Add office photos
Engaged Employer

Larsen & Toubro Limited

4.0
based on 17.9k Reviews
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by

30+ Studio Waamh Interview Questions and Answers

Updated 19 Dec 2024
Popular Designations

Q1. What is the unit weight of concrete and steel dia wise

Ans.

The unit weight of concrete and steel varies based on diameter.

  • Unit weight of concrete varies from 22 to 25 kN/m3

  • Unit weight of steel varies from 7850 to 8000 kg/m3

  • For example, the unit weight of 10mm steel is 0.617 kg/m and 20mm steel is 2.469 kg/m

  • Similarly, the unit weight of M20 grade concrete is 25 kN/m3

View 11 more answers

Q2. How much steel is required for 1000cum concrete.

Ans.

The amount of steel required for 1000 cubic meters of concrete depends on the type and design of the concrete.

  • The steel reinforcement in concrete is typically measured in terms of weight per unit volume of concrete.

  • The amount of steel required can vary based on factors such as the strength of the concrete, the type of structure, and the design requirements.

  • Steel reinforcement is commonly expressed as a percentage of the volume of concrete, known as the reinforcement ratio.

  • For...read more

View 3 more answers

Q3. How many carpenters are required for 3000cum concreting

Ans.

The number of carpenters required for 3000cum concreting depends on the size of the project and the speed of the carpenters.

  • The size of the project and the speed of the carpenters are important factors in determining the number of carpenters required.

  • The type of formwork being used can also affect the number of carpenters needed.

  • On average, one carpenter can complete 4-5 cubic meters of formwork per day.

  • Assuming an average of 4.5 cubic meters per day per carpenter, 3000 cubic...read more

Add your answer

Q4. What is BOQ? What are the grades of concrete? What is well foundation? What is the method of boring in pile foundation used?

Ans.

BOQ is Bill of Quantities used in construction projects. Grades of concrete are M5, M7.5, M10, M15, M20, M25, M30, M35, M40, M45, M50, M55, M60. Well foundation is a type of deep foundation used to support heavy loads. Boring method in pile foundation is used to create a hole in the ground for the pile to be inserted.

  • BOQ is a document that lists the type and quantity of materials required for a construction project.

  • Grades of concrete are determined by the strength of the conc...read more

Add your answer
Discover Studio Waamh interview dos and don'ts from real experiences

Q5. Time required for pile cap? Manpower used for pilecap? Method used for pier construction? Deshuttering time for slab?

Ans.

The time required for pile cap, manpower used, method for pier construction, and deshuttering time for slab are project-specific and depend on various factors.

  • The time required for pile cap depends on the size and number of piles, complexity of design, and site conditions.

  • Manpower used for pile cap depends on the size of the project and the equipment used.

  • The method used for pier construction depends on the type of pier, site conditions, and project requirements.

  • Deshuttering ...read more

Add your answer

Q6. What are recent case laws in GST you are aware?

Ans.

Recent case laws in GST

  • GST Council reduced tax rates on COVID-19 related items

  • Madras High Court ruled that input tax credit cannot be denied for technical reasons

  • Delhi High Court ruled that GST cannot be levied on reimbursement of expenses

  • Bombay High Court ruled that GST cannot be levied on compensation received for termination of dealership agreement

Add your answer
Are these interview questions helpful?

Q7. What are the issues faced in your current company in GST litigation?

Ans.

The issues faced in GST litigation in my current company include delayed refunds, incorrect tax calculations, and disputes with vendors.

  • Delayed refunds: Our company has faced challenges in receiving timely refunds from the tax authorities, leading to cash flow issues.

  • Incorrect tax calculations: There have been instances where the GST calculations made by our company were found to be incorrect, resulting in penalties and additional tax liabilities.

  • Disputes with vendors: We hav...read more

Add your answer

Q8. How to make check or maintain elevation of Underground Piping.

Ans.

Maintain elevation of underground piping by using level instruments and proper installation techniques.

  • Use a level instrument to check the elevation of the piping during installation.

  • Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.

  • Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.

  • Consider using supports or anchors to prevent movement of the piping.

  • Properly backf...read more

Add your answer
Share interview questions and help millions of jobseekers 🌟

Q9. Pile bearing capacity and its tests

Ans.

Pile bearing capacity is the ability of a pile to support a load. Tests include static load test, dynamic load test, and integrity test.

  • Pile bearing capacity is determined by conducting load tests on the pile.

  • Static load test involves applying a load to the pile and measuring the settlement.

  • Dynamic load test involves striking the pile with a hammer and measuring the response.

  • Integrity test involves testing the pile for any defects or damage.

  • Factors affecting pile bearing capa...read more

Add your answer

Q10. How do you rate yourself in GST litigation?

Ans.

I rate myself as proficient in GST litigation.

  • I have experience in handling GST litigation cases.

  • I am well-versed with the GST laws and regulations.

  • I have a good success rate in resolving GST disputes.

  • I keep myself updated with the latest developments in GST laws.

  • I have good communication and negotiation skills to resolve disputes.

  • For example, I successfully resolved a GST dispute with the tax authorities for a client by presenting strong legal arguments and negotiating a fav...read more

Add your answer

Q11. How do you negotiate and justify your price is right?

Ans.

To negotiate and justify the right price, I focus on understanding the value proposition, conducting market research, and effectively communicating the benefits.

  • Understand the value proposition of the product or service being offered

  • Conduct market research to determine the competitive pricing and customer expectations

  • Highlight the unique features and benefits of the product or service

  • Clearly communicate the value and return on investment to the customer

  • Be open to negotiation ...read more

Add your answer

Q12. How you plan routine maintenance for your plant ?

Ans.

I plan routine maintenance for my plant by following a systematic approach that includes scheduling, prioritizing, and tracking maintenance tasks.

  • Create a maintenance schedule based on equipment usage and manufacturer recommendations

  • Prioritize maintenance tasks based on criticality and impact on production

  • Track maintenance tasks and their completion status using a computerized maintenance management system (CMMS)

  • Regularly review and adjust the maintenance plan based on feedba...read more

Add your answer

Q13. What is Total Station and benefit of this instrument

Ans.

Total Station is a surveying instrument used for measuring angles and distances with high accuracy.

  • Total Station combines theodolite, electronic distance meter, and software to measure angles and distances.

  • It is commonly used in construction, civil engineering, and land surveying.

  • Benefits include high accuracy, efficiency, and the ability to store and analyze data digitally.

  • Total Station can be used for tasks such as setting out building foundations, conducting topographic su...read more

Add your answer

Q14. On what basis Piling Rigs are classified?

Ans.

Piling rigs are classified based on their method of operation, size, and type of soil they are designed to work with.

  • Method of operation (e.g. impact hammer, rotary drilling)

  • Size (e.g. small, medium, large)

  • Type of soil they are designed to work with (e.g. cohesive soil, granular soil)

Add your answer

Q15. Welding Electrodes for different materials.

Ans.

Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.

  • Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.

  • Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.

  • Cast iron electrodes have a high nickel content to prevent cracking.

  • Aluminum electrodes have a special coating to prevent oxidation and produce a strong weld.

  • Electrodes ...read more

Add your answer

Q16. Pile foundation making steps

Ans.

Pile foundation making steps

  • Determine the load-bearing capacity of the soil

  • Choose the type of pile foundation based on soil conditions and load requirements

  • Excavate the soil to the required depth

  • Insert the pile into the hole and fill it with concrete or grout

  • Allow the concrete or grout to cure before continuing construction

Add your answer

Q17. Procedure for Power Transformer installation

Ans.

Power transformer installation involves several steps to ensure proper functioning and safety.

  • Selecting a suitable location for the transformer based on factors like accessibility, ventilation, and safety regulations

  • Preparing the foundation for the transformer to ensure stability and proper weight distribution

  • Transporting the transformer to the installation site using appropriate equipment and following safety protocols

  • Connecting the transformer to the electrical system, incl...read more

Add your answer

Q18. IS 456 & Provision for Cube Failure

Ans.

IS 456 is a code for concrete design in India. Provision for cube failure refers to the acceptance criteria for concrete cube strength.

  • IS 456 is a code for the design of reinforced concrete structures in India

  • It provides guidelines for the selection of materials, mix design, and testing of concrete

  • Provision for cube failure refers to the acceptance criteria for concrete cube strength

  • The cube strength is determined by testing concrete cubes at 28 days

  • If the cube strength is le...read more

Add your answer

Q19. What is called as designation

Ans.

A designation is a title or position given to an individual within an organization to signify their role or level of authority.

  • Designation is often used interchangeably with job title or rank.

  • It helps define the responsibilities and expectations associated with a particular role.

  • Examples include Manager, Director, Assistant, CEO, etc.

Add your answer

Q20. Transformer testing procedure and results

Ans.

Transformer testing involves various procedures to ensure proper functioning and safety.

  • Testing procedures include insulation resistance, turns ratio, power factor, and winding resistance tests.

  • Results are compared to manufacturer specifications to determine if the transformer is functioning correctly.

  • Testing is crucial to prevent equipment failure and ensure safety in electrical systems.

Add your answer

Q21. What's bending moment?

Ans.

Bending moment is a measure of the bending effect on a structural element subjected to an external force.

  • Bending moment is the algebraic sum of moments about the neutral axis of a cross section of a beam or other structural element.

  • It is a measure of the bending effect caused by external forces acting on the structure.

  • Bending moment can cause the structure to bend or deform.

  • It is calculated by multiplying the force applied to the structure by the perpendicular distance from t...read more

Add your answer

Q22. What is TPM?

Ans.

TPM stands for Total Productive Maintenance, a system that aims to maximize equipment effectiveness and minimize downtime.

  • TPM involves regular maintenance and inspection of equipment to prevent breakdowns

  • It also includes training employees to operate and maintain equipment properly

  • TPM aims to create a culture of continuous improvement and teamwork

  • Examples of TPM tools include visual management, autonomous maintenance, and planned maintenance

  • TPM can lead to increased productiv...read more

Add your answer

Q23. What is MTTR?

Ans.

MTTR stands for Mean Time To Repair. It is the average time taken to repair a system or equipment after a failure.

  • MTTR is a key metric used in maintenance management.

  • It helps in measuring the efficiency of maintenance processes.

  • MTTR can be calculated by dividing the total downtime by the number of repairs.

  • For example, if a machine was down for a total of 10 hours and it took 2 repairs to fix it, the MTTR would be 5 hours.

  • A lower MTTR indicates better maintenance efficiency an...read more

Add your answer

Q24. Testings performed in Transformer

Ans.

Various tests are performed on transformers to ensure their proper functioning and safety.

  • Insulation resistance test to check for any insulation breakdown

  • Turns ratio test to verify the turns ratio of primary and secondary windings

  • Polarity test to ensure correct polarity of windings

  • Winding resistance test to measure the resistance of windings

  • Dielectric strength test to check the insulation strength under high voltage

  • Short circuit test to determine the impedance and losses unde...read more

Add your answer

Q25. Beam lapping at high rise tower i

Ans.

Beam lapping at high rise tower is a construction technique where beams are overlapped to provide additional strength and support.

  • Beam lapping is commonly used in high rise buildings to ensure structural integrity.

  • The overlapping of beams helps distribute the load more evenly and prevent sagging or collapsing.

  • Properly executed beam lapping can increase the overall stability and safety of the building.

  • Examples of beam lapping can be seen in the construction of skyscrapers and ...read more

Add your answer

Q26. Implementation of QMS

Ans.

QMS implementation involves defining processes, policies, and procedures to ensure quality standards are met.

  • Identify the scope and objectives of the QMS

  • Define processes and procedures for each department

  • Establish quality policies and objectives

  • Train employees on QMS requirements

  • Monitor and measure performance

  • Continuously improve the QMS

  • Examples: ISO 9001, Six Sigma, Lean Manufacturing

Add your answer

Q27. Previous projects flow diagram

Ans.

I have created flow diagrams for various projects in my previous roles as an Assistant Manager.

  • Created flow diagrams to visualize project processes and identify areas for improvement

  • Used tools such as Microsoft Visio and Lucidchart to create diagrams

  • Collaborated with team members to ensure accuracy and completeness of diagrams

  • Presented diagrams to upper management to communicate project progress and identify potential roadblocks

Add your answer

Q28. What's indeterminacy

Ans.

Indeterminacy refers to a lack of certainty or predictability in a situation or outcome.

  • Indeterminacy can arise in various fields such as physics, philosophy, and economics.

  • It can refer to situations where multiple outcomes are possible or where information is incomplete.

  • Examples include the uncertainty principle in quantum mechanics and the unpredictability of stock market fluctuations.

Add your answer

Q29. Process involved in SCM

Ans.

SCM involves planning, implementing, and controlling the flow of goods and services from point of origin to point of consumption.

  • Planning: Forecasting demand, setting inventory levels, and developing strategies for sourcing and production.

  • Sourcing: Identifying suppliers, negotiating contracts, and managing relationships.

  • Production: Manufacturing products, managing quality control, and ensuring timely delivery.

  • Inventory Management: Monitoring stock levels, optimizing storage, ...read more

Add your answer

Q30. Controlling the Site Quality

Ans.

Controlling site quality involves implementing processes to ensure consistent and high-quality output.

  • Establishing clear quality standards and guidelines

  • Regularly monitoring and inspecting work to ensure compliance

  • Providing ongoing training and support to employees

  • Addressing any issues or concerns promptly and effectively

  • Using data and analytics to identify areas for improvement

  • Collaborating with other departments and stakeholders to ensure alignment

  • Implementing continuous im...read more

Add your answer

Q31. Principal of Surveying

Ans.

Principles of surveying involve accuracy, precision, reliability, and repeatability in measuring and mapping land.

  • Accuracy: Ensuring measurements are close to the true value.

  • Precision: Consistency and reproducibility of measurements.

  • Reliability: Dependability of surveying equipment and methods.

  • Repeatability: Ability to obtain consistent results when measurements are repeated.

  • Examples: Using GPS for accurate positioning, leveling instruments for precise elevation measurements.

Add your answer

Q32. Cbr value means

Ans.

CBR value stands for California Bearing Ratio, a measure of the strength of a road subgrade material.

  • CBR value is used in civil engineering to evaluate the strength of road subgrade materials.

  • It is expressed as a percentage of the standard load required to penetrate a soil sample at a certain rate.

  • Higher CBR values indicate stronger subgrade materials, while lower values indicate weaker materials.

  • CBR values are important for designing and maintaining roads and pavements.

  • For e...read more

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at Studio Waamh

based on 18 interviews in the last 1 year
1 Interview rounds
Technical Round
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Assistant Manager Interview Questions from Similar Companies

3.9
 • 33 Interview Questions
3.6
 • 13 Interview Questions
4.2
 • 13 Interview Questions
4.1
 • 12 Interview Questions
3.9
 • 12 Interview Questions
3.7
 • 10 Interview Questions
View all
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter