I applied via Approached by Company and was interviewed in Nov 2021. There were 2 interview rounds.
The minimum slope for drainage pipe should be 1/4 inch per foot.
The slope ensures proper flow of water and prevents clogging.
The slope may vary depending on the type of pipe and the material used.
The slope should be checked during installation and adjusted if necessary.
A slope of 1/8 inch per foot may be acceptable for larger pipes.
The slope should always be towards the main drain or sewer line.
I applied via Campus Placement and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Referral and was interviewed before Jun 2021. There were 2 interview rounds.
I applied via Referral and was interviewed in Jan 2021. There were 5 interview rounds.
PS Group interview questions for popular designations
I applied via Company Website and was interviewed before Aug 2020. There were 6 interview rounds.
Top trending discussions
The duration of PS Group interview process can vary, but typically it takes about 2-4 weeks to complete.
based on 14 interviews
Interview experience
based on 129 reviews
Rating in categories
Civil Site Engineer
18
salaries
| ₹2.2 L/yr - ₹5 L/yr |
Site Supervisor
16
salaries
| ₹2 L/yr - ₹4.1 L/yr |
Site Engineer
15
salaries
| ₹3.4 L/yr - ₹6 L/yr |
Junior Engineer
10
salaries
| ₹3 L/yr - ₹4.4 L/yr |
Junior Site Engineer
8
salaries
| ₹2.4 L/yr - ₹4.2 L/yr |
Tata Group
Reliance Industries
Aditya Birla Group
Mahindra & Mahindra