Filter interviews by
I applied via LinkedIn and was interviewed before May 2023. There were 4 interview rounds.
1. Puzzle solving.
2. Psychological test.
Top trending discussions
posted on 29 May 2024
posted on 27 Dec 2022
I applied via Recruitment Consulltant and was interviewed in May 2022. There were 2 interview rounds.
posted on 28 Sep 2021
posted on 18 Feb 2022
I applied via LinkedIn and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Campus Placement
The test was based on logical reasoning and verbal reasoning.
EVM stands for Earned Value Management. It is a project management technique used to measure project performance and progress.
EVM integrates scope, schedule, and cost to provide a comprehensive view of project performance.
It compares the planned value (PV), earned value (EV), and actual cost (AC) to assess project health.
PV represents the budgeted cost of the work scheduled, EV represents the budgeted cost of the work ...
I applied via Approached by Company and was interviewed in Aug 2023. There were 2 interview rounds.
Activities in toilet area include personal hygiene, using the toilet, and cleaning.
Personal hygiene activities such as washing hands, brushing teeth, and showering
Using the toilet for urination and defecation
Cleaning activities such as wiping surfaces, changing toilet paper, and emptying trash
Maintenance tasks like unclogging drains or fixing leaks
Percentage of completion of a project can be calculated using the cost-to-cost method or milestone method.
Calculate %age of completion by comparing actual costs incurred to date with total estimated costs for the project.
Alternatively, %age of completion can be determined by tracking completion of specific project milestones.
Formula for cost-to-cost method: %age of completion = (Actual costs incurred / Total estimated ...
The sequence of tasks involves plumbing work, wall plastering, wall tiling, and flooring.
Start by completing the plumbing work in the walls and floors
Next, apply wall plaster to smoothen the surface
Then, install wall tiles for a decorative finish
Finally, proceed with the flooring installation
posted on 10 Jan 2023
I applied via campus placement at National Institute of Construction Management and Research, Pune and was interviewed in Dec 2022. There were 2 interview rounds.
posted on 2 Sep 2021
I applied via Recruitment Consultant and was interviewed in Aug 2021. There were 3 interview rounds.
based on 22 reviews
Rating in categories
Deputy Manager
616
salaries
| ₹6 L/yr - ₹16 L/yr |
Senior Engineer
427
salaries
| ₹4 L/yr - ₹12.2 L/yr |
Construction Engineer
303
salaries
| ₹2.4 L/yr - ₹10 L/yr |
Civil Site Engineer
227
salaries
| ₹1.5 L/yr - ₹9 L/yr |
Safety Officer
227
salaries
| ₹1.8 L/yr - ₹7.5 L/yr |
Tata Group
Reliance Industries
Adani Group
Mahindra & Mahindra