: Volume = Length x Width x Height

    • Multiply the volume of each steel component by the density of steel (usually around 7850 kg/m^3) to get the weight

    • Sum up the weights of all steel components to get the total

  • Answered by AI
  • Q2. About previous work experience
Round 2 - HR 

(2 Questions)

  • Q1. Salary negotiation
  • Q2. About previous company roles and responsibilities and this company roles and responsibilities.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well in technical and site progress and site activities from the basement to finishing work.
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

The aptitude test consists of logical reasoning, quantity and time related questions. The questions aren't that difficult if prepared well.

Round 2 - Technical 

(1 Question)

  • Q1. The technical section consisted of questions from core branch i.e. Civil related. Most questions were on structures, steel required, and building materials.

Interview Preparation Tips

Topics to prepare for Marathon Realty Civil Engineer interview:
  • Building Construction
  • Quantity Estimation
  • Concrete Technology
Interview preparation tips for other job seekers - The company has a 3 year bond policy where you can't leave the company in between. The first year is trainee period where you'd be working in different departments on different roles. There is no choice of role or department to select, you've to work in any department. The annual CTC is of 3.12 Lpa.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Introduction youre self
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
-
Result
Selected Selected

I applied via Walk-in

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Maivan work know waterproofing work check, brick work, plastering, painting, putty, primary , gypsum work know, falceling, tile marvel, granite, wooden work know, upvc mep railing scating work check,
  • Q2. Any question & answer i can speak

Interview Preparation Tips

Interview preparation tips for other job seekers - I can speak English, hindi, odia, finishing work total know, stacher
My present company my home group
My pvc company aparna construction
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Which projects you had handled
Interview experience
3
Average
Difficulty level
Hard
Process Duration
-
Result
No response

I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Formal Quations about your woork
Round 3 - Technical 

(1 Question)

  • Q1. Regarding Finishing and RCC work.

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep giving interview
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(6 Questions)

  • Q1. Asked about family background and overall experiences previously. Current CTC reason to leaveing the last branded firm Lodha group.
  • Ans. 

    How many children and studying in class?

  • Answered Anonymously
  • Q2. About the working day.
  • Q3. Asked about family members.
  • Q4. Living location and how many dependent.
  • Ans. 

    I currently live in New York City with my spouse and two children.

    • Living in New York City with spouse and two children

    • Total of four dependents including spouse and two children

  • Answered by AI
  • Q5. Finally the positive response received from the team.
  • Ans. 

    Yes , after successful interview round, received offer letter from the company and same day replied.

  • Answered Anonymously
  • Q6. After completing the interview process ,same day received the offer letter.
  • Ans. 

    Yes , after successful interview round, received offer.

  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good supporting senior and company culture.
Fast growing company in the real estate industry.

Interview Questionnaire 

2 Questions

  • Q1. Execution of Steel and Shuttering
  • Ans. 

    Execution of steel and shuttering involves the proper planning, design, and installation of these materials for construction projects.

    • Steel reinforcement bars must be placed in the correct location and spacing to ensure structural integrity.

    • Shuttering must be properly designed and installed to create the desired shape and size of concrete structures.

    • Both steel and shuttering must be inspected regularly to ensure they a...

  • Answered by AI
  • Q2. Concrete Mix Design

DTC Projects Interview FAQs

How many rounds are there in DTC Projects Jr Civil Site Engineer interview?
DTC Projects interview process usually has 1 rounds. The most common rounds in the DTC Projects interview process are Technical.
What are the top questions asked in DTC Projects Jr Civil Site Engineer interview?

Some of the top questions asked at the DTC Projects Jr Civil Site Engineer interview -

  1. What are the BOM specifications for VDF floori...read more
  2. What is the lapping zone in a colu...read more

Tell us how to improve this page.

DTC Projects Jr Civil Site Engineer Interview Process

based on 1 interview

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 420 Interviews
GMR Group Interview Questions
4.1
 • 80 Interviews
GAMMON INDIA Interview Questions
3.9
 • 29 Interviews
Essar Group Interview Questions
3.8
 • 28 Interviews
DRA Homes Interview Questions
4.6
 • 22 Interviews
View all
Civil Site Engineer
11 salaries
unlock blur

₹3 L/yr - ₹5 L/yr

Executive Accountant
10 salaries
unlock blur

₹1.9 L/yr - ₹4.2 L/yr

Senior Accountant
9 salaries
unlock blur

₹3.5 L/yr - ₹5.8 L/yr

Process Coordinator
9 salaries
unlock blur

₹2 L/yr - ₹3 L/yr

Facility Manager
8 salaries
unlock blur

₹3.8 L/yr - ₹6 L/yr

Explore more salaries
Compare DTC Projects with

Tata Projects

4.2
Compare

Larsen & Toubro Limited

4.0
Compare

Hindustan Construction Company

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview