Q1. What is the procedure for lift installation?

Ans.

The procedure for lift installation involves several steps including site preparation, equipment delivery, installation of guide rails and car frame, electrical and mechanical connections, and testing.

  • Site preparation including excavation and foundation work

  • Delivery of equipment including guide rails, car frame, and lift machinery

  • Installation of guide rails and car frame

  • Electrical and mechanical connections including wiring and control systems

  • Testing and commissioning of the ...read more

Q2. WHAT IS THE CAPACITY OF THE 1 MLD WATER TREATMENT PLANT?

Ans.

The capacity of the 1 MLD water treatment plant is 1 million liters per day.

  • The capacity of the water treatment plant is measured in terms of the volume of water it can treat per day.

  • MLD stands for Million Liters per Day.

  • In this case, the 1 MLD water treatment plant has a capacity to treat 1 million liters of water per day.

Q3. How to safety device works on transformer?

Ans.

Safety devices on transformers protect against overloading and overheating.

  • Safety devices include fuses, circuit breakers, and thermal protectors.

  • Fuses are designed to melt and break the circuit when the current exceeds a certain level.

  • Circuit breakers trip and open the circuit when the current exceeds a certain level.

  • Thermal protectors sense the temperature and disconnect the transformer when it exceeds a certain level.

  • These devices prevent damage to the transformer and ensu...read more

Q4. How to verify the contractor bill?

Ans.

Verify contractor bill by checking quantities, rates, and work done.

  • Check quantities of materials used

  • Verify rates charged for each item

  • Ensure work done matches the bill

  • Compare bill with contract terms

  • Check for any discrepancies or errors

  • Request supporting documents if necessary

Are these interview questions helpful?

Q5. Types of transformer and use of particular type?

Ans.

Transformers are of two types - Step-up and Step-down. Step-up transformers increase voltage while Step-down transformers decrease voltage.

  • Step-up transformers are used in power plants to increase voltage for transmission over long distances.

  • Step-down transformers are used in households to decrease voltage for safe use.

  • Other types of transformers include isolation transformers, autotransformers, and instrument transformers.

  • Isolation transformers are used to isolate a circuit ...read more

Q6. Conductor load caring capacity?

Ans.

Conductor load carrying capacity refers to the maximum amount of electrical current that a conductor can safely carry without overheating or causing damage.

  • The load carrying capacity of a conductor depends on its size, material, and insulation.

  • The National Electrical Code (NEC) provides tables and formulas to calculate the maximum current a conductor can carry.

  • Factors such as ambient temperature, installation method, and voltage drop also affect the load carrying capacity of ...read more

Share interview questions and help millions of jobseekers 🌟

man-with-laptop

Q7. WHAT IS SOFT STARTET?

Ans.

A soft starter is a device used to gradually start and stop the motor of an electrical system, reducing mechanical stress and energy consumption.

  • Soft starters are commonly used in HVAC systems, pumps, and conveyor belts.

  • They provide a smooth and controlled acceleration and deceleration of the motor.

  • Soft starters help in reducing electrical and mechanical stress on the motor and connected equipment.

  • They can also improve energy efficiency by reducing the inrush current during m...read more

Q8. Height of washbasin?

Ans.

The height of a washbasin should be between 800mm to 850mm from the finished floor level.

  • The height of the washbasin should be comfortable for the user to use.

  • It should be installed at a height that allows for easy access to the faucet and drain.

  • The height should also be appropriate for the type of users, such as children or wheelchair users.

  • The height can vary depending on the type of washbasin and the location of installation.

  • The height should be considered in relation to t...read more

Project Engineer MEP Jobs

Project Engineer MEP - Costing 2-6 years
Vconstruct
4.0
Pune
Project Engineer-MEP 7-12 years
HiLITE Builders
4.5
Kannur
PROJECT ENGINEER MEP 7-12 years
Hostech PMC Pvt Ltd
3.9
Kochi

Q9. Type of Chillers

Ans.

Chillers are used in HVAC systems to cool air or water by removing heat through a vapor-compression or absorption refrigeration cycle.

  • Chillers can be classified based on the type of compressor used, such as centrifugal, reciprocating, screw, or scroll compressors.

  • Another classification is based on the type of condenser, such as air-cooled or water-cooled chillers.

  • Chillers can also be categorized based on the refrigerant used, such as R-134a, R-410A, or ammonia.

  • Some examples o...read more

Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary

Project Engineer MEP Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
65 L+

Reviews

4 L+

Interviews

4 Cr+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter