i
Larsen & Toubro Limited
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via AmbitionBox and was interviewed in Nov 2024. There were 4 interview rounds.
Management is fully supported in the department, providing resources and guidance to ensure success.
Management provides clear goals and expectations for the team
Regular check-ins and feedback sessions are conducted to support employee growth
Resources such as training programs and tools are readily available for employees
Management encourages open communication and collaboration among team members
posted on 3 Aug 2023
posted on 15 Feb 2023
I was interviewed in Jan 2023.
HT ELCTRICALE HT,RM,VCB,CABALE INSULET JOINT,LT INDUSTRI CONTROL PYANAL WAIRING AND ALL ELECTRICALE SERVESE MENTAINENS
The question is asking about how a VCB (Vacuum Circuit Breaker) works for high voltage (HT) applications.
VCB is a type of circuit breaker that uses vacuum as the arc quenching medium.
It is commonly used in high voltage applications to interrupt or isolate electrical circuits.
When the VCB is closed, the contacts are in physical contact, allowing the current to flow.
When the VCB is opened, the contacts are separated, cre...
LT HOW TO USE is a question about the proper usage of LT (Low Tension) equipment.
Read the user manual or instructions provided by the manufacturer.
Ensure proper installation and grounding of the LT equipment.
Follow safety protocols and use personal protective equipment (PPE) when working with LT equipment.
Regularly inspect and maintain the LT equipment to ensure its optimal performance.
Train and educate yourself on the...
I was interviewed before Feb 2024.
I like to work again new place and learn some good technical thinks
posted on 25 Aug 2021
I was interviewed in Jul 2021.
posted on 27 Dec 2020
posted on 14 Dec 2019
Pressure parts in boiler shutdown are inspected and maintained to ensure safe and efficient operation.
Pressure parts include boiler tubes, headers, and drums.
During shutdown, pressure parts are inspected for signs of wear, corrosion, and damage.
Maintenance tasks may include cleaning, repairing, or replacing pressure parts as needed.
Proper maintenance of pressure parts is crucial for preventing accidents and ensuring ef
posted on 10 Jul 2024
posted on 25 Jan 2024
I applied via Approached by Company and was interviewed before Jan 2023. There was 1 interview round.
based on 2 interviews
Interview experience
based on 3 reviews
Rating in categories
Assistant Manager
3.9k
salaries
| ₹6.5 L/yr - ₹18 L/yr |
Senior Engineer
3.5k
salaries
| ₹3.8 L/yr - ₹13 L/yr |
Manager
1.3k
salaries
| ₹9 L/yr - ₹30 L/yr |
Engineer
1.2k
salaries
| ₹1.6 L/yr - ₹9 L/yr |
Assistant Construction Manager
1.2k
salaries
| ₹6 L/yr - ₹21 L/yr |
Tata Group
Reliance Industries
Adani Group
Mahindra & Mahindra