Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by JP Infra Team. If you also belong to the team, you can get access from here

JP Infra Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

JP Infra Project Engineer - Civil Interview Questions and Answers

Updated 4 Aug 2023

JP Infra Project Engineer - Civil Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(6 Questions)

  • Q1. Asked about family background and overall experiences previously. Current CTC reason to leaveing the last branded firm Lodha group.
  • Ans. 

    How many children and studying in class?

  • Answered Anonymously
  • Q2. About the working day.
  • Q3. Asked about family members.
  • Q4. Living location and how many dependent.
  • Ans. 

    I currently live in New York City with my spouse and two children.

    • Living in New York City with spouse and two children

    • Total of four dependents including spouse and two children

  • Answered by AI
  • Q5. Finally the positive response received from the team.
  • Ans. 

    Yes , after successful interview round, received offer letter from the company and same day replied.

  • Answered Anonymously
  • Q6. After completing the interview process ,same day received the offer letter.
  • Ans. 

    Yes , after successful interview round, received offer.

  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good supporting senior and company culture.
Fast growing company in the real estate industry.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Campus Placement and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is density of steel
  • Ans. 

    The density of steel is approximately 7.85 grams per cubic centimeter.

    • The density of steel is a measure of how much mass is contained in a given volume of steel.

    • It is commonly expressed in grams per cubic centimeter (g/cm³) or kilograms per cubic meter (kg/m³).

    • The density of steel can vary depending on the specific type and composition of the steel alloy.

    • For example, the density of carbon steel is typically around 7.85...

  • Answered by AI
  • Q2. Why men is dominant in site work than women?
  • Ans. 

    Men are dominant in site work due to various societal and cultural factors.

    • Historically, construction and site work have been male-dominated industries.

    • Stereotypes and biases have led to fewer women pursuing careers in civil engineering and related fields.

    • Physical demands and safety concerns associated with site work may discourage some women from entering the field.

    • Lack of representation and mentorship for women in si...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed before Dec 2019.

Interview Questionnaire 

1 Question

  • Q1. Work experience
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jul 2023. There were 3 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Regarding my job experience
  • Q2. Regarding details of is codes and execution steps and procedures.
Round 2 - Aptitude Test 

General maths, logical reasoning

Round 3 - Technical 

(2 Questions)

  • Q1. As an engineer how will i execute the structures
  • Ans. 

    I will execute the structures by following the design plans, coordinating with various teams, ensuring quality control, and adhering to safety regulations.

    • Follow the design plans provided by the structural engineers

    • Coordinate with other teams such as architects, contractors, and subcontractors

    • Ensure quality control throughout the construction process

    • Adhere to safety regulations and standards

    • Regularly inspect the constr...

  • Answered by AI
  • Q2. What are the hurdles we face while execution
  • Ans. 

    Some hurdles in execution include delays, budget constraints, unforeseen site conditions, and coordination issues.

    • Delays in obtaining permits or approvals

    • Budget constraints leading to value engineering or scope reductions

    • Unforeseen site conditions such as poor soil quality or environmental issues

    • Coordination issues with subcontractors or other project stakeholders

  • Answered by AI

Skills evaluated in this interview

I applied via Walk-in and was interviewed in Apr 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Tell me about yourself
  • Q2. Estimate ,Rate analysis, Quantity takeoff and bbs
Round 3 - HR 

(2 Questions)

  • Q1. Previous company details
  • Q2. And why did left your previous company

Interview Preparation Tips

Interview preparation tips for other job seekers - BE CONFIDENT AND POSITIVE.
Be through with your basics.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Written/Aptitude test: The first round for most of the companies is written round. ...

Round 3 - Technical 

(4 Questions)

  • Q1. Technical interview Round: The next round is a technical interview
  • Q2. 1.Concrete batch time which temperature of heat produced
  • Ans. 

    Concrete batch time affects the temperature of heat produced during the curing process.

    • The batch time of concrete refers to the duration for which the concrete ingredients are mixed together.

    • A longer batch time can lead to higher temperatures being produced during the curing process.

    • The heat generated during curing is important as it affects the strength and durability of the concrete.

    • Proper monitoring and control of b...

  • Answered by AI
  • Q3. Types of footing
  • Ans. 

    Types of footing include spread footings, mat foundations, pile foundations, and drilled caissons.

    • Spread footings are used for shallow foundations and distribute the load over a larger area.

    • Mat foundations are used for heavy loads and distribute the load over a larger area.

    • Pile foundations are used when soil conditions are poor and transfer the load to deeper, more stable soil layers.

    • Drilled caissons are used for heavy...

  • Answered by AI
  • Q4. Bricks absorb water
  • Ans. 

    Yes, bricks absorb water due to their porous nature.

    • Bricks have small pores that allow water to seep in.

    • Water absorption can lead to deterioration of bricks over time.

    • Bricks with high absorption rates may not be suitable for certain climates or applications.

  • Answered by AI
Round 4 - One-on-one 

(2 Questions)

  • Q1. For technical questions
  • Q2. Work experience will be explain

Interview Preparation Tips

Interview preparation tips for other job seekers - Develope to your field experience 👍
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

General knowledge skills

Round 2 - Technical 

(5 Questions)

  • Q1. Your previous company experience
  • Ans. 

    Worked as a Project Engineer at a construction company for 5 years.

    • Managed multiple civil engineering projects simultaneously

    • Coordinated with architects, contractors, and clients to ensure project success

    • Performed site inspections and quality control checks

    • Prepared project schedules and budgets

    • Resolved any issues or conflicts that arose during construction

  • Answered by AI
  • Q2. Asking your previous work experience
  • Q3. Structure related questions
  • Q4. Finishing related question
  • Q5. Water proofing related question and Bbs

Interview Preparation Tips

Interview preparation tips for other job seekers - Development your technical knowledge
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Civil engineer 

(2 Questions)

  • Q1. Block work, plastering, putty, painting, gypsum, Tile,
  • Q2. Block work plastering putty , painting , gypsum, tile marble,

Interview Preparation Tips

Interview preparation tips for other job seekers - Every question I can speak
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
4-6 weeks
Result
Selected Selected

I was interviewed before Feb 2024.

Round 1 - Technical 

(3 Questions)

  • Q1. What is solder pilling?
  • Ans. 

    Solder pilling is a defect in solder joints where small balls of solder form on the surface due to incomplete wetting.

    • Solder pilling occurs when there is insufficient flux to remove oxides from the surface of the joint.

    • It can also be caused by inadequate soldering temperature or time, leading to incomplete wetting of the joint.

    • Solder pilling can weaken the joint and lead to reliability issues in electronic components.

    • P...

  • Answered by AI
  • Q2. What is D-wall?
  • Ans. 

    D-wall is a term used in construction industry to refer to a type of retaining wall made of concrete or other materials.

    • D-wall stands for diaphragm wall, which is a reinforced concrete wall constructed in the ground using a narrow trench excavation method.

    • It is commonly used in deep excavation projects to provide support and prevent soil movement.

    • D-wall construction involves excavating a trench, installing reinforcemen...

  • Answered by AI
  • Q3. What is the GFRP & where we use?
  • Ans. 

    GFRP stands for Glass Fiber Reinforced Polymer, used in construction for its high strength and corrosion resistance.

    • GFRP is a composite material made of glass fibers embedded in a polymer matrix.

    • It is commonly used in construction for reinforcing concrete structures, such as bridges, buildings, and tunnels.

    • GFRP offers high strength-to-weight ratio, corrosion resistance, and durability.

    • Examples of GFRP applications incl

  • Answered by AI
Round 2 - Behavioral 

(2 Questions)

  • Q1. What is S-Curve?
  • Ans. 

    S-Curve is a graphical representation of the growth of a project or product over time, showing slow initial progress, rapid growth, and eventual leveling off.

    • S-Curve is commonly used in project management to track the progress of a project.

    • It shows the relationship between time and cumulative costs or work completed.

    • The curve starts slowly as the project begins, then accelerates as work is being done efficiently, and f...

  • Answered by AI
  • Q2. Define Critical activity?
  • Ans. 

    Critical activity is a task or process that is essential for the success of a project or operation.

    • Critical activities have a direct impact on the overall timeline and success of a project.

    • They often have dependencies on other tasks and must be completed on time to avoid delays.

    • Examples include testing phase in software development, finalizing budget in project management, and surgery in healthcare.

    • Identifying critical...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Why are you worked with us?
  • Ans. 

    I have always admired the company's commitment to innovation and growth.

    • I have been following the company's progress and success for a while.

    • I believe in the company's values and vision.

    • I am excited about the opportunity to contribute to the company's future development.

  • Answered by AI
  • Q2. What is your strength?
  • Ans. 

    My strengths include strong leadership skills, excellent communication abilities, and a proven track record of achieving results.

    • Strong leadership skills

    • Excellent communication abilities

    • Proven track record of achieving results

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare your self with better & better knowledge for the interview because chances are never repeated.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Technical brief about last role
  • Ans. 

    Managed technical operations for a team of engineers, overseeing project timelines and deliverables.

    • Led a team of engineers in executing technical projects

    • Monitored project timelines and ensured deliverables were met

    • Collaborated with cross-functional teams to address technical challenges

    • Implemented process improvements to enhance efficiency

  • Answered by AI

JP Infra Interview FAQs

How many rounds are there in JP Infra Project Engineer - Civil interview?
JP Infra interview process usually has 2 rounds. The most common rounds in the JP Infra interview process are HR and Resume Shortlist.
What are the top questions asked in JP Infra Project Engineer - Civil interview?

Some of the top questions asked at the JP Infra Project Engineer - Civil interview -

  1. Living location and how many depende...read more
  2. After completing the interview process ,same day received the offer lett...read more
  3. Finally the positive response received from the te...read more

Tell us how to improve this page.

JP Infra Project Engineer - Civil Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Assistant Manager
54 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Sales Executive
35 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Executive
22 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
20 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Engineer
19 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare JP Infra with

Godrej Properties

3.7
Compare

Prestige Group

4.3
Compare

Sobha

3.9
Compare

DLF

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview