Assistant Qa Qc Manager
Assistant Qa Qc Manager Interview Questions and Answers
Q1. What will you do when 28 days cube compressive strength is found less than required?
I will investigate the possible reasons for the low compressive strength and take corrective actions.
Investigate the concrete mix design and materials used
Check the curing process and conditions
Inspect the testing procedures and equipment for accuracy
Consult with concrete experts or structural engineers for advice
Implement corrective measures such as adjusting mix proportions or improving curing methods
Q2. What is the IS Code for Piling work?
IS 2911 is the IS Code for Piling work in India.
IS 2911:2010 is the Indian Standard code for Design and Construction of Pile Foundations.
It covers various aspects of piling work including types of piles, materials, design considerations, construction methods, testing, and quality control.
Adherence to IS 2911 ensures that piling work is carried out in a safe and efficient manner.
Q3. Lean Six Sigma Methodology
Lean Six Sigma is a methodology that combines Lean principles and Six Sigma techniques to improve processes and reduce waste.
Focuses on eliminating waste and improving efficiency
Uses data-driven approach to identify and solve problems
Involves continuous improvement and customer focus
Combines Lean principles (eliminating waste) with Six Sigma techniques (reducing variation)
Example: Using DMAIC (Define, Measure, Analyze, Improve, Control) process for problem-solving
Interview Questions of Similar Designations
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month