Add office photos
PS Group logo
Employer?
Claim Account for FREE

PS Group

3.8
based on 131 Reviews

PS Group Interview Questions and Answers

Updated 15 Apr 2024

Q1. Why tiles are layed following the arrows behind the tiles

Ans.

Tiles are laid following the arrows behind them to ensure proper alignment and pattern continuity.

  • Arrows indicate the direction in which the pattern on the tiles should be aligned.

  • Following the arrows helps maintain consistency in the pattern layout.

  • It ensures that the tiles are installed in the correct orientation for a visually appealing finish.

Add your answer
right arrow

Q2. How the tiles are layed and leveled

Ans.

Tiles are laid by spreading adhesive on the surface and then placing the tiles in a desired pattern. They are leveled using a spirit level to ensure a flat surface.

  • Spread adhesive on the surface evenly

  • Place tiles in desired pattern, starting from the center and working outwards

  • Use a spirit level to ensure tiles are level and flat

  • Make adjustments as needed to maintain levelness

  • Allow adhesive to dry before grouting the tiles

Add your answer
right arrow

Q3. what should be the minimum slope for drainage pipe

Ans.

The minimum slope for drainage pipe should be 1/4 inch per foot.

  • The slope ensures proper flow of water and prevents clogging.

  • The slope may vary depending on the type of pipe and the material used.

  • The slope should be checked during installation and adjusted if necessary.

  • A slope of 1/8 inch per foot may be acceptable for larger pipes.

  • The slope should always be towards the main drain or sewer line.

Add your answer
right arrow

Q4. Which type of STP

Ans.

STP stands for Sewage Treatment Plant, which is used to treat wastewater before releasing it back into the environment.

  • There are different types of STPs such as activated sludge process, sequencing batch reactor, and membrane bioreactor.

  • The type of STP used depends on factors like the volume of wastewater to be treated, space availability, and treatment requirements.

  • For example, an activated sludge process is commonly used for municipal wastewater treatment, while a membrane ...read more

Add your answer
right arrow
Discover PS Group interview dos and don'ts from real experiences

Q5. What is ld? Minimum dia of steel for column?

Ans.

ld stands for lap length. Minimum diameter of steel for column depends on the load and design requirements.

  • ld stands for lap length, which is the length of overlap required for splicing reinforcement bars.

  • Minimum diameter of steel for column is determined based on the load carrying capacity and design specifications.

  • The minimum diameter of steel for a column can vary depending on factors such as the type of column, the material used, and the structural requirements.

Add your answer
right arrow

Q6. Do you understand fidic

Ans.

Yes, FIDIC stands for International Federation of Consulting Engineers and is a set of contract templates commonly used in the construction industry.

  • FIDIC stands for International Federation of Consulting Engineers

  • It provides standard contract templates for construction projects

  • FIDIC contracts are commonly used in the construction industry worldwide

Add your answer
right arrow
Contribute & help others!
Write a review
Write a review
Share interview
Share interview
Contribute salary
Contribute salary
Add office photos
Add office photos

Interview Process at PS Group

based on 14 interviews
Interview experience
4.6
Excellent
View more
interview tips and stories logo
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

Oracle Logo
3.7
 • 643 Interview Questions
Mahindra & Mahindra Logo
4.1
 • 401 Interview Questions
Maruti Suzuki Logo
4.2
 • 370 Interview Questions
ITC Logo
3.9
 • 212 Interview Questions
Dell Logo
4.0
 • 199 Interview Questions
Samvardhana Motherson Group Logo
3.7
 • 142 Interview Questions
View all
Recently Viewed
SALARIES
Photon Interactive
No Salaries
SALARIES
Grasim Industries
LIST OF COMPANIES
PS Group
Locations
SALARIES
Allstate
DESIGNATION
SALARIES
Grasim Industries
INTERVIEWS
PS Group
No Interviews
INTERVIEWS
Novel Office
No Interviews
JOBS
Novel Office
No Jobs
INTERVIEWS
Runwal Group
No Interviews
Top PS Group Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
play-icon
play-icon
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
75 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter