I applied via Walk-in and was interviewed in Mar 2024. There were 3 interview rounds.
Beam reinforcement can be checked by visually inspecting the placement, size, and spacing of the steel bars within the beam.
Visually inspect the placement of steel bars within the beam to ensure they are in the correct position as per the design drawings.
Check the size of the steel bars to ensure they meet the specifications outlined in the structural drawings.
Verify the spacing between the steel bars to ensure they ar...
The minimum diameter of rebar for a column depends on the structural design and load requirements.
The minimum diameter of rebar for a column is typically specified in the structural drawings or design documents.
Common minimum diameters for column rebars range from 12mm to 25mm, depending on the size and load-bearing capacity of the column.
The minimum diameter of rebar is important for ensuring the structural integrity ...
Cover of reinforcement of slab refers to the distance between the outer surface of the concrete and the reinforcement bars.
The cover of reinforcement is important for protecting the reinforcement from corrosion and ensuring structural integrity.
The typical cover of reinforcement for slabs is around 20-30mm, but it can vary depending on the design requirements.
Factors such as exposure conditions, concrete quality, and l...
Concrete quantity can be calculated by multiplying the volume of the area to be filled by the density of the concrete.
Calculate the volume of the area to be filled (length x width x height)
Determine the density of the concrete (usually around 2400 kg/m^3)
Multiply the volume by the density to get the total concrete quantity needed
Consider adding a percentage for wastage or spillage
There are various types of brick joints used in construction, such as flush joint, raked joint, weathered joint, and v-joint.
Flush joint is a joint where the mortar is flush with the face of the brick.
Raked joint is a joint where the mortar is recessed slightly from the face of the brick.
Weathered joint is a joint where the mortar is sloped to allow water to run off.
V-joint is a joint where the mortar is shaped like a
There are various types of bricks used in construction, such as clay bricks, concrete bricks, and fire bricks.
Clay bricks are made from clay and are commonly used for construction.
Concrete bricks are made from concrete and are known for their strength and durability.
Fire bricks are made to withstand high temperatures and are used in fireplaces and kilns.
Pressure vessel design involves the calculation of stresses, material selection, and safety factors to ensure the vessel can safely contain the desired pressure.
Consider the material properties and thickness to withstand the internal pressure
Calculate stresses using formulas like the thin-walled pressure vessel equation
Factor in safety margins to account for uncertainties in material properties or loading conditions
What people are saying about Larsen & Toubro Limited
Larsen & Toubro Limited interview questions for popular designations
I was interviewed in Dec 2024.
Which type work details explain
Which type responsibility in previous company.
Get interview-ready with Top Larsen & Toubro Limited Interview Questions
My previous company was a multinational technology company specializing in software solutions.
Developed and implemented sales strategies to increase revenue
Collaborated with cross-functional teams to meet client needs
Managed a portfolio of key accounts to drive customer satisfaction
General knowledge about yourself
Market Structure,Sales planning
Some of the top questions asked at the Larsen & Toubro Limited interview for experienced candidates -
The duration of Larsen & Toubro Limited interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 355 interviews
Interview experience
based on 18.8k reviews
Rating in categories
Assistant Manager
4.2k
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
3.4k
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
1.2k
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Construction Manager
1.2k
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
1.1k
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Group
Reliance Industries
Adani Group
Mahindra & Mahindra