I have 27 years of experience in various types of Water Treatment Plants including RO, UF, DM plants, filtration systems, erection, and commissioning.
Led the design and implementation of multiple RO plants for industrial clients
Managed the erection and commissioning of UF systems for municipal water treatment
Provided technical support for DM plant upgrades and optimization
Developed maintenance schedules for filtration
I have extensive experience with computer skills, including using the internet, CAD software, Microsoft Word, and Excel.
Proficient in using the internet for research, communication, and data gathering
Skilled in CAD software for designing and drafting engineering projects
Advanced knowledge of Microsoft Word for creating documents and reports
Expertise in Excel for data analysis, calculations, and creating spreadsheets
The typical duration of working hours for a Senior Engineer can range from 10 to 12 hours.
Working hours can vary depending on the company and project deadlines.
Senior Engineers may need to work longer hours during critical project phases.
Flexibility in working hours may be required to meet project milestones.
Balancing work-life is important to prevent burnout and maintain productivity.
I applied via AmbitionBox and was interviewed in Nov 2024. There were 4 interview rounds.
Management is fully supported in the department, providing resources and guidance to ensure success.
Management provides clear goals and expectations for the team
Regular check-ins and feedback sessions are conducted to support employee growth
Resources such as training programs and tools are readily available for employees
Management encourages open communication and collaboration among team members
I appeared for an interview in Feb 2025, where I was asked the following questions.
What people are saying about Larsen & Toubro Limited
I appeared for an interview in Mar 2025, where I was asked the following questions.
Cable laying involves planning, installation, and testing of electrical cables for efficient power distribution.
Conduct site surveys to determine the optimal cable route.
Select appropriate cable types based on voltage and environmental conditions, e.g., XLPE for underground installations.
Ensure compliance with local regulations and standards, such as NEC or IEC.
Implement proper cable handling techniques to avoid damage...
Cable termination involves connecting cables to devices or systems, ensuring reliable electrical connections.
Crimping: Used for connecting wires to terminals, often seen in automotive applications.
Soldering: A method where wires are melted together with solder, common in electronics.
Heat Shrink: Insulation applied over connections to protect against moisture and abrasion.
Connectorization: Involves using connectors for ...
Load calculation for cable termination involves assessing electrical loads to ensure safe and efficient connections.
Determine the total load: Sum all connected devices' power ratings (e.g., lights, motors).
Consider voltage drop: Ensure voltage drop is within acceptable limits (typically < 3%).
Select appropriate cable size: Use NEC or IEC guidelines to choose cable gauge based on load and distance.
Account for ambient...
Larsen & Toubro Limited interview questions for popular designations
My planning process involves strategic analysis, stakeholder engagement, and iterative evaluation to ensure alignment with organizational goals.
Conduct a SWOT analysis to identify strengths, weaknesses, opportunities, and threats. For example, assessing market trends before launching a product.
Engage stakeholders through workshops and meetings to gather insights and align objectives. For instance, collaborating with de...
Faced a major operational crisis that threatened project deadlines; implemented strategic changes to resolve it effectively.
Identified a critical supply chain disruption affecting project timelines.
Collaborated with cross-functional teams to assess the impact and develop contingency plans.
Negotiated with alternative suppliers to secure necessary materials within tight deadlines.
Implemented a revised project management ...
Get interview-ready with Top Larsen & Toubro Limited Interview Questions
I applied via Approached by Company and was interviewed in Nov 2024. There was 1 interview round.
Power transformer installation involves several steps to ensure proper functioning and safety.
Selecting a suitable location for the transformer based on factors like accessibility, ventilation, and safety regulations
Preparing the foundation for the transformer to ensure stability and proper weight distribution
Transporting the transformer to the installation site using appropriate equipment and following safety protocol...
Various tests are performed on transformers to ensure their proper functioning and safety.
Insulation resistance test to check for any insulation breakdown
Turns ratio test to verify the turns ratio of primary and secondary windings
Polarity test to ensure correct polarity of windings
Winding resistance test to measure the resistance of windings
Dielectric strength test to check the insulation strength under high voltage
Sho...
IS 2911 is the IS Code for Piling work in India.
IS 2911:2010 is the Indian Standard code for Design and Construction of Pile Foundations.
It covers various aspects of piling work including types of piles, materials, design considerations, construction methods, testing, and quality control.
Adherence to IS 2911 ensures that piling work is carried out in a safe and efficient manner.
I will investigate the possible reasons for the low compressive strength and take corrective actions.
Investigate the concrete mix design and materials used
Check the curing process and conditions
Inspect the testing procedures and equipment for accuracy
Consult with concrete experts or structural engineers for advice
Implement corrective measures such as adjusting mix proportions or improving curing methods
I applied via Referral and was interviewed in Oct 2024. There were 5 interview rounds.
An update survey is a follow-up survey conducted to gather new information or verify existing data.
Update surveys are typically conducted to assess changes in a project site or to verify previous survey data.
They may involve measuring new structures, boundaries, or features that were not included in the original survey.
Update surveys help ensure that project plans and estimates are accurate and up-to-date.
Examples of u...
Iam not interested in my office, but Side.
No education and me in my school.
I applied via Naukri.com and was interviewed in Dec 2024. There were 2 interview rounds.
I appeared for an interview in Feb 2025, where I was asked the following questions.
Some of the top questions asked at the Larsen & Toubro Limited interview for experienced candidates -
The duration of Larsen & Toubro Limited interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 415 interviews
Interview experience
based on 19.3k reviews
Rating in categories
Assistant Manager
3.9k
salaries
| ₹5.3 L/yr - ₹18.4 L/yr |
Senior Engineer
3.5k
salaries
| ₹4.5 L/yr - ₹12.5 L/yr |
Engineer
1.3k
salaries
| ₹1.6 L/yr - ₹9.5 L/yr |
Manager
1.1k
salaries
| ₹9 L/yr - ₹29 L/yr |
Civil Engineer
1k
salaries
| ₹2.2 L/yr - ₹11 L/yr |
Tata Projects
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Kalpataru Projects International