Filter interviews by
I applied via Job Portal and was interviewed in Nov 2023. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Oct 2023. There were 2 interview rounds.
Network is a collection of computers and other devices connected together to share resources and information.
Network refers to the infrastructure that allows devices to communicate with each other.
Networking involves the process of connecting devices together to share resources and information.
Examples of networks include LAN (Local Area Network), WAN (Wide Area Network), and the Internet.
Time To Live (TTL) is a value in data packets that specifies the maximum amount of time the packet can remain in a network before being discarded.
TTL is a field in the IP header of a packet
It is measured in seconds
TTL is used to prevent packets from circulating indefinitely in a network
When a packet reaches a router, the TTL value is decremented by one
If the TTL reaches 0, the packet is discarded
I prefer working in a collaborative and innovative environment with opportunities for growth and learning.
Collaborative work environment
Innovative company culture
Opportunities for growth and learning
I applied via Approached by Company and was interviewed in Oct 2023. There were 3 interview rounds.
M4 in Planning refers to a milestone that marks the completion of a significant phase or deliverable in a project schedule.
M4 is typically used in project management to signify a key point in the project timeline.
It is often associated with the completion of a major task or the achievement of an important project milestone.
M4 can help track progress, identify potential delays, and ensure that the project stays on sched...
I will break down the 300 km laying project into smaller sections, assign resources, estimate durations, and create a detailed schedule.
Break down the project into manageable sections such as 10 km segments
Assign resources including equipment, manpower, and materials to each section
Estimate durations for each activity based on historical data or industry standards
Create a detailed schedule using a scheduling software l...
How will you provide schedule of WTP
I applied via Walk-in and was interviewed in Apr 2024. There was 1 interview round.
Apco Infratech interview questions for popular designations
I applied via Referral and was interviewed in Aug 2023. There was 1 interview round.
Grades of concrete in a mixed batch can be estimated by performing a slump test and conducting compressive strength tests on samples.
Perform a slump test to determine the workability of the concrete mix.
Take samples from the mixed batch and cast test specimens for compressive strength testing.
Conduct compressive strength tests on the specimens to determine the grade of concrete.
Compare the test results with the standar
Site and laboratory tests on bricks and cement are essential for ensuring quality and durability of construction materials.
Site tests for bricks include visual inspection, water absorption test, compressive strength test, and efflorescence test.
Laboratory tests for bricks involve water absorption test, compressive strength test, efflorescence test, and soundness test.
Site tests for cement include checking the color, sm...
Plastering work calculation involves determining the surface area of the wall and the thickness of the plaster.
Calculate the surface area of the wall by multiplying the height and length of each wall segment.
Determine the total surface area to be plastered by adding up the surface areas of all wall segments.
Multiply the total surface area by the desired thickness of the plaster to get the volume of plaster needed.
Consi...
Get interview-ready with Top Apco Infratech Interview Questions
My father is a retired government official who served in the education department. We live in a peaceful neighborhood in the suburbs.
My father is a retired government official
He worked in the education department
We live in a peaceful neighborhood in the suburbs
I was interviewed in Mar 2024.
I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.
CBR requirement of soil is a measure of its strength and ability to support heavy loads.
CBR stands for California Bearing Ratio.
It is a measure of the strength of a soil to support loads applied to it.
Higher CBR values indicate stronger soil.
CBR values are used in designing pavement structures.
Different types of soil have different CBR requirements.
I applied via Walk-in and was interviewed before Apr 2023. There were 2 interview rounds.
GST rate on MS Steel is 18%
GST rate on MS Steel is 18%
MS Steel falls under the 18% GST slab
GST rate on MS Steel products is 18%
The PAN Card number can indicate whether it belongs to a company, firm, or individual.
The fourth character of the PAN Card number indicates the type of holder (P for individual, F for firm, C for company, etc.)
The fifth character of the PAN Card number indicates the first letter of the PAN holder's last name or surname.
For example, if the PAN Card number is ABCDE1234F, the 'F' in the fourth position indicates it belong
In a purchase order, I check for accuracy, completeness, authorization, and adherence to company policies.
Check for accuracy of items, quantities, prices, and terms
Ensure completeness of information such as vendor details, delivery dates, and payment terms
Verify authorization by checking for approval signatures or electronic approvals
Ensure adherence to company policies and procedures regarding procurement
Top trending discussions
Some of the top questions asked at the Apco Infratech interview -
The duration of Apco Infratech interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 129 interviews
Interview experience
based on 1.1k reviews
Rating in categories
Mumbai
10-20 Yrs
₹ 9.23-15.5 LPA
Senior Engineer
135
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
134
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
91
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
76
salaries
| ₹0 L/yr - ₹0 L/yr |
Store Officer
69
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
GMR Group
Reliance Infrastructure
IRB Infrastructure