Tiles are laid following the arrows behind them to ensure proper alignment and pattern continuity.
Arrows indicate the direction in which the pattern on the tiles should be aligned.
Following the arrows helps maintain consistency in the pattern layout.
It ensures that the tiles are installed in the correct orientation for a visually appealing finish.
Tiles are laid by spreading adhesive on the surface and then placing the tiles in a desired pattern. They are leveled using a spirit level to ensure a flat surface.
Spread adhesive on the surface evenly
Place tiles in desired pattern, starting from the center and working outwards
Use a spirit level to ensure tiles are level and flat
Make adjustments as needed to maintain levelness
Allow adhesive to dry before grouting the t
I applied via Approached by Company and was interviewed in Aug 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in May 2024. There were 3 interview rounds.
I applied via LinkedIn and was interviewed in Oct 2023. There was 1 interview round.
Yes, FIDIC stands for International Federation of Consulting Engineers and is a set of contract templates commonly used in the construction industry.
FIDIC stands for International Federation of Consulting Engineers
It provides standard contract templates for construction projects
FIDIC contracts are commonly used in the construction industry worldwide
PS Group interview questions for popular designations
I applied via Approached by Company and was interviewed in Dec 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.
I applied via Job Portal and was interviewed before Mar 2023. There were 3 interview rounds.
STP stands for Sewage Treatment Plant, which is used to treat wastewater before releasing it back into the environment.
There are different types of STPs such as activated sludge process, sequencing batch reactor, and membrane bioreactor.
The type of STP used depends on factors like the volume of wastewater to be treated, space availability, and treatment requirements.
For example, an activated sludge process is commonly ...
I applied via Walk-in and was interviewed in May 2022. There were 3 interview rounds.
I applied via Referral and was interviewed before Aug 2022. There were 3 interview rounds.
ld stands for lap length. Minimum diameter of steel for column depends on the load and design requirements.
ld stands for lap length, which is the length of overlap required for splicing reinforcement bars.
Minimum diameter of steel for column is determined based on the load carrying capacity and design specifications.
The minimum diameter of steel for a column can vary depending on factors such as the type of column, the
I applied via Approached by Company and was interviewed in Nov 2021. There were 2 interview rounds.
The minimum slope for drainage pipe should be 1/4 inch per foot.
The slope ensures proper flow of water and prevents clogging.
The slope may vary depending on the type of pipe and the material used.
The slope should be checked during installation and adjusted if necessary.
A slope of 1/8 inch per foot may be acceptable for larger pipes.
The slope should always be towards the main drain or sewer line.
Top trending discussions
The duration of PS Group interview process can vary, but typically it takes about 2-4 weeks to complete.
based on 14 interviews
Interview experience
based on 129 reviews
Rating in categories
Civil Site Engineer
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Supervisor
16
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
15
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
10
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Site Engineer
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Group
Reliance Industries
Aditya Birla Group
Mahindra & Mahindra